首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
ABSTRACT. There have been many changes in the waste water treatment requirements at St. Louis District Corps of Engineers projects over the past few years. Discussed are the methods considered for treating these wastes. Extended aeration plant, followed by filtration, is the process used in most of the areas. The treatment plant operators have become key members of the project operation team. A discussion of the Districts operator training program is presented along with the operator's job requirements. Through a Spring inspection of all treatment plants in the District, a mechanism has been provided for encouraging feedback to the design engineer from the operator.  相似文献   

2.
ABSTRACT: A model consisting of closed water reuse and productive use of various types of wastes for energy generation is presented. The sewage after treatment would be used as the cooling water for power plants, and the condenser discharge therefrom be used as heating water for sludge digesters. The water is then purified for municipal water supply for continuous use. The advantages of this system are that water resources and energy are conserved while various types of wastes including waste heat are controlled. With a preliminary system analysis, it appears that the design for power plant based on the total heating value of wastes and digester capacity based on sewage sludge generation is feasible in terms of acquisition and full utilization of various types of wastes as generated in a single metropolitan area. The system as shown in this design is in balance among various factors such as the generation rate of municipal refuse, municipal sewage, waste heat in the condenser discharge, and raw sewage sludge.  相似文献   

3.
ABSTRACT: A dynamic programming procedure for the planning and operation of a wastewater treatment plant over a long period of time is presented. In order to meet increased demands for wastewater treatment in the future, the expansion of existing plants must be considered. Dynamic programming is employed to determine the optimal schedule of expansion at each plant, simultaneously determining an optimal operating policy (treatment level). The optimal schedule of expansion at each plant depends on the following: (1) the shape of the projected wastewater demand function; (2) the interest rate used; (3) the locations and capacities of the facilities available; and (4) the rates of increase of the costs of construction, labor, chemicals, and electric power. An example illustrating the use of the procedure is presented.  相似文献   

4.
ABSTRACT: An application of the receiving water block of the EPA Storm Water management Model (SWMM) is presented to quantify water quality impacts and evaluated control alternatives for a 208 areawide waste water management plan in Volusia Country, Florida. The water quality impact analyses were conducted for dry-and wet-weather conditions to simulate dissolved oxygen (DO), chlorides, total nitrogen (TN), and total phosphorus (TP) in the Halifax Rivers, Florida, a 40-kilometer-long tidal estuary located on the Atlantic coast of Florida near Daytona Beach. Dry-weather analysis was performed using conventional 7-day, 10-year low flow conditions to determine a set of unit transfer coefficients which estimate the pollutant concentration transferred to any point in the estuary from a constant unit discharge of pollutants at the existing waste water treatment plant outfall locations. Wet-weather analysis was performed by continuous simulation of a typical three-month summer wet season in Florida. Three-month cumulative duration curves of DO, TN and TP concentrations were constructed to estimate the relative value of controlling urban runoff of waste water treatment plant effluent on the Halifax River. The three-month continuous simulation indicated that the greatest change in DO, TN, and TP duration curves is possible by abatement of waste water treatment plant pollution.  相似文献   

5.
Bioenergy production from biomass is proposed as a method to solve part of the nation's energy problem. However, biomass and bioenergy production is questioned as an environment-friendly approach due to the potential increase of water pollution and the potential decrease of available water resource. A conceptual model of an integrated natural waste treatment system that produces biogas and biomass for bioenergy, treat waste and wastewater, conserve fresh water, and decrease the potential water pollution is presented. The potential biomass production from water hyacinth, duckweed, cattail, and knotgrass was investigated using recycling wastewater from an integrated natural waste treatment system from 2005 to 2008. Although the biomass production from recycling wastewater was not controlled for maximum production, this research identified the large potential impact that could be made if these systems were implemented. The overall average water hyacinth growth rate was high to 0.297 kg wet wt./m2/day during a research period of over 500 days, including both the active and non-active growing seasons. The average daily growth rates of duckweed, cattail, and knotgrass were 0.099-0.127, 0.015, and 0.018 kg wet wt./m2, respectively. This research illustrated that water hyacinth was a more promising aquatic plant biomass for bioenergy production when wastewater effluent was recycled as water and nutrient sources from an integrated natural waste treatment system.  相似文献   

