首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
2.
Declines in salmon stocks and general watershed health in Washington State, USA, have led to an increase in stream restoration and enhancement projects initiated throughout the state. The increasing number of projects has also raised questions regarding the monitoring of these efforts. Project managers receiving hydraulic project approvals (HPAs) were surveyed to determine whether monitoring was taking place on their projects. About half the project managers surveyed reported the collection of baseline data and the use of biological, physical, chemical, or other water quality measures for their projects. Of those who reported collection of monitoring data, only 18% indicated that monitoring was required. Respondents were also asked to rank the importance of various project goals on a Likert scale. Project managers with projects focusing on “engineering” goals (e.g., roadbed stabilization) were less likely than other project managers to collect baseline monitoring data. Project managers with projects focusing on “restoration/ecological” or “fisheries” goals were more likely than other project managers to collect monitoring measures. Although monitoring appears to be taking place in slightly more than half of the projects surveyed, the nature of the data collected varies widely across projects, and in most cases the monitoring effort is voluntary. This suggests that project sponsors, funders, and managers must consider the issues involved in requiring appropriate monitoring, establishing standardized monitoring guidelines, the time frames in which to monitor, providing other incentives for conducting monitoring, and ensuring adequate funding for monitoring efforts.  相似文献   

3.
Stream restoration and enhancement projects: is anyone monitoring?   总被引:3,自引:2,他引:1  
Declines in salmon stocks and general watershed health in Washington State, USA, have led to an increase in stream restoration and enhancement projects initiated throughout the state. The increasing number of projects has also raised questions regarding the monitoring of these efforts. Project managers receiving hydraulic project approvals (HPAs) were surveyed to determine whether monitoring was taking place on their projects. About half the project managers surveyed reported the collection of baseline data and the use of biological, physical, chemical, or other water quality measures for their projects. Of those who reported collection of monitoring data, only 18% indicated that monitoring was required. Respondents were also asked to rank the importance of various project goals on a Likert scale. Project managers with projects focusing on “engineering” goals (e.g., roadbed stabilization) were less likely than other project managers to collect baseline monitoring data. Project managers with projects focusing on “restoration/ecological” or “fisheries” goals were more likely than other project managers to collect monitoring measures. Although monitoring appears to be taking place in slightly more than half of the projects surveyed, the nature of the data collected varies widely across projects, and in most cases the monitoring effort is voluntary. This suggests that project sponsors, funders, and managers must consider the issues involved in requiring appropriate monitoring, establishing standardized monitoring guidelines, the time frames in which to monitor, providing other incentives for conducting monitoring, and ensuring adequate funding for monitoring efforts.  相似文献   

4.
Data from a probability sample were used to estimate wetland and stream mitigation success from 2007 to 2009 across North Carolina (NC). “Success” was defined as whether the mitigation site met regulatory requirements in place at the time of construction. Analytical results were weighted by both component counts and mitigation size. Overall mitigation success (including preservation) was estimated at 74 % (SE = 3 %) for wetlands and 75 % (SE = 4 %) for streams in NC. Compared to the results of previous studies, wetland mitigation success rates had increased since the mid-1990s. Differences between mitigation providers (mitigation banks, NC Ecosystem Enhancement Program’s design-bid-build and full-delivery programs, NC Department of Transportation and private permittee-responsible mitigation) were generally not significant although permittee-responsible mitigation yielded higher success rates in certain circumstances. Both wetland and stream preservation showed high rates of success and the stream enhancement success rate was significantly higher than that of stream restoration. Additional statistically significant differences when mitigation size was considered included: (1) the Piedmont yielded a lower stream mitigation success rate than other areas of the state, and (2) recently constructed wetland mitigation projects demonstrated a lower success rate than those built prior to 2002. Opportunities for improvement exist in the areas of regulatory record-keeping, understanding the relationship between post-construction establishment and long-term ecological trajectories of stream and wetland restoration projects, incorporation of numeric ecological metrics into mitigation monitoring and success criteria, and adaptation of stream mitigation designs to achieve greater success in the Piedmont.  相似文献   

