首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
The operation policy for a single reservoir is applied to a rain water cistern system because the functions of a cistern are similar to a simple single reservoir. Since the cistern is a closed system, water loss is negligible. In this study, a dynamic programming analysis has been made to study the effects of the probable weekly rainfall and the water storage in the cistern towards the water consumption policy. The result of this study indicates that the water consumption rate should be adjusted into a lower rate when the water storage in the cistern is low and/or when the expected probable weekly rainfall is low if the owner of the cistern does not want to risk the chance of an empty cistern. The demand for a reliable method for forecasting weekly rainfall is evident in this study.  相似文献   

2.
Regarding emerging large‐scale reservoir operation models, reports of reservoir operation feedback for hydrologic modeling are rare, and little attention has been paid to flood control. An operation scheme considering multilevel flood control (MLFC) was first proposed in this study, but more reservoir information was needed. Thus, an alternative scheme was proposed that consisted of a modified version of the reservoir operation scheme in the Soil and Water Assessment Tool Model (MSWAT scheme). These schemes were coupled to a land surface and hydrologic model system with feedback, i.e., a system in which reservoir operation can affect the subsequent simulation, and were investigated in the Huai River Basin. The results show reservoir storage and peak flow were generally overestimated by the original SWAT reservoir scheme (SWAT scheme). Compared with the SWAT scheme, the MSWAT scheme successfully reduced the simulated storage and peak flow at the reservoir stations. For the downstream stations, the streamflow simulations were improved at a significance level of 5%. The performances of the MSWAT and MLFC schemes at the reservoir stations were nearly equivalent. Importantly, reservoir operation feedback to hydrologic modeling was necessary because the reservoir operation effects could not be transferred downstream without it. The streamflow simulation of a reservoir station located on a flat plain was less sensitive to feedback than that of a mountain reservoir station.  相似文献   

3.
ABSTRACT: A flood control reservoir protects valuable developments on the downstream flood plain by storing flood waters and releasing them at a rate that will reduce the downstream damage. The water surface level of the flood pool behind the dam can fluctuate considerably during the occurrence of a large magnitude flood causing the inundation of trees, low vegetation, and water based recreation facilities located in those areas of the flood pool area that are normally well above the water level. The amount of damage that will occur in the upper levels of the flood storage area will depend on the depth and duration of the inundation that occurs. This, in turn, is directly related to the operating policy for the reservoir. A dynamic programming optimization model of flood control reservoir operation is presented. This model determines the reservoir operating schedule that minimizes downstream flood damages. Various constraints are added to the model to account for the environmental impacts of long periods of flood storage.  相似文献   

4.
ABSTRACT: Operation of a storage‐based reservoir modifies the downstream flow usually to a value higher than that of natural flow in dry season. This could be important for irrigation, water supply, or power production as it is like an additional downstream benefit without any additional investment. This study addresses the operation of two proposed reservoirs and the downstream flow augmentation at an irrigation project located at the outlet of the Gandaki River basin in Nepal. The optimal operating policies of the reservoirs were determined using a Stochastic Dynamic Programming (SDP) model considering the maximization of power production. The modified flows downstream of the reservoirs were simulated by a simulation model using the optimal operating policy (for power maximization) and a synthetic long‐term inflow series. Comparing the existing flow (flow in river without reservoir operation) and the modified flow (flow after reservoir operation) at the irrigation project, the additional amount of flow was calculated. The reliability analysis indicated that the supply of irrigation could be increased by 25 to 100 percent of the existing supply over the dry season (January to April) with a reliability of more than 80 percent.  相似文献   

5.
ABSTRACT. In the last decade much research has been devoted to applying the systems analysis approach to water resources problems. A popular research goal has been determination of the “best” method of operating a multipurpose reservoir. The goal of this study was to derive the economically optimum flood control diagram for a multipurpose reservoir by systems analysis. The technique employed to optimize the flood control diagram was programmed so that the optimization process could be applied to other multipurpose reservoirs. Two computer programs developed at the U.S. Army Corps of Engineers' Hydrologic Engineering Center were utilized with modifications to simulate the operation of Folsom Reservoir in central California. Economic analyses were incorporated along with an optimization technique into the reservoir operations program; and the resultant program was capable of routing a sequence of monthly reservoir inflows, computing benefits for various flood control diagrams (as dictated by the optimization procedure), and selecting the economically optimum flood control diagram. The univariate gradient technique was the optimization procedure employed. The two computer programs are on file at the Hydrologic Engineering Center in Davis, California.  相似文献   