6.
Environmental management of the stone cutting industry   总被引:1,自引:0,他引:1  
Environmental Management of the stone cutting industry in Hebron is required to reduce the industry's adverse impact on the downstream agricultural land and the adverse impact on the drinking water aquifers. This situation requires the implementation of an industrial wastewater management strategic approach and technology, within the available technical and financial resources. Ten pilot projects at different locations were built at Hebron to reduce or eliminate the incompatible discharge of the liquid and solid waste to the environment and improve the stone cutting industry's effluent quality. A review of existing practices and jar test experiments were used to optimize the water recycling and treatment facilities. The factors reviewed included influent pumping rates and cycles, selection of the optimal coagulant type and addition methods, control of the sludge recycling process, control over flow rates, control locations of influent and effluent, and sludge depth. Based on the optimized doses and Turbidity results, it was determined that the use of Fokland polymer with an optimal dose of 1.5mg/L could achieve the target turbidity levels. The completion of the pilot projects resulted in the elimination of stone cutting waste discharges and an improvement in the recycled effluent quality of 44-99%. This in turn reduced the long term operating costs for each participating firm. A full-scale project that includes all the stone cutting firms in Hebron industrial area is required.  相似文献   

7.
秦皇岛市农村饮水安全状况调查结果显示,90%受访户采用家庭分散式浅井取水、100%的用户取水后以漂白粉消毒,但消毒剂的投加不规范。当地政府从未组织对水质进行安全检测,农村缺少污水处理和垃圾处理设施,缺少健全的供水管理制度并且饮水安全意识薄弱。可以从加大水利资金投入推进集约化供水、引进权责明晰的多元化管理制度、建立水源地保护和水质监测的长效机制、推进农村污染综合整治等方面解决农村饮水安全问题。加强饮水安全后续管理,推进社会主义新农村建设。  相似文献   

8.
ABSTRACT Mathematical models are formulated for selection of water resources projects to meet the future additional water requirements of a given region at the minimum present worth cost. The projects available are surface water reservoirs and desalination plants. The modles are used for selecting both the development sequence of projects and their optimum sizes. Decisions with regard to planning time horizon and discount rates are made outside of the mathematical model. The algorithm used for solving these models is an integer programming routine using the implicit enumeration technique. Some computational results are presented for a hypothetical case.  相似文献   

9.
针对急需解决的钻井废水、废气治理问题,以钻井作业大功率柴油机废气余热回收利用为出发点,研制了钻井废水废气综合治理设备。通过现场试验对钻井废水、废气治理效果及噪声影响的分析,试验结果表明,日处理钻井废水可达11~13m3/d,柴油机废气中污染物排放有一定程度的降低,柴油机高频噪声得到较明显降低,并有利于增加柴油机扭距。  相似文献   

10.
This paper describes the conceptual design of a production process in which waste cooking oil is converted via supercritical transesterification with methanol to methyl esters (biodiesel).Since waste cooking oil contains water and free fatty acids, supercritical transesterification offers great advantage to eliminate the pre-treatment capital and operating cost.A supercritical transesterification process for biodiesel continuous production from waste cooking oil has been studied for three plant capacities (125,000; 80,000 and 8000 tonnes biodiesel/year). It can be concluded that biodiesel by supercritical transesterification can be scaled up resulting high purity of methyl esters (99.8%) and almost pure glycerol (96.4%) attained as by-product.The economic assessment of the biodiesel plant shows that biodiesel can be sold at US$ 0.17/l (125,000 tonnes/year), US$ 0.24/l (80,000 tonnes/year) and US$ 0.52/l for the smallest capacity (8000 tonnes/year).The sensitive key factors for the economic feasibility of the plant are: raw material price, plant capacity, glycerol price and capital cost.Overall conclusion is that the process can compete with the existing alkali and acid catalyzed processes.Especially for the conversion of waste cooking oil to biodiesel, the supercritical process is an interesting technical and economical alternative.  相似文献   

