首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
2.
The guild concept applied to management of bird populations   总被引:5,自引:0,他引:5  
Alternative ways to apply the guild concept to wildlife management are evaluated here. I reject the idea that indicator species can be selected for each bird guild to reduce costs of environmental assessment and monitoring. Promise is seen, however, in the option of using whole guilds to indicate the capability of habitat zones to support populations of wildlife species. It may be adequate for most management purposes to delineate guilds only for species that use an environment for breeding, because transients and winter residents probably use the same zones of the habitat in the same ways. Potential guilds are identified by cells of a two-dimensional matrix, the axes identifying primary feeding and nesting zones. Some questions may be answered with guilds as delineated by all cells in the matrix. Alternatively, larger guilds can be formed by grouping all species in each column or row of the matrix to identify, for example, all species that depend on tree canopies for foraging, or tree boles for nesting. One can also consider separately the resident breeders, migrant breeders, and winter residents to obtain insights into whether observed changes in numbers of birds in a guild are a result of conditions locally or elsewhere. I conclude that the guild concept probably has a place in wildlife management, but much testing must be done before it is widely applied.  相似文献   

3.
A new method of assessing cumulative effects of human activities on bird and mammal communities of riparian-wetland areas was developed by using response guilds to reflect how species theoretically respond to habitat disturbance on a landscape level. All bird and mammal species of Pennsylvania were assigned values for each response guild using documented information for each species, to reflect their sensitivity to disturbances; high guild scores corresponded to low tolerance toward habitat disturbance. We hypothesized that, given limited time and resources, determining how wildife communities change in response to environmental impacts can be done more efficiently with a response-guild approach than a single-species approach. To test the model, censuses of birds and mammals were conducted along wetland and riparian areas of a protected and a disturbed watershed in central Pennsylvania. The percent of bird species with high response-guild scores (i.e., species that had specific habitat requirements and/or were neotropical migrants) remained relatively stable through the protected watershed. As intensity of habitat alteration increased through the disturbed watershed, percentage of bird species with high response-guild scores decreased. Only 2%–3% of the neotropical migrants that had specific habitat requirements were breeding residents in disturbed habitats as compared to 17%–20% in reference areas. Species in the edge and exotic guild classifications (low guild scores) were found in greater percentages in the disturbed watershed. Composition of mammalian guilds showed no consistent pattern associated with habitat disturbance. Avian response guilds reflected habitat disturbance more predictively than mammalian response guilds.  相似文献   

4.
Use of the guild concept in environmental impact assessment   总被引:1,自引:0,他引:1  
The purpose of this paper was to clarify and expand several ideas concerning use of the guild concept in environmental impact assessment Background material on the concept and examples of its use are given. It is argued that for purposes of environmental assessment a resource-based guild approach is preferable to a taxonomic-based approach. Validity of the guild concept, problems in classifying species into guilds, implications of guild membership, and usefulness of guild analyses are discussed. I conclude that only with a thorough knowledge of both its limitations and benefits will it be possible to fully use the guild concept for understanding organizational processes in communities and ecosystems and for assessing environmental impacts.  相似文献   

5.
The newly instituted management plan for the Pemigewasset Wilderness area of New Hampshire, USA, which relies principally on providing information to visitors, represents a departure from traditional plans. Logit analysis of survey data indicates limited evidence of the plan having much direct impact on visitor behavior. There is evidence of success in information dissemination to area users; however, the type of information that is being relayed to backcountry users does not appear to be that which the management plan is attempting to promote.  相似文献   

6.
Life cycle assessment-based environmental product declarations (EPDs) require the inclusion of biodiversity impacts across the entire supply chain. The objective of this study is to test the applicability of a Scandinavian biodiversity assessment tool, developed specifically for use with EPD applications, in an African desert environment, linking the industry types power generation and mining. For this purpose, a GIS-based spatial analysis tool—the biotope method—was adapted to a framework approach which allowed the selection of more suitable, site-specific biodiversity indicators. The biotope method provides a step-by-step process of defining system boundaries, mapping biotopes, categorizing biotopes based on site-specific indicators, and evaluating change in biotope status “before” and “after” the impact. The development of site-specific indicators was piloted in this study and determined by the affected ecosystem and the status of knowledge on biodiversity in this geographic area. Thus plants were used as indicators for biodiversity, and red-list status and endemism constituted the prime criteria for conservation value of plants. This in turn represented the key criterion for classifying biotopes. The tested biodiversity assessment tool has potential for application in different environments and operational settings but leaves room for improvement by including secondary impacts in the assessment and using a wider range of taxa for indicators of biodiversity.  相似文献   