5.
Ecological restoration is increasingly becoming a primary component of broader environmental and water resources management programs throughout the world. The New Zealand Department of Conservation implemented Project River Recovery (PRR) in 1991 to restore unique braided gravel-bed river and wetland habitat in the Upper Waitaki Basin in New Zealand’s high country of the South Island, which has been severely impacted by hydroelectric power development. These braided rivers are highly dynamic, diverse, and globally important ecosystems and provide critical habitat to numerous native wading and shore bird species, including several threatened species such as the black stilt. The objective of this study was to review and summarize PRR after more than 10 years of implementation to provide information and transfer knowledge to other nations and restoration programs. Site visits were conducted, discussions were held with key project staff, and project reports and related literature were reviewed. Primary components of the program include pest plant and animal control, wetland construction and enhancement, a significant research and monitoring component, and public awareness. The study found that PRR is an excellent example of an ecological restoration program focusing on conserving and restoring unique habitat for threatened native bird species, but that also includes several secondary objectives. Transfer of knowledge from PRR could benefit ecological restoration programs in other parts of the world, particularly riverine floodplain and braided river restoration. PRR could achieve even greater success with expanded goals, additional resources, and increased integration of science with management, especially broader consideration of hydrologic and geomorphologic effects and restoration opportunities.  相似文献   

6.
7.
Creating False Images: Stream Restoration in an Urban Setting   总被引:1,自引:0,他引:1  
Stream restoration has become a multibillion dollar business with mixed results as to its efficacy. This case study utilizes pre‐ and post‐monitoring data from restoration projects on an urban stream to assess how well stream conditions, publicly stated project goals, and project implementation align. Our research confirms previous studies showing little communication among academic researchers and restoration practitioners as well as provides further evidence that restoration efforts tend to focus on small‐scale, specific sites without considering broader land use patterns. This study advances our understanding of restoration by documenting that although improving ecological conditions is a stated goal for restoration projects, the implemented measures are not always focused on those issues that are the most ecologically salient. What these projects have accomplished is to protect the built environment and promote positive public perception. We argue that these disconnects among publicized goals for restoration, the implemented features, and actual stream conditions may create a false image of what an ecologically stable stream looks like and therefore perpetuate a false sense of optimism about the feasibility of restoring urban streams.  相似文献   

8.
ABSTRACT: Adaptive management is a heuristic approach to treating stream restoration projects as continuous, cyclic experiments, yielding results to be incorporated into future decisions. This comprehensive assessment views failures as surprises that are valuable lessons. Monitoring, evaluation of data, and communication of results are critical; the monitoring results trigger feedback mechanisms to invoke adaptation to the newly acquired information and communication of new hypotheses, treatments, or policies. The principles of adaptive management were applied to a monitoring study of three urban stream restoration sites in Maryland. Data were collected and evaluated for various restoration techniques, including vanes, cross vanes, step pools, root wads, imbricated riprap walls, and coir fiber rolls. Improvements to the existing Maryland design guidelines and policies were developed as the feedback mechanism. With the increasing application of adaptive management in stream restoration efforts, it is likely that repeated failures will be prevented and future restoration projects will be more successful in achieving their goals.  相似文献   

9.
The restoration of degraded systems is essential for maintaining the provision of valuable ecosystem services, including the maintenance of aesthetic values. However, restoration projects often fail to reach desired goals for a variety of ecologic, financial, and social reasons. Feasibility studies that evaluate whether a restoration effort should even be attempted can enhance restoration success by highlighting potential pitfalls and gaps in knowledge before the design phase of a restoration. Feasibility studies also can bring stakeholders together before a restoration project is designed to discuss potential disagreements. For these reasons, a feasibility study was conducted to evaluate the efficacy of restoring a tidal freshwater marsh in the Potomac River near Alexandria, Virginia. The study focused on science rather than engineering questions, and thus differed in approach from other feasibility studies that are mostly engineering driven. The authors report the framework they used to conduct a feasibility study to inform other potential restoration projects with similar goals. The seven steps of the framework encompass (1) initiation of a feasibility study, (2) compilation of existing data, (3) collection of current site information, (4) examination of case studies, (5) synthesis of information in a handbook, (6) meeting with selected stakeholders, and (7) evaluation of meeting outcomes. By conducting a feasibility study using the seven-step framework, the authors set the stage for conducting future compliance studies and enhancing the chance of a successful restoration.  相似文献   

