共查询到9条相似文献,搜索用时 0 毫秒
1.
Lewis C. Linker Carl F. Cerco 《Journal of the American Water Resources Association》2013,49(5):986-1006
Nutrient load allocations and subsequent reductions in total nitrogen and phosphorus have been applied in the Chesapeake watershed since 1992 to reduce hypoxia and to restore living resources. In 2010, sediment allocations were established to augment nutrient allocations supporting the submerged aquatic vegetation resource. From the initial introduction of nutrient allocations in 1992 to the present, the allocations have become more completely applied to all areas and loads in the watershed and have also become more rigorously assessed and tracked. The latest 2010 application of nutrient and sediment allocations were made as part of the Chesapeake Bay total maximum daily load and covered all six states of the Chesapeake watershed. A quantitative allocation process was developed that applied principles of equity and efficiency in the watershed, while achieving all tidal water quality standards through an assessment of equitable levels of effort in reducing nutrients and sediments. The level of effort was determined through application of two key watershed scenarios: one where no action was taken in nutrient control and one where maximum nutrient control efforts were applied. Once the level of effort was determined for different jurisdictions, the overall load reduction was set watershed‐wide to achieve dissolved oxygen water quality standards. Further adjustments were made to the allocation to achieve the James River chlorophyll‐a standard. 相似文献
2.
Gary W. Shenk Lewis C. Linker 《Journal of the American Water Resources Association》2013,49(5):1042-1056
The Phase 5.3 Watershed Model simulates the Chesapeake watershed land use, river flows, and the associated transport and fate of nutrient and sediment loads to the Chesapeake Bay. The Phase 5.3 Model is the most recent of a series of increasingly refined versions of a model that have been operational for more than two decades. The Phase 5.3 Model, in conjunction with models of the Chesapeake airshed and estuary, provides estimates of management actions needed to protect water quality, achieve Chesapeake water quality standards, and restore living resources. The Phase 5.3 Watershed Model tracks nutrient and sediment load estimates of the entire 166,000 km2 watershed, including loads from all six watershed states. The creation of software systems, input datasets, and calibration methods were important aspects of the model development process. A community model approach was taken with model development and application, and the model was developed by a broad coalition of model practitioners including environmental engineers, scientists, and environmental managers. Among the users of the Phase 5.3 Model are the Chesapeake watershed states and local governments, consultants, river basin commissions, and universities. Development and application of the model are described, as well as key scenarios ranging from high nutrient and sediment load conditions if no management actions were taken in the watershed, to low load estimates of an all‐forested condition. 相似文献
3.
Katherine Walton‐Day Robert L. Runkel Briant A. Kimball 《Journal of the American Water Resources Association》2012,48(5):949-969
Walton‐Day, Katherine, Robert L. Runkel, and Briant A. Kimball, 2012. Using Spatially Detailed Water‐Quality Data and Solute‐Transport Modeling to Support Total Maximum Daily Load Development. Journal of the American Water Resources Association (JAWRA) 48(5): 949‐969. DOI: 10.1111/j.1752‐1688.2012.00662.x Abstract: Spatially detailed mass‐loading studies and solute‐transport modeling using OTIS (One‐dimensional Transport with Inflow and Storage) demonstrate how natural attenuation and loading from distinct and diffuse sources control stream water quality and affect load reductions predicted in total maximum daily loads (TMDLs). Mass‐loading data collected during low‐flow from Cement Creek (a low‐pH, metal‐rich stream because of natural and mining sources, and subject to TMDL requirements) were used to calibrate OTIS and showed spatially variable effects of natural attenuation (instream reactions) and loading from diffuse (groundwater) and distinct sources. OTIS simulations of the possible effects of TMDL‐recommended remediation of mine sites showed less improvement to dissolved zinc load and concentration (14% decrease) than did the TMDL (53‐63% decrease). The TMDL (1) assumed conservative transport, (2) accounted for loads removed by remediation by subtracting them from total load at the stream mouth, and (3) did not include diffuse‐source loads. In OTIS, loads were reduced near their source; the resulting concentration was decreased by natural attenuation and increased by diffuse‐source loads during downstream transport. Thus, by not including natural attenuation and loading from diffuse sources, the TMDL overestimated remediation effects at low flow. Use of the techniques presented herein could improve TMDLs by incorporating these processes during TMDL development. 相似文献
4.