7.
This paper describes and applies EDEN-E, an operational method for the environmental evaluation of dairy farms based on the life cycle assessment (LCA) conceptual framework. EDEN-E requires a modest amount of data readily available on-farm, and thus can be used to assess a large number of farms at a reasonable cost. EDEN-E estimates farm resource use and pollutant emissions mostly at the farm scale, based on-farm-gate balances, amongst others. Resource use and emissions are interpreted in terms of potential impacts: eutrophication, acidification, climate change, terrestrial toxicity, non-renewable energy use and land occupation. The method distinguishes for each total impact a direct component (impacts on the farm site) and an indirect component (impacts associated with production and supply of inputs used). A group of 47 dairy farms (41 conventional and six organic) was evaluated. Expressed per 1000 kg of fat-and-protein-corrected milk, total land occupation was significantly larger for organic than for conventional farms, while total impacts for eutrophication, acidification, climate change, terrestrial toxicity, and non-renewable energy use were not significantly different for the two production modes. When expressed per ha of land occupied all total impacts were significantly larger for conventional than organic farms. This study largely confirms previously published findings concerning the effect of production mode on impacts of dairy farms. However, it strikingly reveals that, for the set of farms examined, the contribution of production mode to overall inter-farm variability of impacts was minor relative to inter-farm variability within each of the two production modes examined. The mapping of impact variability through EDEN-E opens promising perspectives to move towards sustainable farming systems by identifying the structural and management characteristics of the farms presenting the lowest impacts.  相似文献   

8.
A protocol for risk assessment at inactive hazardous material disposal sites has been developed by using mathematical modeling and estimation techniques. Compared with ranking models, the protocol yields quantitative results with a minimum of input data that may be used to select among management, scientific, or engineering alternatives for the site. This article reviews the background, presents the protocol, illustrates the application of the protocol, and demonstrates the use of the protocol in conjunction with thecritical environmental area concept. Comparisons are also presented with other model systems such as the EPA HRS.  相似文献   

9.
To help determine whether plants should be grouped into guilds for environmental impact assessment, the responses of six members of a guild of deciduous forest herbs to selective tree harvesting were compared. Harvesting operations themselves (tree cutting and skidding) had little effect on five of the six species but the sixth species decreased more in cut plots than in uncut plots. Subsequent microclimatic changes, resulting from tree cutting, also affected guild members differently. In the first year after cutting, two species increased more in cut plots than in uncut plots, while three other species did not change in frequency of occurrence and the sixth species decreased more in cut plots than in uncut plots. This inconsistent response of guild members to tree harvesting suggests that caution should be exercised in using guilds to assess plant response to environmental change.  相似文献   

10.
Environmental impact assessment (EIA) is based on the results of effect prediction. In general, there is much diversity in the expertise in the field of environmental prediction between the different categories of actors involved in EIA. In practice it became obvious in The Netherlands that the accessibility and comprehensibility of existing relevant information was insufficient. For improvement, a series of systematic handbooks on effect prediction, useful for all categories of actors, has been developed in The Netherlands. In this way, the selection of effect prediction methods to be used in concrete circumstances is improved and speeded up for all parties involved in environmental prediction. After a discussion of the purpose of the handbook, the realization and structure of the series are presented. Finally, the use and (potential) benefits of the handbooks for environmental management are indicated.  相似文献   

11.
This paper focuses on the assessment of farm management indicators and argues that typologies are a necessary tool for comprehensive environmental assessments. In the paper Andersen et al., [(2004a). Farming and the Environment in the European Community--using agricultural statistics to provide farm management indicators. Paper presented at OECD Expert meeting, March 2004, New Zealand. < http:webdomino1.oecd.org/comnet/agr/farmind.nsf/viewHtml/index/$FILE/Anderson_et_al.PDF> (1st of February 2006).] presented at the OECD expert meeting on farm management indicators in New Zealand in March 2004, a set of farm management indicators was presented in the framework of a typology of grazing livestock farming systems in the EU-15 (includes all Member States of the European Union before 2004). The present paper presents new results on farm management indicators within the framework of an extended typology for all farming sectors. It presents an environmentally oriented extension to the EU typology of farms currently used for assessing the situation of farming within the European Union. The extended typology is tested in relation to emerging policy issues such as environmental sustainability and rural viability by analysing some of the farm management indicators suggested in Andersen et al., [(2004a). Farming and the Environment in the European Community--using agricultural statistics to provide farm management indicators. Paper presented at OECD Expert meeting, March 2004, New Zealand. (1st of February 2006).]. Finally, recommendations in relation to the next generation EU farm typology are given.  相似文献   