10.
Hydrologic analysis for coastal wetland restoration   总被引:1,自引:0,他引:1  
Increasing recognition of the value of tidal wetlands has led to interest in how to restore and enhance areas that have been modified by human activity. The policy of recognizing restoration or enhancement as mitigation for destruction of other wetlands is controversial. Once policy questions are separated from technical questions, the steps in a successful project are straightforward A key element in the design of a successful project is quantitative hydraulic and hydrologic analysis of alternatives. Restoration projects at two sites in California used a combination of empirical geomorphic relationships, numerical modeling, and verification with field observations. Experience with these and other wetland restoration projects indicates the importance of longterm postproject monitoring, inspection, and maintenance  相似文献   

11.
Both permit requirements and ecological assessments have been used to evaluate mitigation success. This analysis combines these two approaches to evaluate mitigation required under Section 404 of the United States Clean Water Act (CWA) and Section 10 of the Rivers and Harbors Act, which allow developers to provide compensatory mitigation for unavoidable impacts to wetlands. This study reviewed permit files and conducted field assessments of mitigation sites to evaluate the effectiveness of mitigation required by the US Army Corps of Engineers for all permits issued in Orange County, California from 1979 through 1993. The 535 permit actions approved during this period allowed 157 ha of impacts. Mitigation was required on 70 of these actions, with 152 ha of enhanced, restored, and created habitat required for 136 ha of impacts. In 15 permit actions, no mitigation project was constructed, but in only two cases was the originally permitted project built; the two cases resulted in an unmitigated loss of 1.6 ha. Of the remaining 55 sites, 55% were successful at meeting the permit conditions while 11% failed to do so. Based on a qualitative assessment of habitat quality, only 16% of the sites could be considered successful and 26% were considered failures. Thus, of the 126 ha of habitat lost due to the 55 projects, only 26 ha of mitigation was considered successful. The low success rate was not due to poor enforcement, although nearly half of the projects did not comply with all permit conditions. Mitigation success could best be improved by requiring mitigation plans to have performance standards based on habitat functions.  相似文献   

12.
Evaluating stream restoration projects   总被引:2,自引:3,他引:2  
River and stream restoration projects are increasingly numerous but rarely subjected to systematic postproject evaluation. Without conducting such evaluation and widely disseminating the results, lessons will not be learned from successes and failures, and the field of river restoration cannot advance. Postproject evaluation must be incorporated into the initial design of each project, with the choice of evaluation technique based directly upon the specific project goals against which performance will be evaluated. We emphasize measurement of geomorphic characteristics, as these constitute the physical framework supporting riparian and aquatic ecosystems. Techniques for evaluating other components are briefly discussed, especially as they relate to geomorphic variables. Where possible, geomorphic, hydrologic, and ecological variables should be measured along the same transects. In general, postproject monitoring should continue for at least a decade, with surveys conducted after each flood above a predetermined threshold. Project design should be preceded by a historical study documenting former channel conditions to provide insights into the processes suggest earlier, potentially stable channel configurations as possible design models.  相似文献   

13.
目前国内关于海洋修复工程的考核研究多为修复工程的生态效果考核,极少包含成本效益考核,以致无法比较和分析不同类型、不同规模的海洋修复工程的生态绩效,不利于海洋修复工程的考核和验收管理。根据当前自然资源部实施“蓝色海湾”等整治修复工程的检查验收管理的新需求,本文构建了基于海洋生态系统健康恢复、生态系统服务价值增长和单位成本生态效益等理论的海洋修复工程生态绩效考核指标体系。此外,本文以温州海域2014—2016年海洋修复的生态绩效的考核为例,结合考核结果以及直接相关性、独立性、可测量性和业务化等指标选取原则,对指标体系进行了改进。结果表明本指标体系可以在海洋修复工程的检查验收中被用于生态绩效考核,管理部门可根据海洋修复工程的类型和管理需求,有选择性地采纳部分或全部指标进行考核。  相似文献   