6.
Lee, Se‐Yeun, Alan F. Hamlet, Carolyn J. Fitzgerald, and Stephen J. Burges, 2011. Methodology for Developing Flood Rule Curves Conditioned on El Niño‐Southern Oscillation Classification. Journal of the American Water Resources Association (JAWRA) 47(1):81‐92. DOI: 10.1111/j.1752‐1688.2010.00490.x Abstract: Regional climate varies on interannual and decadal time scales that in turn affect annual streamflows, flood risks, and reservoir storage deficits in mid‐summer. However, these variable elements of the climate system are generally not included in water resources operating policies that attempt to preserve a balance between flood risk and other water resources system objectives. A methodology for incorporating El Niño‐Southern Oscillation (ENSO) information in designing flood control curves is investigated. An optimization‐simulation procedure is used to develop a set of ENSO‐conditioned flood control rule curves that relate streamflow forecasts to flood control evacuation requirements. ENSO‐conditioned simulated flood risk and storage deficits under current operating policy are used to calibrate a unique objective function for each ENSO classification. Using a case study for the Columbia River Basin, we demonstrate that ENSO‐conditioned flood control curves constructed using the optimization‐simulation procedure consistently reduce storage deficits at a number of interrelated projects without increasing flood risk. For the Columbia Basin, the overall improvements in reservoir operations are relatively modest, and (in isolation) might not motivate a restructuring of flood control operations. However, the technique is widely applicable to a wide range of water resources systems and/or different climate indices.  相似文献   

7.
ABSTRACT: A network flow algorithm has been developed for the optimization of real‐time operation of a multiple reservoir system. Two purposes have been considered in the operation: flood control and hydropower generation. A special network structure was developed which allows the consideration of river routing. A multiobjective formulation is utilized thus allowing generation of a non‐dominated curve. The effect of imperfect forecast on the performance of the real‐time operation model is also evaluated. An application is made to a subsystem of the Brazilian hydroelectric system, located in the Paranapanema river basin. In this case study, the model showed good performance under the largest flood of the historical records.  相似文献   

8.
Designing a surface reservoir involves the concept of reservoir yield. This concept embodies three basic information items: hydrologic regime, active storage volume, and reservoir release policy. In the actual case presented below, the magnitude of the active storage was prescribed by a legal procedure, so that the planning issue became that of determining the reservoir yield given the hydrological information. A stochastic dynamic programming model was formulated to derive a schedule of seasonal optimal reservoir releases and their respective probabilities of occurrence. This schedule is the reservoir yield. The yearly cycle was divided into three seasons representing the actual climatic conditions, and conditional probabilities linking streamflows in consecutive seasons were estimated. An operating policy was postulated, based on the same set of legal decisions that prescribed the active storage volume, and target reservoir releases were assumed. Similarly, target storages at the end of each season were set up. The optimizing/ minimizing criterion in the dynamic programming formulation was the sum of squares of deviations of actual releases and final storage volumes from their respective targets.  相似文献   

9.
ABSTRACT: A decision support system to determine reservoir releases in an uncertain environment during the dry season was developed. A key characteristic of the decision support system is its recursive procedure that processes observations to obtain the most feasible estimate. The system consists of three components: (1) a hydrologic model; (2) an optimization model, and (3) a fuzzy decision model. This methodology was applied to the operation of the Techi reservoir in central Taiwan. Three criteria (public water supply, irrigation, and hydropower) were taken into account within the operation process. Simulation results show that the decision support system can successfully assist government officials in determining operating policy for the Techi reservoir during the dry season. Also, the system is simple enough to lead to a rapid transfer of theoretical knowledge into practice.  相似文献   