12.
How does knowledge management (KM) by a government agency responsible for environmental impact assessment (EIA) potentially contribute to better environmental assessment and management practice? Staff members at government agencies in charge of the EIA process are knowledge workers who perform judgement-oriented tasks highly reliant on individual expertise, but also grounded on the agency’s knowledge accumulated over the years. Part of an agency’s knowledge can be codified and stored in an organizational memory, but is subject to decay or loss if not properly managed. The EIA agency operating in Western Australia was used as a case study. Its KM initiatives were reviewed, knowledge repositories were identified and staff surveyed to gauge the utilisation and effectiveness of such repositories in enabling them to perform EIA tasks.  相似文献   

13.
Field surveys of biological responses can provide valuable information about environmental status and anthropogenic stress. However, it is quite usual for biological variables to differ between sites or change between two periods of time also in the absence of an impact. This means that there is an obvious risk that natural variation will be interpreted as environmental impact, or that relevant effects will be missed due to insufficient statistical power. Furthermore, statistical methods tend to focus on the risks for Type-I error, i.e. false positives. For environmental management, the risk for false negatives is (at least) equally important. The aim of the present study was to investigate how the probabilities for false positives and negatives are affected by experimental set up (number of reference sites and samples per site), decision criteria (statistical method and α-level) and effect size. A model was constructed to simulate data from multiple reference sites, a negative control and a positive control. The negative control was taken from the same distribution as the reference sites and the positive control was just outside the normal range. Using the model, the probabilities to get false positives and false negatives were calculated when a conventional statistical test, based on a null hypothesis of no difference, was used along with alternative tests that were based on the normal range of natural variation. Here, it is tested if an investigated site is significantly inside (equivalence test) and significantly outside (interval test) the normal range. Furthermore, it was tested how the risks for false positives and false negatives are affected by changes in α-level and effect size. The results of the present study show that the strategy that best balances the risks between false positives and false negatives is to use the equivalence test. Besides tests with tabulated p-values, estimates generated using a bootstrap routine were included in the present study. The simulations showed that the probability for management errors was smaller for the bootstrap compared to the traditional test and the interval test.  相似文献   

14.
Landscape evaluation: comparison of evaluation methods in a region of Spain   总被引:1,自引:0,他引:1  
Landscape evaluation is now widely recognised as a powerful, interdisciplinary, environmental research method. The aim of the present work was to compare two landscape evaluation methods as part of a physical planning process: the cartographic assessment method and the in situ assessment method. This comparison was performed using an area of the Montes de Toledo, in the centre of Spain. Both methods provided similar results for the majority of the landscape units studied. This shows that the cartographic method can be successfully used in landscape evaluation, allowing important savings in terms of fieldwork. However, this is only the case when the information provided by the available maps is sufficiently accurate to allow the correct assignment of coefficients by a panel of experts.  相似文献   

15.
The current Mexican environmental law provides the legal basis for comprehensive land-use planning. Under the law, development of natural ecosystems must combine goals, policies, and practices towards the sustainable use of natural resources and the protection of biological diversity. Thus, ecosystem manipulation must be able to counter fragmentation of natural ecosystems and isolation of natural reserves, while providing for human needs. Assessment of the potential of natural ecosystems and management impacts are required. Multiple-resource simulation is an assessment and land-use planning tool that permits managers and decision makers to comply with the law, providing a flexible, user-oriented system that can meet the needs of managers, conservationists, and researchers. A multiple-resource model and an example of how it can be applied to meet planning needs is presented for discussion.  相似文献   

