首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 156 毫秒
1.
Electrical resistance heating (ERH) has become a common method of remediation for volatile organic compounds (VOCs) in unconsolidated soils, both above and below the water table. Recently, use of ERH has expanded to include treatment of contaminated sedimentary bedrock. This article describes the implementation issues for rock remediation and provides case studies of three sites remediated by ERH in Maryland, New Jersey, and Indiana. With proper design, remediation of bedrock can be as effectively completed as remediation of overburden materials. © 2010 Wiley Periodicals, Inc.  相似文献   

2.
Electrical resistance heating (ERH) is proving to be an effective technology to rapidly heat the subsurface and, in doing so, removing volatile organic compounds. Practitioners of this technology have observed that other processes (biodegradation, abiotic degradation, hydrolysis, and possibly others) occur to break down the chemicals of concern, and remediation is not solely accomplished through vaporization. Few sites treated using ERH have been monitored during and after treatment to identify and evaluate the processes occurring and assess the contribution of these other biological and chemical processes in the remediation effort so that they may be incorporated in the remediation design. At Fort Lewis, Washington, a landfill has been undergoing ERH treatment in three phases, where chlorinated volatile organic compounds represent the primary chemicals of concern in soil and groundwater. Other chemicals of concern include petroleum products, oils, and lubricants. The Fort Lewis remediation projects provided an opportunity to observe the reactions occurring in the subsurface during ERH and fine‐tune the study with each phase of operation. This study is still under way. However, the data gathered to date, which focuses on biodegradation, provides insights into the processes that have been observed. For the Fort Lewis site, biotic and abiotic degradation processes have been observed throughout the range of operating temperatures. At the lower temperature ranges (up to 70°C), biological processes appear to predominate. Above 70°C, abiotic processes become much more active. The goal of this work is to eventually optimize the use of these intrinsic processes in ERH remediation to reduce energy requirements and costs. © 2007 Wiley Periodicals, Inc.  相似文献   

3.
Recent regulatory changes need more challenging treatment goals for 1,4‐dioxane. However, significant treatment limitations exist in part due to the high solubility and low Henry's law constant of 1,4‐dioxane. Two case studies are reported with substantial 1,4‐dioxane concentration reductions through in situ thermal remediation via electrical resistance heating (ERH). Concentration reductions greater than 99.8 percent of 1,4‐dioxane have been observed in the field using ERH. Concentrations of 1,4‐dioxane in air and steam extracted by an ERH vapor recovery system have also been evaluated. Laboratory studies were conducted to further understand the mechanisms that enable ERH remediation of 1,4‐dioxane. Vapor liquid equilibrium studies in water and soil were conducted and utilized to develop an ERH treatment cost model for 1,4‐dioxane. Existing field data were correlated to the 1,4‐dioxane treatment cost model. Field observations and laboratory testing indicate steam stripping that occurs through ERH remediation is an effective treatment method for 1,4‐dioxane. ©2015 Wiley Periodicals, Inc.  相似文献   

4.
A field demonstration of an enhanced in-situ bioremediation technology was conducted between March 1998 and August 1999 at the ITT Industries Night Vision (ITTNV) Division plant in Roanoke, Virginia. The bioremediation process was evaluated for its effectiveness in treating both chlorinated and nonchlorinated volatile organic compounds (VOCs) in groundwater located in fractured bedrock. Chlorinated compounds, such as trichloroethene (TCE), in fractured bedrock pose a challenging remediation problem. Not only are chlorinated compounds resistant to normal biological degradation, but the fractured bedrock presents difficulties to traditional techniques used for recovery of contaminants and for delivery of amendments or reagents for in-situ remediation. The demonstration was conducted under the U.S. Environmental Protection Agency's Superfund Innovative Technology Evaluation (SITE) program. The SITE program was established to promote the development, demonstration, and use of innovative treatment technologies for the cleanup of Superfund and other hazardous waste sites. This article presents selected results of the demonstration and focuses on understanding the data in light of the fractured bedrock formation. © 2002 Wiley Periodicals, Inc.  相似文献   

5.
Electrical resistance heating (ERH) is an in situ treatment for soil and groundwater remediation that can reduce the time to clean up volatile organic compounds (VOCs) from years to months. The technology is now mature enough to provide site owners with both performance and financial certainty in their site‐closure process. The ability of the technology to remediate soil and groundwater impacted by chlorinated solvents and petroleum hydrocarbons regardless of lithology proves to be beneficial over conventional in situ technologies that are dependent on advective flow. These conventional technologies include: soil vapor recovery, air sparging, and pumpand‐treat, or the delivery of fluids to the subsurface such as chemical oxidization and bioremediation. The technology is very tolerant of subsurface heterogeneities and actually performs as well in low‐permeability silts and clay as in higher‐ permeability sands and gravels. ERH is often implemented around and under buildings and public access areas without upsetting normal business operations. ERH may also be combined with other treatment technologies to optimize and enhance their performance. This article describes how the technology was developed, how it works, and provides two case studies where ERH was used to remediate complex lithologies. © 2005 Wiley Periodicals, Inc.  相似文献   