11.
As Green Corporate Social Responsibility spreads across the globe, the construction industry is under pressure to reduce the carbon emissions across their building projects. Between maximum profit and environment management, mathematical programming can be used as a decision support tool concerning the optimal green building projects portfolio. This environment strategic decision problem is addressed in this study where an activity-based costing decision model incorporating carbon tax costs and construction resources constraints is developed from the perspectives of capacity expansion and green technology outsourcing. The results illustrate the positive contribution of the mathematical programming approach to achieve viable green building projects portfolio solutions. Sensitivity analyses are carried out to analyse the impact of carbon footprint emission variation on maximum profit, and the corresponding results are discussed.  相似文献   

12.
ABSTRACT: The indexed sequential hydrologic modeling (ISM) methodology is utilized by the Western Area Power Administration as the basis for risk-based estimation of project-dependable hydropower capacity for several federally owned/operated projects. ISM is a technique based on synthetic generation of a series of overlapping short-term inflow sequences obtained directly from the historical record. The validity of ISM is assessed through application to the complex multireservoir hydropower system of the Colorado River basin for providing risk estimates associated with determination of reliable hydrogeneration capacity. Performance of ISM is compared with results from stochastically generated streamflow input data to the Colorado River Simulation System (CRSS). Statistical analysis and comparison of results are based on monthly power capacity, energy generation, and downstream water deliveries. Results indicate that outputs generated from ISM synthetically generated sequences display an acceptable correspondence with those obtained from stochastically generated hydrologic data for the Colorado River Basin.  相似文献   

13.
The environmental pollution problems prevalent in gulf coast estuaries are a cause of great concern to those in water quality management. This paper outlines the dominant characteristics which affect the properties of these estuaries including geography, tide and current effects, wind effects, salinity and density regime, nature and level of waste discharge, low inflow levels, dredging effects and present quality levels. Two basic levels of analytical modeling which are useful in water quality management are presented. The first is a relatively crude completely mixed estuarine model which permits economical evaluation of varying parameters. The second is a very general steady state model which permits analysis of stratified systems. The ESTPOL computer language designed to simplify the use of the steady state model is described. The practical use of the analytical models as management tools for the solution of Texas Estuarine quality problems is demonstrated.  相似文献   

14.
LARGE AREA HYDROLOGIC MODELING AND ASSESSMENT PART I: MODEL DEVELOPMENT1   总被引:4,自引:0,他引:4  
ABSTRACT: A conceptual, continuous time model called SWAT (Soil and Water Assessment Tool) was developed to assist water resource managers in assessing the impact of management on water supplies and nonpoint source pollution in watersheds and large river basins. The model is currently being utilized in several large area projects by EPA, NOAA, NRCS and others to estimate the off-site impacts of climate and management on water use, non-point source loadings, and pesticide contamination. Model development, operation, limitations, and assumptions are discussed and components of the model are described. In Part II, a GIS input/output interface is presented along with model validation on three basins within the Upper Trinity basin in Texas.  相似文献   

15.
ABSTRACT .Desalting plants can provide a means of firming up erratic natural supplies when properly operated in conjunction with existing water supply reservoir systems. Since the natural inflow is variable, the choice of when to run the desalting plant is difficult. If the plant is turned on too late, a shortage may result; or if the plant runs too long, costly water may be wasted. A computer program is described that can help water planners find an optimal operating rule, i.e., a policy that tells when to turn the plant on and off to meet a given demand. Criteria for defining the firm water yield of the system (with and without desalting) are first defined. The logic of the program is then described. The program, written in FORTRAN IV, successively simulates operation of the given size reservoir-desalting plant system under control of various operating rules and selects the optimal rule as the one which produces the required firm water yield at the least unit cost. The optimal plant size and the staging of construction can also be studied by making a series of computations. Applications of the Operating Rule Program to water systems in California, Utah and New York are described. The studies show that, compared with base load operation, substantial savings are possible if optimum intermittent conjunctive operation of the desalting plant is followed.  相似文献   