16.
Two years of experience with EIA in Flanders (northern Belgium) was evaluated in order to gain perspective on the effectiveness of the administrative procedure. The four essential characteristics of the EIA procedure that were evaluated are: completeness, open and public character, objectivity, and verifiability. Representatives of all parties involved in the EIA procedure were interviewed. The result of the evaluation is a list of major problems with EIA. Recommendations for a more efficient procedure are suggested at a time when a proposal for a new, comprehensive, and permanent EIA decree is being discussed. The evaluation of the administrative procedure for EIA in Flanders shows that several vital characteristics of the EIA procedure are lacking. This reduces the obligatory and open nature of the process, resulting in insufficient guarantees that the environment receives the altention it deserves during the decision-making process.  相似文献   

17.
Since environmental impact assessment (EIA) is concerned primarily withsignificant environmental impacts, the concept of impact significance deserves to be defined and applied rigorously. In this article use of the term over the past 15 years in EIA documentation is reviewed. Some recent attempts at elucidating the concept are summarized. Four perspectives on impact significance that emerged from a series of workshops on the ecological basis for EIA are presented. These perspectives include (a) statistical (related to problems of isolating project-induced changes from natural variation), (b) ecological (related to the importance of project-induced changes from a purely ecological perspective), (c) social (related to the acceptability of project-induced changes in important environmental attributes), and (d) project (related to whether project-induced changes will indeed influence project decision making). The following synthesis is proposed: Any exercise in judging the significance of an environmental impact should thoroughly consider (a) the importance of the environmental attribute in question to project decision makers, (2) the distribution of change in time and space, (c) the magnitude of change, and (d) the reliability with which change has been predicted or measured. The implications of considering these factors are discussed.  相似文献   

18.
Urban water infrastructure expenditures cause a major financial burden to municipalities. In the opinion of many policy-makers, public funds may alleviate this burden and facilitate environmental policies. However, practice has shown that despite ambitious policies, funding often follows traditional cost-dominated thinking. In Austria, national policy-makers were interested in new guidelines for funding that increase the transparency of the planning, ensure the adequate treatment of ecological problems, and foster stakeholder involvement, but keep the process as simple as possible, and require minimal changes of the current guidelines. An interdisciplinary project team conducted such a study. Its outcome was tested in two pilot projects. Based on these experiences, policy-makers finally implemented the recommended guidelines for the funding of communal urban water infrastructure projects. A general observation about the policy-making process was a conservative attitude of policy-makers. They prefer simple constraints (precautionary principle) and flexible negotiations (delegation) to complex assessment and decision-aid methodologies.  相似文献   

19.
/ This paper presents a foundation for improving the risk assessmentprocess for freshwater wetlands. Integrating wetland science, i.e., use of anecosystem-based approach, is the key concept. Each biotic and abiotic wetlandcomponent should be identified and its contribution to ecosystem functionsand societal values determined when deciding whether a stressor poses anunreasonable risk to the sustainability of a particular wetland.Understanding the major external and internal factors that regulate theoperational conditions of wetlands is critical to risk characterization.Determining the linkages between these factors, and how they influence theway stressors affect wetlands, is the basis for an ecosystem approach.Adequate consideration of wetland ecology, hydrology, geomorphology, andsoils can greatly reduce the level of uncertainty associated with riskassessment and lead to more effective risk management. In order to formulateeffective solutions, wetland problems must be considered at watershed,landscape, and ecosystem scales. Application of an ecosystem approach can begreatly facilitated if wetland scientists and risk assessors work together todevelop a common understanding of the principles of both disciplines.KEY WORDS: Ecological risk assessment; Freshwater wetlands;Environmental pollution; Chemical stressors; Physical stressors; Biologicalstressors  相似文献   

20.
Stakeholder engagement (SE), particularly with representatives of locally affected communities, is integral to Environmental Impact Assessment (EIA) processes, so critical evaluation of SE is necessary across a range of different socio-political contexts. EIA SE practice in the Sultanate of Oman is examined using Q-Methodology, a qualitative-quantitative discourse analysis technique, in order to evaluate key-actor perspectives and policy directions. Four discourses emerge, pertaining to (1) the institutionalisation of SE; (2) business as usual; (3) rights-centred engagement; and (4) decentralisation of EIA institutions. Consensus emerges that shows support for transparency and formalisation of SE; greater citizen-centred decision-making power; transparency in government guidelines; and the elimination of developer-led consultation processes. Policy options for reforming EIA policy are discussed, including a code of participation practice and a toolkit of suitable engagement methods.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号