6.
In response to an oxygenated gasoline release at a gas station site in New Hampshire, a temporary treatment system consisting of a single bedrock extraction well, a product recovery pump, an air stripper, and carbon polishing units was installed. However, this system was ineffective at removing tertiary butyl alcohol from groundwater. The subsequent remedial system design featured multiple bedrock extraction wells and an ex situ treatment system that included an air stripper, a fluidized bed bioreactor, and carbon polishing units. Treated effluent was initially discharged to surface water. Periodic evaluation of the remediation system performance led to system modifications, which included installing an additional extraction well to draw contaminated groundwater away from an on‐site water supply well, adding an iron and manganese pretreatment system, and discharge of treated effluent to an on‐site drywell. Later, the air stripper and carbon units were eliminated, and an infiltration gallery was installed to receive treated, oxygenated effluent in order to promote flushing of the smear zone and in situ bioremediation in the source area. This article discusses the design, operation, performance, and modifications to the remediation system over time, and provides recommendations for similar sites. © 2007 Wiley Periodicals, Inc.  相似文献   

7.
With the successful implementation of in situ chemical oxidation (ISCO) programs to remediate contaminated soil and groundwater aquifers worldwide, ISCO has become established as a traditional remediation technique. On the basis of historical success, expanded ISCO practices are now routinely applied to increasingly difficult geologic environments, including formerly problem locations such as those containing nonaqueous‐phase liquid, fractured bedrock, low‐conductivity media, and highly layered and/or heterogeneous aquifers. Effective delivery of amendment, however, remains the single most important aspect of successful remediation, particularly given the range of potentially applicable delivery methods and site complexities. Selecting the most appropriate technique for any specific site depends upon a clear understanding of the variety of site constraints, including factors such as site conditions, underlying geology, contaminant distribution, technology limitations, and other project‐specific factors. Because the injection program is often the largest cost associated with implementation of an ISCO project, it is critical to develop a cost‐effective injection method for each site. Constant head injection provides a cost‐effective alternative for sites with low‐conductivity lithology(ies). Constant head injection employs a continuous low‐pressure application method to deliver ISCO agents over a long period of time. This synergistic method complements the existing site conditions and heterogeneity, working with the natural conditions, rather than trying to overcome or destroy the site geology using highly aggressive delivery techniques. © 2014 Wiley Periodicals, Inc.  相似文献   

8.
Established groundwater contaminants such as chlorinated solvents and hydrocarbons have impacted groundwater at hundreds of thousands of sites around the United States and have been responsible for multibillion dollar remediation expenditures. An important question is whether groundwater remediation for the emerging contaminant class comprised of per‐ and polyfluoroalkyl substances (PFAS) will be a smaller, similar, or a larger‐scale problem than the established groundwater contaminants. A two‐pronged approach was used to evaluate this question in this paper. First, nine quantitative scale‐of‐remediation metrics were used to compare PFAS to four established contaminants: chlorinated solvents, benzene, 1,4‐dioxane, and methyl tert‐butyl ether. These metrics reflected the prevalence of the contaminants in the U.S., attenuation potential, remediation difficulty, and research intensity. Second, several key challenges identified with PFAS remediation were evaluated to see similar situations (qualitative analogs) that have been addressed by the remediation field in the past. The results of the analysis show that four out of nine of the evaluated quantitative metrics (production, number of potential sites, detection frequency, required destruction/removal efficiency) indicate that the scale of PFAS groundwater remediation may be smaller compared to the current scale of remediation for conventional groundwater contaminants. One attenuation metric, median plume length, suggests that overall PFAS remediation could pose a greater challenge compared to hydrocarbon sites, but only slightly larger than chlorinated volatile organic compounds sites. The second attenuation metric, hydrophobic sorption, was not definitive regarding the potential scale of PFAS remediation. The final three metrics (regulatory criteria, in‐situ remediation capability, and research intensity) all indicate that PFAS remediation might end up being a larger scale problem than the established contaminants. An assessment of the evolution of groundwater remediation capabilities for established contaminants identified five qualitative analogs for key PFAS groundwater remediation issues: (a) low‐level detection analytical capabilities; (b) methods to assess the risk of complex chemical mixtures; (c) nonaqueous phase dissolution as an analog for partitioning, precursors, and back diffusion at PFAS sites; (d) predictions of long plume lengths for emerging contaminants; and (e) monitored natural attenuation protocols for other non‐degrading groundwater contaminants. Overall the evaluation of these five analogs provided some comfort that, while remediating the potential universe of PFAS sites will be extremely challenging, the groundwater community has relevant past experience that may prove useful. The quantitative metrics and the qualitative analogs suggest a different combination of remediation approaches may be needed to deal with PFAS sites and may include source control, natural attenuation, in‐situ sequestration, containment, and point‐of‐use treatment. However, as with many chlorinated solvent sites, while complete restoration of PFAS sites may be uncommon, it should be possible to prevent excessive exposure of PFAS to human and ecological receptors.  相似文献   