10.
Within the past few years, a number of papers have been published in which stochastic mathematical programming models, incorporating first order Markov chains, have been used to derive alternative sequential operating policies for a multiple purpose reservoir. This paper attempts to review and compare three such mathematical modeling and solution techniques, namely dynamic programming, policy iteration, and linear programming. It is assumed that the flows into the reservoir are serially correlated stochastic quantities. The design parameters are assumed fixed, i.e., the reservoir capacity and the storage and release targets, if any, are predetermined. The models are discrete since the continuous variables of time, volume, and flow are approximated by discrete units. The problem is to derive an optimal operating policy. Such a policy defines the reservoir release as a function of the current storage volume and inflow. The form of the solution and some of the advantages, limitations and computational efficiencies of each of the models and their algorithms are compared using a simplified numerical example.  相似文献   

11.
ABSTRACT: The flood hydroclimatology of the Grand Forks flood of April 1997, the most costly flood on a per capita basis for a major metropolitan area in United States history, is analyzed in terms of the natural processes that control spring snowmelt flooding in the region. The geomorphological characteristics of the basin are reviewed, and an integrated assessment of the hydroclimatological conditions during the winter of 1996 to 1997 is presented to gain a real‐world understanding of the physical basis of this catastrophic flood event. The Grand Forks flood resulted from the principal flood‐producing factors occurring at either historic or extreme levels, or at levels conducive to severe flooding. Above normal fall precipitation increased the fall soil moisture storage and reduced the spring soil moisture storage potential. A concrete frost layer developed that effectively reduced the soil infiltration capacity to zero. Record snowfall totals and snow cover depths occurred across the basin because of the unusual persistence of a blocking high circulation pattern throughout the winter. A severe, late spring blizzard delayed the snowmelt season and replenished the snow cover to record levels for early April. This blizzard was followed by a sudden transition to an extreme late season thaw due to the abrupt breakdown of the blocking circulation pattern. The presence of river ice contributed to backwater effects and affected the timing of tributary inflows to the main stem of the Red River. Only the absence of spring rains prevented an even more catastrophic flood disaster from taking place. This paper contributes to our understanding of the flood hydroclimatology of catastrophic flood events in an unusual flood hazard region that possesses relatively flat terrain, a north‐flowing river, and an annual peak discharge time series dominated by spring snowmelt floods.  相似文献   

12.
ABSTRACT: An heuristic iterative technique based upon stochastic dynamic programming is presented for the analysis of the operation of a three reservoir ‘Y’ shaped hydroelectric system. The technique is initiated using historical inflow data for the downstream reservoir. At each iteration the optimal policies for the downstream hydroelectric generating unit are used to provide relative weightings or targets for operation of upstream reservoirs. New input inflows to the downstream reservoir are then obtained by running the historical streamflow record through the optimal policies for the upstream reservoirs. These flows are then used to develop a new operating policy for the downstream reservoir and hence new targets for the upstream reservoirs. The process is continued until the operating policies for each reservoir provide the same overall system benefit for two successive iterations. Results obtained from the procedure are compared to the results obtained by historical operation of the system. The procedure is shown to develop operating policies which give benefits which are as close to the historical benefits as can be expected given the choice of the number of storage state variables.  相似文献   

13.
Gong, Gavin, Lucien Wang, Laura Condon, Alastair Shearman, and Upmanu Lall, 2010. A Simple Framework for Incorporating Seasonal Streamflow Forecasts Into Existing Water Resource Management Practices. Journal of the American Water Resources Association (JAWRA) 46(3):574-585. DOI: 10.1111/j.1752-1688.2010.00435.x Abstract: Climate-based streamflow forecasting, coupled with an adaptive reservoir operation policy, can potentially improve decisions by water suppliers and watershed stakeholders. However, water suppliers are often wary of straying too far from their current management practices, and prefer forecasts that can be incorporated into existing system modeling tools. This paper presents a simple framework for utilizing streamflow forecasts that works within an existing management structure. Climate predictors are used to develop seasonal inflow forecasts. These are used to specify operating rules that connect to the probability of future (end of season) reservoir states, rather than to the current storage, as is done now. By considering both current storage and anticipated inflow, the likelihood of meeting management goals can be improved. The upper Delaware River Basin in the northeastern United States is used to demonstrate the basic idea. Physically plausible climate-based forecasts of March-April reservoir inflow are developed. Existing simulation tools and rule curves for the system are used to convert the inflow forecasts to reservoir level forecasts. Operating policies are revised during the forecast period to release less water during forecasts of low reservoir level. Hindcast simulations demonstrate reductions of 1.6% in the number of drought emergency days, which is a key performance measure. Forecasts with different levels of skill are examined to explore their utility.  相似文献   

