首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
    
ABSTRACT: A network flow algorithm has been developed for the optimization of real‐time operation of a multiple reservoir system. Two purposes have been considered in the operation: flood control and hydropower generation. A special network structure was developed which allows the consideration of river routing. A multiobjective formulation is utilized thus allowing generation of a non‐dominated curve. The effect of imperfect forecast on the performance of the real‐time operation model is also evaluated. An application is made to a subsystem of the Brazilian hydroelectric system, located in the Paranapanema river basin. In this case study, the model showed good performance under the largest flood of the historical records.  相似文献   

2.
ABSTRACT: The value of streamflow forecasts in reservoir operation depends on a number of factors and may vary considerably. Assessment of forecast benefits is presented here for three specific systems. Statistical streamflow models of increasing forecasting ability are coupled with a recently developed stochastic control method in extensive simulation experiments. The performance of the system is statisticafly evaluated with regard to energy generation and flood and drought prevention. The results indicate that forecast benefits are system specific and may range from quite substantial to fairly minimal.  相似文献   

3.
    
ABSTRACT: An approach is developed for incorporating the uncertainty of parameters for estimating runoff in the design of polder systems in ungaged watersheds. Monte Carlo Simulation is used to derive a set of realizations of streamflow hydrographs for a given design rainstorm using the U. S. Soil Conservation Service (SCS) unit hydrograph model. The inverse of the SCS curve number, which is a function of the antecedent runoff condition in the SCS model, is the random input in the Monte Carlo Simulation. Monte Carlo realizations of streamfiow hydrographs are used to simulate the performance of a polder flood protection system. From this simulation the probability of occurrence of flood levels for a particular hydraulic design may be used to evaluate its effectiveness. This approach is demonstrated for the Pluit Polder flood protection system for the City of Jakarta, Indonesia. While the results of the application indicate that uncertainty in the antecedent runoff condition is important, the effects of uncertainty in rainfall data, in additional runoff parameters, such as time to peak, in the hydraulic design, and in the rainfall-runoff model selected should also be considered. Although, the SCS model is limited to agricultural conditions, the approach presented herein may be applied to other flood control systems if appropriate storm runoff models are selected.  相似文献   

4.
ABSTRACT: A flood control reservoir protects valuable developments on the downstream flood plain by storing flood waters and releasing them at a rate that will reduce the downstream damage. The water surface level of the flood pool behind the dam can fluctuate considerably during the occurrence of a large magnitude flood causing severe impacts on shoreline vegetation and water based recreation facilities located in the flood pool. A mathematical simulation model describing shoreline vegetative succession in response to flooding is presented. Plant species are grouped into ecologically similar compartments. Differential equations describing compartment intrinsic growth, intraspecies competition, interspecies competition, and other growth limiting factors are solved numerically. The model is used to evaluate the impacts of various operating policies on plant succession for a new reservoir in Central Iowa.  相似文献   

5.
ABSTRACT: A flood control reservoir protects valuable developments on the downstream flood plain by storing flood waters and releasing them at a rate that will reduce the downstream damage. The water surface level of the flood pool behind the dam can fluctuate considerably during the occurrence of a large magnitude flood causing the inundation of trees, low vegetation, and water based recreation facilities located in those areas of the flood pool area that are normally well above the water level. The amount of damage that will occur in the upper levels of the flood storage area will depend on the depth and duration of the inundation that occurs. This, in turn, is directly related to the operating policy for the reservoir. A dynamic programming optimization model of flood control reservoir operation is presented. This model determines the reservoir operating schedule that minimizes downstream flood damages. Various constraints are added to the model to account for the environmental impacts of long periods of flood storage.  相似文献   

6.
ABSTRACT: Land development projects that are presumed to have regional impact according to the Florida Land and Water Management Act of 1972 are forced to minimize adverse environmental impact through a detailed procedure called Application for Development Approval (ADA). In Southeast Florida, as part of this review process, the water-supply and flooding conflicts must be resolved with the regional water management agency, Central and South Florida Flood Control District (FCD). This paper discusses the efforts to resolve these two conflicts for a large proposed residential development in Broward County, Florida. The project, as envisioned by Leadership Housing, Inc., places 25,000 dwelling units on the 3,960-acre site. The project is located in a flood prone area of the Hillsboro Canal Basin and is at the northwest edge of the Biscayne Aquifer. Significant land modification is required to flood-proof the project. The water-supply conflict was resolved only when the FCD was assured that the ultimate water demand for the project was balanced by the natural recharge to the site. Significant water-resources studies were required to produce these conflict resolutions.  相似文献   

7.
    