14.
Riverine wetlands, which provide numerous valuable functions, are disappearing in floodplains of a channelized European river. A restoration project has been proposed by scientists to restore a former braided channel of the Rhône River by the removal of fine organic sediments in order to enhance groundwater supply. A precise and intensive prerestoration monitoring program during one year (including comparison with a reference channel) has taken into account several variables and ecological performance indicators measured at various spatial and temporal scales. Three restoration techniques were then suggested, taking into account two characteristics of ecosystem functions for increasing restoration success and self-sustainability: (1) the riparian forest as well as the shores must be preserved or disturbed as little as possible; and (2) the upstream alluvial plug must be preserved to prevent direct supply of nutrientrich water from the Rhône River. Among the three restoration options proposed, it was not possible to carry out the less ecologically disturbing one as it was considered too expensive, time consuming, and difficult to realize. A precise and intensive postrestoration monitoring program, conducted over two years, demonstrated restoration success but also unpredicted problems, such as a locally thick layer of fine organic sediment. As long as a self-sustainable state is not achieved, this monitoring should be continued. Afterwards, a less precise and less intensive long-term monitoring should enable the detection of future events that may influence ecosystem changes.  相似文献   

15.
The goal of restoring ecological integrity in rivers is frequently accompanied by an assumption that a comparative reference reach can be identified to represent minimally impaired conditions. However, in many regulated rivers, no credible historical, morphological or process-based reference reach exists. Resilient restoration designs should instead be framed around naturalization, using multiple analytical references derived from empirically-calibrated field- and model-based techniques to develop an integrated ecological reference condition. This requires baseline data which are rarely collected despite increasing evidence for systematic deficiencies in restoration practice. We illustrate the utility of baseline data collection in restoration planning for the highly fragmented and regulated lower Merced River, California, USA. The restoration design was developed using various baseline data surveys, monitoring, and modeling within an adaptive management framework. Baseline data assisted in transforming conceptual models of ecosystem function into specific restoration challenges, defining analytical references of the expected relationships among ecological parameters required for restoration, and specifying performance criteria for post-project monitoring and evaluation. In this way the study is an example of process-based morphological restoration designed to prompt recovery of ecosystem processes and resilience. For the Merced River, we illustrate that project-specific baseline data collection is a necessary precursor in developing performance-based restoration designs and addressing scale-related uncertainties, such as whether periodic gravel augmentation will sustain bed recovery and whether piecemeal efforts will improve ecological integrity. Given the numerous impediments to full, historical, restoration in many river systems, it seems apparent that projects of naturalization are a critical step in reducing the deleterious impacts of fragmented rivers worldwide.  相似文献   

16.
Biomonitoring programs are widely used in developed countries. They also offer many advantages in assessing ecological consequences of perturbations in developing countries, including reducing the equipment-operation, maintenance, and training costs associated with physicochemical monitoring. Three case histories of river biomonitoring using freshwater organisms (fish, benthic macroinvertebrates, diatoms, zooplankton) are described that involve (1) documentation of environmental effects from long-term, large-scale applications of insecticides to control insect-vectors of river blindness (onchocerciasis) in 11 West African countries; (2) water quality assessments and restoration planning in and around national parks in three East African countries; and (3) evaluation of overall ecological health of the Lower Mekong River in four Southeast Asian countries. As in developed countries, benthic macroinvertebrates are the organisms most widely used in biomonitoring in developing countries. Conflicting opinions of system resilience and whether expected changes are within natural variation may result in differences in underlying hypotheses proposed, study designs implemented, and study execution; each may lead to uncorrectable bias. Direct transfers of approaches used from developed to developing countries are often appropriate; however, techniques dependent on pollution-tolerance values are often region specific and not transferable. Typically expressed concerns about applications of biomonitoring in developing countries include poor coordination among agencies; lack of legislation, identification keys, and trained personnel; and incomplete information on how tropical rivers function. Problems are real but solvable, as evident from accomplishments in several multicountry programs in developing countries. Developed countries requiring coordinated monitoring of international rivers may benefit from examining successful programs under way in developing countries.  相似文献   

17.
Regional-scale restoration is a tool of growing importance in environmental management, and the number, scope, and complexity of restoration programs is increasing. Although the importance of natural science to the success of such projects generally is recognized, the actual use of natural science in these programs rarely has been evaluated. We used techniques of program evaluation to examine the use of natural science in six American and three Western European regional-scale restoration programs. Our results suggest that ensuring the technical rigor and directed application of the science is important to program development and delivery. However, the influence of science may be constrained if strategies for its integration into the broader program are lacking. Consequently, the influence of natural science in restoration programs is greatest when formal mechanisms exist for incorporating science into programs, for example, via a framework for integration of science and policy. Our evaluation proposes a model that can be used to enhance the influence of natural science in regional-scale restoration programs in the United States and elsewhere.  相似文献   