9.
A survey of experts in the application of natural attenuation was conducted to better understand how monitored natural attenuation (MNA) is being applied at chlorinated solvent sites. Thirty‐four remediation professionals provided general information for 191 sites where MNA was evaluated, and site‐specific data for 45 chlorinated solvent plumes being remediated by MNA. Respondents indicated that MNA was precluded as a remedy at only 23 percent of all sites where evaluated as a remedial option. Leading factors excluding MNA as a remedial approach were the presence of an expanding plume and an unreasonably long estimated remediation time frame. MNA is being used as the sole remedy at about 30 percent of the sites, and 33 percent are implementing MNA in conjunction with source zone remediation. The remaining sites are implementing MNA with plume remediation (13 percent), source containment (9 percent), or some other strategy (16 percent). © 2004 Wiley Periodicals, Inc.  相似文献   

10.
After achieving remediation goals during only thirty-two months of operation, the first full-scale in-situ bioremediation (ISB) system in the state of Missouri was shut down in 1990. In addition to ISB, the system included a combination of soil venting and air stripping to remediate subsurface gasoline contamination at a large manufacturing facility. More than 84,000 pounds of gasoline were degraded or removed from the fractured limestone bedrock aquifer and overburden materials. The successful application of ISB in this complex geologic environment and the fact that this was the first such system to complete remediation in Missouri make this system unique.  相似文献   

11.
Remediation of contaminated sites has focused largely on restoration of groundwater aquifers. Often the stated remedial goal is to achieve conditions allowing unrestricted use and unrestricted exposure. Such total groundwater cleanup has occurred at some sites, but is the exception rather than the rule. At the same time, significant effort occurs to perform risk assessments for potential exposure to contaminants in groundwater at sites, both before and after remediation. The logical synergy between risk assessment and remediation is for risk management to seek opportunities for optimal use of groundwater based upon realistic expectations of cleanup technologies and the relevant acceptable residual (postremediation) levels of contaminants. This article explores an approach to improve this synergistic relationship between risk assessment, risk management, and remediation for groundwater cleanups. ©2015 Wiley Periodicals, Inc.  相似文献   

12.
The injection of remediation compounds has rapidly become a widely accepted approach for addressing contaminated sites. One of the most fundamental questions surrounding the use of in situ remediation has been “What compound are you injecting at your site?” With the advances in the industry's understanding and acceptance of the in situ remediation process remediation professionals are now asking a follow‐up question that has become equally important to the success of a project: “How are you injecting a compound at your site?” This article discusses advances in field applications for in situ remediation and injecting remediation compounds. © 2003 Wiley Periodicals, Inc.  相似文献   

13.
This paper proposes the construction of steel pipe sheet pile (SPSP) cutoff walls for promoting remediation of water-soluble toxic substances and containment of water-soluble toxic substances at landfill sites in order to maintain and ensure the environmental safety of waste landfill sites over time. It investigates environmental safety at coastal waste landfill sites by applying water cut-off and remediation promotion techniques to the joint sections of SPSP water cut-off walls that provide shore protection for waste landfills. Results from the research herein show that the construction of SPSP water cut-off walls with features such as the containment of water-soluble toxic substances and remediation promotion is possible by applying water cut-off and remediation techniques to H–H joints, which are structural joint components of SPSP walls. In addition, they show that the performance of remediation in H–H joints can be controlled by adjusting the water cut-off efficiency of the H–H joint flange.  相似文献   

14.
The basis for risk-time curves associated with remediation of hazardous waste sites is developed. The utility of the risk-time curves as a part of a methodology for selecting between alternative remediation schemes is demonstrated when the time-frames for remediation are different for different alternatives. The potential for inclusion of uncertainty aspects in risk-time curves is considered.  相似文献   