16.
Leachates are generated as a result of water or other liquid passing through waste at a landfill site. These contaminated liquids originate from a number of sources, including the water produced during the decomposition of the waste as well as rain-fall which penetrates the waste and dissolves the material with which it comes into contact. The penetration of the rain-water depends on the nature of the landfill (e.g. surface characteristics, type and quantity of vegetation, gradient of layers, etc). The uncontrolled infiltration of leachate into the vadose (unsaturated) zone and finally into the saturated zone (groundwater) is considered to be the most serious environmental impact of a landfill. In the present paper the water flow and the pollutant transport characteristics of the Ano Liosia Landfill site in Athens (Greece) were simulated by creating a model of groundwater flows and contaminant transport. A methodology for the model is presented. The model was then integrated into the Ecosim system which is a prototype funded by the EU, (Directorate General XIII: Telematics and Environment). This is an integrated environmental monitoring and modeling system, which supports the management of environmental planning in urban areas.  相似文献   

17.
Abstract: New criteria, pollutant load of unit area (PLUA), are developed for sustainable water quality management, which not only avoids degrading water quality but also considers the equity of development between different generations. A simulation‐optimization model is established to determine PLUA, in which uses the QUAL2E model to simulate pollutant transport and formulates a linear programming model to optimize the objective of maximal loads (carrying capacity). Two watersheds, the Touchen creek and the Keya creek, both in Taiwan, are taken as case studies. The PLUA criterion is applied to several existing projects which have passed environmental impact assessment (EIA). The results show that if the Hsinchu Science‐Based Industrial Park discharges wastewater to the Touchen creek, the total pollutant discharge of 85.6 kg/day exceeds the allocated load. Consequently, a waste reduction of at least 23.4% is required. Although these existing projects have passed EIA, most of them violate the criterion of PLUA and thus contribute to continued degradation of water quality. This study suggests developing PLUA as a part of the process of strategic environmental assessment (SEA) for watershed management plans and then applying it to EIA as a criterion for new project assessment. Furthermore, if carrying capacities of all pollutant discharges and resource uses can be translated into loads per unit of area, an integrated sustainable watershed management plan can be developed.  相似文献   

18.
根据氧化铝行业生产用水及排污特点,结合某氧化铝生产企业生产废水的处理实践,推荐采用逆向洗涤赤泥和氢氧化铝,节约用水量;综合利用赤泥洗液和含碱废水;对生产用水设置循环水系统和二次利用水系统;设置生产废水处理站,氧化铝系统和热电厂的生产系统排水、循环水系统的排污水,以及化验等废水全部排入生产废水处理站处理,废水经处理后作为二次利用供水返回生产系统使用,通过综合利用生产废水,可以实现厂区废水的零排放,节约资源的同时,提高清洁生产水平,避免对环境造成污染。  相似文献   

19.
With the drastic decrease in fossil resources and rapid deterioration of the global environment, the utilization of geothermal resources has been strongly advocated. The combination of heat, power, and cold utility generation is commonly used to increase the utilization efficiency of geothermal resources. In this study, an integrated cascade utilization system of waste geothermal water (ICUWGW) from a flash geothermal power plant in China is established to increase the utilization efficiency of geothermal water. The waste geothermal water leaving the power plant is proposed for further use in cascade for two-stage LiBr/H2O absorption cooling, agricultural product drying, and residential bathing. Twelve candidate temperature schemes showing different inlet and outlet temperatures of every subsystem are proposed for the ICUWGW. Several criteria are selected for the evaluation and screening of the candidate schemes. Grey relational analysis incorporating analytic hierarchy process is conducted to screen the optimal temperature scheme for the ICUWGW to meet the comprehensive criteria of thermodynamics and economics. Results show that the optimal scheme features significant improvement in energy efficiency, exergy efficiency, and equivalent electricity generation efficiency compared with those of the current geothermal power plant. The investment payback time of the additional subsystems for cooling, drying, and bathing is 1.85 years. Exergy analysis is also conducted to determine the further optimization potential of the optimal ICUWGW. Sensitivity analysis of electricity price on the performance of the optimal ICUWGW is also performed.  相似文献   

20.
区域环评中北方河流水环境容量计算方法研究   总被引:1,自引:0,他引:1  
考虑北方河流枯水期流量较小,污水处理厂排水形成的流量不可忽略的实际情况,对全国地表水环境容量基于环境容量定义及基于一维模型的水环境容量计算公式进行修正;实例计算结果表明:用该方法计算的环境容量与污染物预测结果具有非常好的拟合性。文中水环境容量计算公式中相关参数的选取原则及修正公式,可为北方区域开发项目水环境剩余容量的计算提供借鉴。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号