18.
Two decades of uncharacteristically severe wildfires have caused government and private land managers to actively reduce hazardous fuels to lessen wildfire severity in western forests, including riparian areas. Because riparian fuel treatments are a fairly new management strategy, we set out to document their frequency and extent on federal lands in the western U.S. Seventy-four USDA Forest Service Fire Management Officers (FMOs) in 11 states were interviewed to collect information on the number and characteristics of riparian fuel reduction treatments in their management district. Just under half of the FMOs surveyed (43%) indicated that they were conducting fuel reduction treatments in riparian areas. The primary management objective listed for these projects was either fuel reduction (81%) or ecological restoration and habitat improvement (41%), though multiple management goals were common (56%). Most projects were of small extent (93% < 300 acres), occurred in the wildland-urban interface (75%), and were conducted in ways to minimize negative impacts on species and habitats. The results of this survey suggest that managers are proceeding cautiously with treatments. To facilitate project planning and implementation, managers recommended early coordination with resource specialists, such as hydrologists and fish and wildlife biologists. Well-designed monitoring of the consequences of riparian fuel treatments on fuel loads, fire risk, and ecological effects is needed to provide a scientifically-defensible basis for the continued and growing implementation of these treatments.  相似文献   

19.
The ecological integrity of the Wyoming big sagebrush (Artemisia tridentata Nutt. ssp. wyomingensis Beetle and A. Young) alliance is being severely interrupted by post-fire invasion of non-native annual grasses. To curtail this invasion, successful post-fire revegetation of perennial grasses is required. Environmental factors impacting post-fire restoration success vary across space within the Wyoming big sagebrush alliance; however, most restorative management practices are applied uniformly. Our objectives were to define probability of revegetation success over space using relevant soil-related environmental factors, use this information to model cost of successful revegetation and compare the importance of vegetation competition and soil factors to revegetation success. We studied a burned Wyoming big sagebrush landscape in southeast Oregon that was reseeded with perennial grasses. We collected soil and vegetation data at plots spaced at 30?m intervals along a 1.5?km transect in the first two years post-burn. Plots were classified as successful (>5?seedlings/m(2)) or unsuccessful based on density of seeded species. Using logistic regression we found that abundance of competing vegetation correctly predicted revegetation success on 51?% of plots, and soil-related variables correctly predicted revegetation performance on 82.4?% of plots. Revegetation estimates varied from $167.06 to $43,033.94/ha across the 1.5?km transect based on probability of success, but were more homogenous at larger scales. Our experimental protocol provides managers with a technique to identify important environmental drivers of restoration success and this process will be of value for spatially allocating logistical and capital expenditures in a variable restoration environment.  相似文献   

20.
Ecosystems, though impacted by global environmental change, can also contribute to the adaptation and mitigation of such large scale changes. Therefore, sustainable ecosystem management is crucial in reaching a sustainable future for the biosphere. Based on the published literature and publicly accessible data, this paper discussed the status and trends of forest, grassland, and wetland ecosystems in China that play important roles in the ecological integrity and human welfare of the nation. Ecological degradation has been observed in these ecosystems at various levels and geographic locations. Biophysical (e.g., climate change) and socioeconomic factors (e.g., intensive human use) are the main reasons for ecosystem degradation with the latter factors serving as the dominant driving forces. The three broad categories of ecosystems in China have partially recovered from degradation thanks to large scale ecological restoration projects implemented in the last few decades. China, as the largest and most populated developing nation, still faces huge challenges regarding ecosystem management in a changing and globalizing world. To further improve ecosystem management in China, four recommendations were proposed, including: (1) advance ecosystem management towards an application-oriented, multidisciplinary science; (2) establish a well-functioning national ecological monitoring and data sharing mechanism; (3) develop impact and effectiveness assessment approaches for policies, plans, and ecological restoration projects; and (4) promote legal and institutional innovations to balance the intrinsic needs of ecological and socioeconomic systems. Any change in China’s ecosystem management approach towards a more sustainable one will benefit the whole world. Therefore, international collaborations on ecological and environmental issues need to be expanded.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号