首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 78 毫秒
1.
2.
3.
Land take is emerging as a global environmental concern, and is particularly critical in intensively developed and land-scarce regions. This paper seeks to understand the effectiveness of the screening stage of Environmental Impact Assessment (EIA) in addressing land take. Screening is the stage where a decision is made as to whether an EIA is required for a project. In many jurisdictions, screening results in three pathways: full EIA directly, preliminary EIA only, or preliminary EIA followed by full EIA. We compared the land take of 217 projects triggering the different pathways in a study region in Italy over a 15-year time interval. Land take was quantified by overlaying the footprint of the projects with a land cover map.The results show that while more attention was given to projects with larger land take impacts overall, the cumulative land take from smaller projects not triggering full EIA was considerable (40% of overall land take). The case-by-case examination conducted through the preliminary EIA was found to work better for some project types (ski areas and small urban development), than for others (quarries). Our findings lead us to advocate improvements in current screening procedures to ensure that the land take impacts are quantified and made explicit in preliminary EIA reports. Our evidence-based approach to determining land take in EIA provides a compelling basis for understanding ways to improve EIA policies, guidance and practice.  相似文献   

4.
Environmental Impact Assessment (EIA) incorporates environmental aspects into decision-making, but sometimes it is not effective in rejecting projects with dubious justification, significant impacts and little social utility, especially when they have political support. EIA is expected to achieve sustainable development, but without calling development into question; however, it should be able to ask the question of whether development is really necessary. Although EIA is political, as a part of the decision-making process, politicization must be limited to prevent it from becoming a mere instrument for giving an “environmental veneer” to development. Some measures thar can help avoid unjustified projects are: adopting administrative justice approach to EIA; minimising politicization of EIA agencies; improving transparency in decision-making and proportionality of EIA procedures; carrying out pre-feasibility studies; increasing the scope of SEA; allowing more than one SEA or EIA procedure for the same development throughout the planning process; strengthening the justification of the project in EIA documents; or making the scoping phase mandatory at least for major projects.  相似文献   

5.
The world's declining plant biodiversity depends on the efficacy of many policy tools, including Environmental Impact Assessment (EIA). While scholars have long been trying to understand how biodiversity information affects EIA decision-making, very few studies have addressed the specific challenges associated with threatened plant species. Based on content analysis of 83 EIA processes that proposed vegetation removals in the southeastern Brazilian state of Minas Gerais, this study evaluated the extent to which threatened plant species were considered in decision-making. The study found that the developers of 31 projects (37% of the 83 analyzed EIA projects) disclosed the occurrence of threatened plant species in the potentially affected areas. The detailed content analysis of their respective Environmental Impact Statement (EIS) review reports revealed that the majority of the identified impacts and respective compensation programs targeted tree habits, and under a variety of rationales. Developers' proposed compensation rates of impacted tree species varied from 1:1 to 50:1. The reviewing process reported issues related mostly to the baseline conditions. Overall, the study found that EIA, in Minas Gerais state, has been functioning mainly as a diagnostic and compensation tool for the removal of tree species. The study calls for improvements in existing legislation and the development of technical guidance and capacity-building programs for EIA stakeholders.  相似文献   

6.
Forests are becoming severely fragmented as a result of land development. South Korea has responded to changing community concerns about environmental issues. The nation has developed and is extending a broad range of tools for use in environmental management. Although legally mandated environmental compliance requirements in South Korea have been implemented to predict and evaluate the impacts of land-development projects, these legal instruments are often insufficient to assess the subsequent impact of development on the surrounding forests. It is especially difficult to examine impacts on multiple (e.g., regional and local) scales in detail. Forest configuration and size, including forest fragmentation by land development, are considered on a regional scale. Moreover, forest structure and composition, including biodiversity, are considered on a local scale in the Environmental Impact Assessment process. Recently, the government amended the Environmental Impact Assessment Act, including the SEA, EIA, and small-scale EIA, to require an integrated approach. Therefore, the purpose of this study was to establish an impact assessment system that minimizes the impacts of land development using an approach that is integrated across multiple scales.This study focused on forest fragmentation due to residential development and road construction sites in selected Congestion Restraint Zones (CRZs) in the Greater Seoul Area of South Korea. Based on a review of multiple-scale impacts, this paper integrates models that assess the impacts of land development on forest ecosystems. The applicability of the integrated model for assessing impacts on forest ecosystems through the SEIA process is considered.On a regional scale, it is possible to evaluate the location and size of a land-development project by considering aspects of forest fragmentation, such as the stability of the forest structure and the degree of fragmentation. On a local scale, land-development projects should consider the distances at which impacts occur in the vicinity of the forest ecosystem, and these considerations should include the impacts on forest vegetation and bird species. Impacts can be mitigated by considering the distances at which these influences occur. In particular, this paper presents an integrated environmental impact assessment system to be applied in the SEIA process. The integrated assessment system permits the assessment of the cumulative impacts of land development on multiple scales.  相似文献   