. Water Reservoir Systems were investigated for urban areas as an alternative or complement to storm water drainage systems for flood control which could provide benefits in water conservation and reduce drainage system costs. The study consisted of: (1) gathering of engineering data on the topographical, hydrological, and precipitation characteristics of the area and urban development and economic statistics  相似文献   

8.
ABSTRACT: The frequent high water levels in Chisago Chain of Lakes, located in east-central Minnesota, have caused extensive flood damages. Recent floods raised the concern of the local property owners and they pressured the Chisago County Board of Managers to initiate a study of alternative lake control levels. A study was carried out to identify potential flood control alternatives, screen out the most promising feasible alternatives, and recommend the most cost-effective flood control measure. Several flood control alternatives were considered - eight of them were analyzed and evaluated in detail. A statistical method was used to estimate the expected annual flood damages under existing and future conditions. The effect of all proposed control measures on the annual flood damage reductions (benefits) were determined. Detailed benefit/cost analyses were carried out to evaluate the economic feasibility of alternatives. The effect of potential flood control measures on the environment was also studied. The economic analysis of the most cost-effective alternative did not strongly support artificial lake level control, therefore the decision-making authorities were even more firm in their position to maintain the present condition and chose the Null Alternative as the most suitable alternative.  相似文献   

9.
ABSTRACT: The determination of optimum reservoir operating rules for reservoirs with multiple conflicting objectives is still a difficult task - despite many publications in this field. In this paper a three-step Multi Objective Decision Making (MODM) method is presented, the emphasis of which is placed on the necessity to make the work easy for the decision maker, which many MODM techniques fail to achieve. The method is applied to the development of a compromise optimum operating rule for a multi-purpose reservoir. In the first step of the method stochastic DP is chosen which is combined with the “weighting method” allowing combination of various objectives into one objective function. By systematically varying the weights for the objectives a large number of pareto optimum reservoir operating rules is generated. In the second step of the method the performance of all these operating rules is tested with the aid of a model simulating reservoir operation. The results are statistically analyzed and the reliabilities for attaining the various objectives are computed. The third step of the model applies another MODM technique which allows the decision maker - in a computer dialog - to select his optimum reservoir operating rule from the large number of pareto optimum solutions generated in step 1. Here he can specify his preferences for the various objectives. For this purpose two alternative MODM techniques are offered: Compromise Programming and the SEMOPS method. Their performance is shown along with the generation and selection of operating rules for the multi-objective Wupper reservoir system in Germany.  相似文献   

10.
The operation policy for a single reservoir is applied to a rain water cistern system because the functions of a cistern are similar to a simple single reservoir. Since the cistern is a closed system, water loss is negligible. In this study, a dynamic programming analysis has been made to study the effects of the probable weekly rainfall and the water storage in the cistern towards the water consumption policy. The result of this study indicates that the water consumption rate should be adjusted into a lower rate when the water storage in the cistern is low and/or when the expected probable weekly rainfall is low if the owner of the cistern does not want to risk the chance of an empty cistern. The demand for a reliable method for forecasting weekly rainfall is evident in this study.  相似文献   

11.
ABSTRACT. High percentage of imperviousness in the city is the source of storm runoff. Roof area contributes significantly to the imperviousness. An attempt to make use of roofs as urban flood control device and water conservation measure is advocated. Two different schemes, one for built-up industrial-commercial area, the other for residential area, are suggested. The former utilizes the roof as detention reservoir for flood control, the latter employs recharge pit to convert runoff into ground water resource. The proposed schemes are not only hydrologically, hydraulically and structurally sound but also economically feasible. It is worth considering in the future planning of urban renewal and urban development.  相似文献   

12.
    