Peter J. Tango Richard A. Batiuk 《Journal of the American Water Resources Association》2013,49(5):1007-1024
Achieving and maintaining the water quality conditions necessary to protect the aquatic living resources of the Chesapeake Bay and its tidal tributaries has required a foundation of quantifiable water quality criteria. Quantitative criteria serve as a critical basis for assessing the attainment of designated uses and measuring progress toward meeting water quality goals of the Chesapeake Bay Program partnership. In 1987, the Chesapeake Bay Program partnership committed to defining the water quality conditions necessary to protect aquatic living resources. Under section 303(c) of the Clean Water Act, States and authorized tribes have the primary responsibility for adopting water quality standards into law or regulation. The Chesapeake Bay Program partnership worked with U.S. Environmental Protection Agency to develop and publish a guidance framework of ambient water quality criteria with designated uses and assessment procedures for dissolved oxygen, water clarity, and chlorophyll a for Chesapeake Bay and its tidal tributaries in 2003. This article reviews the derivation of the water quality criteria, criteria assessment protocols, designated use boundaries, and their refinements published in six addendum documents since 2003 and successfully adopted into each jurisdiction's water quality standards used in developing the Chesapeake Bay Total Maximum Daily Load. 相似文献
5.
Tatiana Borisova Alan Collins Gerard D’Souza Matthew Benson Mary Leigh Wolfe Brian Benham 《Journal of the American Water Resources Association》2008,44(4):1009-1023
Abstract: Total Maximum Daily Load (TMDL) implementation generates benefits and costs from water quality improvements, which are rarely quantified. This analysis examines a TMDL written to address bacteria and aquatic‐life‐use impairments on Abrams and Opequon Creeks in Virginia. Benefits were estimated using a contingent valuation survey of local residents. Costs were based on the number and type of best management practices (BMPs) necessary to achieve TMDL pollution reduction goals. BMPs were quantified using watershed‐scale water quality simulation models (Generalized Watershed Loading Function and Hydrological Simulation Program‐FORTRAN). Based on our projections, the costs to achieve TMDL induced pollution reduction goals outweigh the estimated benefits. Benefit‐cost ratios ranged between 0.1 and 0.3. 相似文献
6.
《Journal of the American Water Resources Association》2007,43(5):1270-1279
Abstract: The steady‐state response matrix has historically proved a valuable tool in computing the water quality response to loadings and in providing insight into the relative impact of individual loading sources. The insight obtained may be is particularly useful in modern applications of increasingly complex water quality models to problems involving multiple point and nonpoint sources, such as in the assessment of total maximum daily loads (TMDLs). Where appropriate and the underlying equations linear, the steady‐state response matrix can be used to synthesize the results of more complicated models and present them in a way easily understood by policy makers. A straightforward method is presented for generating the response matrix using complex models, and example applications discussed. Example applications include a simple demonstration; incorporation of the method into the Mississippi Department of Environmental Quality’s STREAM model used in TMDL development; a TMDL modeling study of the Grand Calumet River and Indiana Harbor Canal, Indiana, using CE‐QUAL‐ICM; and a TMDL modeling study of the Big Sunflower River, Mississippi, using the Water Analysis Simulation Program model. 相似文献
7.