14.
ABSTRACT: A methodology for assessing reservoir management was applied to the historical conflict between winter fish and wildilife flows below Island Park Reservoir on Henrys Fork of the Snake River and the fulfillment of storage water rights. The methodology consists of (1) identifying impacts of flow regulation, (2) quantifying relationships among variables affecting physical reservoir fill, and (3) assessing effects of these discharges on the fulfillment of water rights in the context of a larger system of interrelated reservoirs. Winter (storage season) flows are critical to management of fish and wildlife populations below Island Park Dam, but flow regulation has resulted in decreased winter discharge. Allowable winter flows are a function of inflow, length of storage season, reservoir content at the start of storage season, and potential for downstream capture of excess storage season water discharged at Island Park. Modeling results indicate that winter flows in the range of those recommended for fish and wildlife management are attainable during average years but not during years when initial reservoir content is low. The methodology was successful in quantifying information useful to decision makers in a variety of agencies and disciplines and could be applied to solve water management problems on other regulated river systems.  相似文献   

15.
This paper presents a real-time simulation-optimization operation procedure for determining the reservoir releases at each time step during a flood. The proposed procedure involves two models, i.e., a hydrological forecasting model and a reservoir operation model. In the reservoir operation model, this paper compares two flood-control operation strategies for a multipurpose multireservoir system. While Strategy 1 is the real-time joint reservoir operations without using the balanced water level index (BWLI) method, Strategy 2 involves real-time joint reservoir operations using the BWLI method. The two strategies presented are formulated as mixed-integer linear programming (MILP) problems. The idea of using the BWLI method is derived from the HEC-5 program developed by the US Army Corps of Engineers. The proposed procedure has been applied to the Tanshui River Basin system in Taiwan using the 6h ahead forecast data of six typhoons. A comparison of the results obtained from the two strategies reveals that Strategy 2 performs much better than Strategy 1 in determining the reservoir real-time releases throughout the system during flood emergencies in order to minimize flooding, while maintaining all reservoirs in the system in balance if possible. Consequently, the proposed model using the BWLI method demonstrates its effectiveness in estimating real-time releases.  相似文献   

16.
ABSTRACT. For a multipurpose single reservoir a deterministic optimal operating policy can be readily devised by the dynamic programming method. However, this method can only be applied to sets of deterministic stream flows as might be used repetitively in a Monte Carlo study or possibly in a historical study. This paper reports a study in which an optimal operating policy for a multipurpose reservoir was determined, where the optimal operating policy is stated in terms of the state of the reservoir indicated by the storage volume and the river flow in the preceding month and uses a stochastic dynamic programming approach. Such a policy could be implemented in real time operation on a monthly basis or it could be used in a design study. As contrasted with deterministic dynamic programming, this method avoids the artificiality of using a single set of stream flows. The data for this study are the conditional probabilities of the stream flow in successive months, the physical features of the reservoir in question, and the return functions and constraints under which the system operates.  相似文献   