ABSTRACT: Flood control operations are generally complex in nature, as they are often associated with a large quantity of uncertain factors in combination of noncommensurable criteria. It has been found that the use of fuzzy set theory coupled with multicriterion decision making (MCDM) methods is very promising. In this paper, a multicriterion fuzzy recognition model is established for flood control operations. A subjective preference and iterative weights method is proposed for weight assessment. First, an initial solution of criteria weights, which is directly analyzed from the selected alternatives, is obtained by using the proposed fuzzy recognition model. Then, according to their knowledge related to real time flood operations, operators may modify the initial weights if necessary. When the relative membership grades of alternatives belonging to all rankings are fixed, a defuzzification equation is used to calculate the rank feature value vector. Based on the rank feature value vector, one can evaluate the alternative set. Two flood operation cases are provided to illustrate the application of the proposed model. With the incorporation of the operator's knowledge related to flood operations, the proposed model is flexible in giving weights and realizes more practical flood control operations.  相似文献   

13.
ABSTRACT: Over the last 30 years, average annual riverine flood damages have exceed $2 billion. Damages associated with the Mississippi River Flood of 1993 exceeded $12 billion and these costs do not include the non-quantifiable, human impacts of this disaster. In a report submitted to the White House in June 1994, a federal interagency floodplain management review committee proposed better ways to manage the nation's floodplains. The committee indicated that the 1993 Mississippi River flood was the result of a significant hydrometeorological event, that federal flood control efforts in the Mississippi basin had prevented nearly $20 billion in potential damages, and that, in spite of federal flood damage reduction efforts, throughout the nation people and property remain at risk to inevitable future flooding. It recommended that the division of decision and cost-sharing responsibilities among federal, state and local governments be more clearly defined, and that the nation adopt a strategy of, sequentially, avoiding inappropriate use of the flood-plain, minimizing vulnerability to damage through both nonstruc-tural and structural means, and mitigating damages as they occur. The report did not call for abandonment of human use of the flood-plain but argued for full consideration of the economic, social and environmental costs and benefits of all future floodplain activity.  相似文献   

14.
ABSTRACT: Two simple interactive techniques are developed and illustrated by means of two different real-life examples in Thailand. The first technique, Evolutionary Sequential Multiobjective Problem Solving (ESEMOPS), is an open-ended algorithm designed for planning problems with discrete alternatives. ESEMOPS helps the decision making group (DMG) develop progressively a preference function over the alternatives. The algorithm follows an evolutionary “breeding” strategy to generate a small set of good alternative solutions. This heuristic search, which does not guarantee that the adopted ‘satisfactum’ is an efficient solution leads to plausible results when applied to the planning of the Mae Khlong-Chao Phraya interbasin water transfer and irrigation system. The second algorithm, Search Beam Method (SBM) is essentially a series of one-dimensional searches for an efficient point along a “beam” passing through a goal point. Repeated search towards displayed goal points is leading to a set of quasi non-dominated solutions. SBM is illustrated by the Ubol Ratana reservoir control problem with the two conflicting objectives of energy generation and irrigation water supply. Neither ESEMOPS nor SBM require that weights, utilities, or pairwise tradeoffs be assessed. These features have been very much appreciated by a real DMG presented with the two techniques.  相似文献   

15.
ABSTRACT: Two dynamic programming models — one deterministic and one stochastic — that may be used to generate reservoir operating rules are compared. The deterministic model (DPR) consists of an algorithm that cycles through three components: a dynamic program, a regression analysis, and a simulation. In this model, the correlation between the general operating rules, defined by the regression analysis and evaluated in the simulation, and the optimal deterministic operation defined by the dynamic program is increased through an iterative process. The stochastic dynamic program (SDP) describes streamflows with a discrete lag-one Markov process. To test the usefulness of both models in generating reservoir operating rules, real-time reservoir operation simulation models are constructed for three hydrologically different sites. The rules generated by DPR and SDP are then applied in the operation simulation model and their performance is evaluated. For the test cases, the DPR generated rules are more effective in the operation of medium to very large reservoirs and the SDP generated rules are more effective for the operation of small reservoirs.  相似文献   

16.
    