15.
Due to the nature of contamination typically found at former MGP (manufactured gas plant) sites, excavation and thermal desorption of MGP wastes has proven to be an effective method for the remediation of MGP‐contaminated soil. The use of on‐site thermal desorption enables MGP sites to be quickly remediated at a low cost. Tar pits, holders, and other underground storage structures typically contain coal tar residuals and waste from former operations, and the areas around these structures are often significantly contaminated. Thus, excavation techniques, odor and vapor management, and material preparation for the treatment method are important factors to consider when developing a site remediation strategy. This article reviews typical excavation and handling methods associated with the remediation of former MGP sites and discusses the treatment of MGP wastes using on‐site thermal desorption technology. © 2001 John Wiley & Sons, Inc.  相似文献   

16.
Dense nonaqueous phase liquids (DNAPLs), in particular chlorinated solvents such as trichloroethene, pose groundwater contamination problems at hazardous waste sites across North America. The mobility of DNAPLs in the subsurface, their low aqueous solubility, and the heterogeneity of typical aquifer systems combine to create conditions that inhibit the rapid remediation of DNAPL sites by traditional pump-and-treat methods. Surfactant-enhanced methods for DNAPL-site remediation accelerate the pace of remediation in granular aquifer systems, e.g., alluvium and outwash. The importance of adequate hydraulic conductivity and aquitard conditions is stressed in the application of surfactant-enhanced aquifer remediation (SEAR).  相似文献   

17.
Today's hazardous waste engineering practice is based on the premise that the current technologies for conducting hazardous waste remediation are sufficient to solve most problems. The premise is false: Except for simple sites, the current practice cannot deliver answers with the required accuracy and precision. This article describes the huge uncertainties present in complex hazardous waste remediation efforts. It also discusses the “observational” method, which originated in the geotechnical engineering field, as a means of coping with these uncertainties during site characterization and remediation. The article includes case-study examples illustrating the use of the observational method at hazardous waste sites.  相似文献   

18.
At many sites, long‐term monitoring (LTM) programs include metals as chemicals of concern, although they may not be site‐related contaminants and their detected concentrations may be natural. At other sites, active remediation of organic contaminants in groundwater results in changes to local geochemical conditions that affect metal concentrations. Metals should be carefully considered at both types of sites, even if they are not primary contaminants of concern. Geochemical evaluation can be performed at LTM sites to determine if the monitored metals reflect naturally high background and, hence, can be removed from the analytical program. Geochemical evaluation can also be performed pre‐ and post‐treatment at active remediation sites to document the effects of organics remediation on metals and identify the processes controlling metal concentrations. Examples from both types of sites are presented in this article. © 2008 Wiley Periodicals, Inc.  相似文献   

19.
Greenhouse gas emissions assessments for site cleanups typically quantify emissions associated with remediation and not those from contaminant biodegradation. Yet, at petroleum spill sites, these emissions can be significant, and some remedial actions can decrease this additional component of the environmental footprint. This article demonstrates an emissions assessment for a hypothetical site, using the following technologies as examples: excavation with disposal to a landfill, light nonaqueous‐phase liquid (LNAPL) recovery with and without recovered product recycling, passive bioventing, and monitored natural attenuation (MNA). While the emissions associated with remediation for LNAPL recovery are greater than the other considered alternatives, this technology is comparable to excavation when a credit associated with product recycling is counted. Passive bioventing, a green remedial alternative, has greater remedial emissions than MNA, but unlike MNA can decrease contaminant‐related emissions by converting subsurface methane to carbon dioxide. For the presented example, passive bioventing has the lowest total emissions of all technologies considered. This illustrates the value in estimating both remediation and contaminant respiration emissions for petroleum spill sites, so that the benefit of green remedial approaches can be quantified at the remedial alternatives selection stage rather than simply as best management practices. ©2015 Wiley Periodicals, Inc.  相似文献   

20.
Since 1994, there has been a significant regulatory shift toward risk-based cleanup standards based on the site-specific risk of the more toxic and mobile compounds; namely, benzene, ethyl benzene, toluene, and xylene (BTEX). This regulatory shift has been accompanied by a growing acceptance of natural attenuation as an important component of petroleum site remediation. This article briefly reviews regulatory progress toward risk-based remediation and describes the successful application of risk-based corrective actions (RBCAs) at two fuel contaminated sites on Air Force installations. By developing site-specific cleanup goals, and combining natural attenuation, source reduction, and land use controls, innovative risk-based closure plans have been implemented on these sites.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号