17.
The emphasis upon comprehensive regional water resources planning in the past decade has encouraged the hydrologic engineer to take advantage of improvements in technology to develop new hydrologic engineering techniques for use in regional planning studies. The new techniques are necessary because the traditional hydro-logic engineering techniques are not always consistent with the increased scope and diversified objectives of regional planning studies. The Hydrologic Engineering Center has been involved in aiding in the development of some of these new techniques as the result of studies that have been made in cooperation with other Corps of Engineers offices. Most of the new techniques being developed emphasize computational procedures developed specifically for use with electronic computers. Applications of new techniques range from framework studies to planning of day-to-day operation criteria. Studies recently completed or in progress include: (1) development of a regional flood control site screening plan for the North Atlantic Region study; (2) use of streamflow simulation for planning and operation of the Missouri River mainstem projects; (3) development of an operation plan for the Arkansas-White-Red Rivers Reservoir System; (4) standard project flood and flood frequency estimates for the Colorado River Basin Framework Study; and several other projects which are described in more detail in the following paragraphs. One of the initial efforts in regional analysis was the formulation of procedures for determining standard project flood estimates for southern California coastal streams using generalized criteria. Techniques were developed that were readily adaptable to the computer and which would determine representative unit hydrographs, losses and standard project precipitation for any location in the study area. The resulting standard project flood estimates were consistent with the accuracy required for framework studies; however, they could be refined easily for design studies. As a result of the recent drought in the Northeastern United States, a study was made to evaluate both present and future water supply reservoirs in that region. The study consisted of computerized studies of the hypothetical operation of a large number of reservoirs as a system. The reservoirs were on many different streams throughout the region and had varying constraints, depending upon the stream and the state in which the reservoir was located. Since only preliminary data was available on the proposed reservoirs, it was not possible to refine the studies to a large degree. However, the models of each system can be easily refined as more accurate design data become available. The development of a computer-aided screening procedure for use in evaluating several hundred potential reservoir sites for the Missouri River Basin Comprehensive Framework Study is a third example of regional analysis. The adopted procedures used available physical, hydrologic, and climatologic data in estimating reservoir storage requirements throughout the basin. Because the procedure is based upon the techniques often used in more refined studies, it is expected that the results of the screening study will be very useful in future planning and design work. Shortcomings of some of the traditional techniques have helped in the development of new techniques. For maximum usefulness the new techniques should: (1) be consistent with the scope, objectives, and requirements of the overall study; (2) use all available physical, hydrologic, and climatologic data without requiring extensive data which may not be available; (3) take full advantage of the capabilities of the computer and associated data processing systems; and (4) produce results which form a firm basis for future, more detailed, planning and design studies instead of being limited in usefulness largely to the study at hand.  相似文献   

18.
A user-friendly decision support system (DSS) for long-term reservoir operation has been introduced with an eye to practical use. The system can assist reservoir managers to work out applicable rules for real-time reservoir operation. The DSS model has already been applied experimentally to the main reservoirs in Taiwan with success. In this study, Tsengwen Reservoir, the largest reservoir in Taiwan, was chosen to test the applicability of the model. The simulation results show that the DSS is not only well suited to long-term reservoir operation, but also very easily applied. A handy DSS was designed for user-friendly computer interaction with Microsoft Excel in the Windows system. Users can survey on-line reservoir operation with a browser on the World Wide Web (WWW). The uniform resource locator of the DSS is http://wrm.hre.ntou.edu.tw. . So users may easily access the DSS via the Internet.  相似文献   

19.
ABSTRACT: The goal programming approach for multipurpose reservoir operation has been proposed and applied to the Bhadra reservoir system, having irrigation and hydropower production as dual purposes, in India. The objective of the model is to satisfy sequentially a series of operating criteria. Two goal programming models, one with the objective function as minimizing the deviations from storage targets and the other with the objective function as minimizing the deviations from release targets, have been formulated and applied to the reservoir system under study. The results proved that the model with release targets is preferred over the model with storage targets for determining operational policies for multipurpose reservoir system.  相似文献   

20.
ABSTRACT: Two major objectives in operating the multireservoir system of the Upper Colorado River basin are maximization of hydroelectric power production and maximization of the reliability of annual water supply. These two objectives conflict. Optimal operation of the reservoir system to achieve both is unattainable. This paper seeks the best compromise solution for an aggregated reservoir as a surrogate of the multireservoir system by using two methods: the constraint method and the method of combined stochastic and deterministic modeling. Both methods are used to derive the stationary optimal operating policy for the aggregated reservoir by using stochastic dynamic programming but with different objective functions and minimum monthly release constraints. The resulting operating policies are then used in simulated operation of the reservoir with historical inflow records to evaluate their relative effectiveness. The results show that the policy obtained from the combination method would yield more hydropower production and higher reliability of annual water supply than that from the constraint-method policy.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号