Modeling Summer Month Hydrological Drought Probabilities in the United States Using Antecedent Flow Conditions 下载免费PDF全文
Samuel H. Austin David L. Nelms 《Journal of the American Water Resources Association》2017,53(5):1133-1146
Climate change raises concern that risks of hydrological drought may be increasing. We estimate hydrological drought probabilities for rivers and streams in the United States (U.S.) using maximum likelihood logistic regression (MLLR). Streamflow data from winter months are used to estimate the chance of hydrological drought during summer months. Daily streamflow data collected from 9,144 stream gages from January 1, 1884 through January 9, 2014 provide hydrological drought streamflow probabilities for July, August, and September as functions of streamflows during October, November, December, January, and February, estimating outcomes 5‐11 months ahead of their occurrence. Few drought prediction methods exploit temporal links among streamflows. We find MLLR modeling of drought streamflow probabilities exploits the explanatory power of temporally linked water flows. MLLR models with strong correct classification rates were produced for streams throughout the U.S. One ad hoc test of correct prediction rates of September 2013 hydrological droughts exceeded 90% correct classification. Some of the best‐performing models coincide with areas of high concern including the West, the Midwest, Texas, the Southeast, and the Mid‐Atlantic. Using hydrological drought MLLR probability estimates in a water management context can inform understanding of drought streamflow conditions, provide warning of future drought conditions, and aid water management decision making. 相似文献
8.
A. Michael S. Sheer Michael W. Nemeth Daniel P. Sheer Megan Van Ham Michael Kelly David Hill Samuel D. Lebherz 《Journal of the American Water Resources Association》2013,49(3):654-668
The Bow River Basin is a cornerstone of Alberta's development. In 2010, stakeholders representing interests from agriculture, municipalities, environment, and more formed the Bow River Project Research Consortium to help determine the potential for improving the operations in the basin. At present, upstream reservoirs are operated primarily for hydropower, whereas downstream reservoirs are operated for irrigation. Through Collaborative Modeling for Decision Support the stakeholders were able to develop a new method for operating the system that would dramatically improve environmental performance. The main components of the new operating strategy called for: purchase or setting aside of a small amount of storage volume in the power reservoirs; a set of rules for releases from that storage; an agreement by the major irrigation districts with the largest water licenses to utilize their ability to shift deliveries to and from their large offstream storage reservoirs to allow for increased instream flows, and to allow junior water license holders (mainly municipal and industrial supplies) an uninterrupted water supply; limitations of reservoir fluctuations to improve inreservoir habitat for fisheries; and increased minimum flows throughout the system leading to improved environmental outcomes. Costs of this strategy were minimal, impacts on power revenue were estimated at <US$2 million/yr on average. Compensatory arrangements should be possible. 相似文献
9.
Long‐Term Trends of Nutrients and Sediment from the Nontidal Chesapeake Watershed: An Assessment of Progress by River and Season 下载免费PDF全文
Qian Zhang Damian C. Brady Walter R. Boynton William P. Ball 《Journal of the American Water Resources Association》2015,51(6):1534-1555
To assess historical loads of nitrogen (N), phosphorus (P), and suspended sediment (SS) from the nontidal Chesapeake Bay watershed (NTCBW), we analyzed decadal seasonal trends of flow‐normalized loads at the fall‐line of nine major rivers that account for >90% of NTCBW flow. Evaluations of loads by season revealed N, P, and SS load magnitudes have been highest in January‐March and lowest in July‐September, but the temporal trends have followed similar decadal‐scale patterns in all seasons, with notable exceptions. Generally, total N (TN) load has dropped since the late 1980s, but particulate nutrients and SS have risen since the mid‐1990s. The majority of these rises were from Susquehanna River and relate to diminished net trapping at the Conowingo Reservoir. Substantial rises in SS were also observed, however, in other rivers. Moreover, the summed rise in particulate P load from other rivers is of similar magnitude as from Susquehanna. Dissolved nutrient loads have dropped in the upland (Piedmont and above) rivers, but risen in two small rivers in the Coastal Plain affected by lagged groundwater input. In addition, analysis of fractional contributions revealed consistent N trends across the upland watersheds. Finally, total N:total P ratios have declined in most rivers, suggesting the potential for changes in nutrient limitation. Overall, this integrated study of historical data highlights the value of maintaining long‐term monitoring at multiple watershed locations. 相似文献