Triggered by recent flood catastrophes and increasing concerns about climate change, scientists as well as policy-makers increasingly call for making long-term water policies to enable a transformation towards flood resilience. A key question is how to make these long-term policies adaptive so that they are able to deal with uncertainties and changing circumstances. The paper proposes three conditions for making long-term water policies adaptive, which are then used to evaluate a new Dutch water policy approach called ‘Adaptive Delta Management’. Analysing this national policy approach and its translation to the Rotterdam region reveals that Dutch policy-makers are torn between adaptability and the urge to control. Reflecting on this dilemma, the paper suggests a stronger focus on monitoring and learning to strengthen the adaptability of long-term water policies. Moreover, increasing the adaptive capacity of society also requires a stronger engagement with local stakeholders including citizens and businesses.  相似文献   

17.
While storm water detention basins are widely used for controlling increases in peak discharges that result from urbanization, recent research has indicated that under certain circumstances detention storage can actually cause increases in peak discharge rates. Because of the potential for detrimental downstream effects, storm water management policies often require downstream effects to be evaluated. Such evaluation requires the design engineer to collect additional topographic and land use data and make costly hydrologic analyses. Thus, a method, which is easy to apply and which would indicate whether or not a detailed hydrologic analysis of downstream impacts is necessary, should decrease the average cost of storm water management designs. A planning method that does not require either a large data base or a computer is presented. The time co-ordinates of runoff hydrographs are estimated using the time-of-concentration and the SCS runoff curve number; the discharge coordinates are estimated using a simple peak discharge equation. While the planning method does not require a detailed design of the detention basin, it does provide a reasonably accurate procedure for evaluating whether or not the installation of a detention basin will cause adverse downstream flooding.  相似文献   

18.
ABSTRACT: Dams were built by the U. S. Army Corps of Engineers on the Kaskaskia River at Shelbyville and Carlyle in Illinois, in 1969 and 1967, respectively. The operation of the Shelbyville and Carlyle Lakes has changed over the years because of considerably lower bankfull channel capacities downstream of the dams than were adopted in the project designs. This study was conducted to review the present operation policy. Intent was to derive a policy for maximizing the overall benefits (or minimizing the overall damages) and to compare these benefits or damages with those with the present policy. The operating rules were optimized through a simulation model which was structured considering the physical nature of the system and the desirable operation in the best interest of various beneficial uses. The expected annual value of overall benefits from recreation and agriculture is shown to increase by $0.2 million with the optimal policy. With the optimal operation, the overall damages are reduced by 76 percent on the average over the 24 years of flow record at Shelbyville and Carlyle.  相似文献   

19.
    
ABSTRACT: Hydrologic and economic information must be integrated in flood plain management. This study describes an integrated approach which includes consideration of the hydrologic, hydrodynamic, physical, and economic components of the total system. On the basis of these components, a theoretical model is proposed which provides a rational procedure for estimating flood damages from projections of economic development within an area. The utility of the model is demonstrated by applying it to a flood-prone region in Southern Quebec, Canada.  相似文献   

20.
ABSTRACT: A framework for combining economic factors and the hydrolo of detention basins is provided. The general development of economic production functions for water quality (sediment) and flood control is discussed. Example production functions are generated to compare water quality (sediment control only) and flood control. For the given example, the design of a detention basin for downstream sediment control is economically unwarranted. When compared to on-site detention facilities, regional detention structures appear to be more practical from an economic standpoint for water quality control. Since sediment was the only water quality parameter assessed, it is entirely possible that the design of a detention basin for water quality control would be justified if the effects of all pollutants of concern could be quantified. Policy aspects of detention facilities that relate to the economics of water quality control are also discussed.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号