7.
Environmental Impact Assessments (EIAs) are an important analytic tool for identifying and potentially mitigating project risks and negative environmental and societal impacts. Their usefulness, however, depends on how they are implemented and on whether findings are used in public decision-making. Given the notorious vulnerability of public-private interactions to corrupt practices, we examine potential and actual corruption risks across four stages of a generic EIA process. Combined with case analysis of the EIA process in Albania, a Southeastern European context experiencing serious governance challenges, we reflect on the vulnerabilities of EIAs to various forms of corruption from a principal-agent perspective. We concur with earlier research suggesting that the fundamentally rationalist approach behind EIAs do not necessarily match the empirical realities of public environmental decision-making, particularly in less mature EIA systems. We conclude with suggestions for framing a future research agenda in this area and touch on tentative policy remedies.  相似文献   

8.
This paper aims to find ways to streamline the Environmental Impact Assessment (EIA) system in Thailand to increase its effectiveness by comparative analysis with China and Japan. This study is mainly focused on review, update and comparison of EIA systems between these three countries. It is intended to clarify fundamental information of the EIA systems and characteristics of the key elements of EIA processes (screening, consideration of alternatives, prediction or evaluation of impact, and public participation). Moreover, the number of the EIA projects that have been implemented in all the provinces in Thailand are presented. The results identified the similarities and differences of the EIA processes among the three aforementioned countries. The type of EIA report used in Thailand, unlike those in China and Japan, is an Environmental and Health Impact Assessment (EHIA), which is concerned with the health and environmental impacts that could occur from the project. In addition, EIA reports in Thailand are made available to the public online and the shortcomings of the process have details of barriers resulting from the projects to help future projects with reconsideration and improvements. In this study, it is pointed out that Thai's EIA system still lacks local EIA authority which needs to be empowered by implementing a set of laws or ordinance.  相似文献   

9.
Highway construction or expansion projects are among major activities of economic development especially in developing countries. However, road development consistently can lead to major damages to the environment, including habitat fragmentation and ecological instabilities and a considerable threat to fauna and flora. At this point, Environmental Impact Assessment (EIA) in road developments is needed to address and evaluate the ecological issues in decision-making. The object of this study is to strengthen the consideration of ecological issues, i.e., biodiversity in the existing EIA tools. This paper regards a network method as a means to make informed planning decisions by the lessons from a case study. The results indicate that network method is well suited to be applied in ecological impacts assessment. However, some limitations such as complexity and time consumed make casual networks unpopular. Also, impact of traffic noise on acoustic communication (wildlife and human) was performed. It has been shown that sound level for human is much higher than admissible standards. Finally, the study expresses some mitigation measures to improve the acquisition for environmental impact assessment process.  相似文献   

10.
There is increased awareness of the need to balance multiple societal values in land use and development planning. Best practice has promoted the use of landscape-level conservation planning and application of the ‘mitigation hierarchy’, which focuses on avoiding, minimizing or compensating for impacts of development projects. However, environmental impact assessments (EIA) typically focus in a reactive way on single project footprints with an emphasis on environmental values and specifically biodiversity. This separation may miss opportunities to jointly plan for and manage impacts to both environmental and social values. Integrated approaches may have particular benefit in northern Australia, where Indigenous people have native title to as much as 60% of the land area and cultural values are closely linked with natural values. Here, we present a novel framework for integrating biodiversity and cultural values to facilitate use in EIA processes, using the Nyikina Mangala Native Title Determination Area in the Kimberley, Western Australia, as a case study. We demonstrate 1) how social and cultural values can be organized and analyzed spatially to support mitigation planning, 2) how social, cultural, and biodiversity values may reinforce each other to deliver better conservation outcomes and minimize conflict, and 3) how this information, in the hands of Indigenous communities, provides capacity to proactively assess development proposals and negotiate mitigation measures to conserve social, cultural, and biodiversity values following the mitigation hierarchy. Based on values defined through a Healthy Country Planning process, we developed spatial datasets to represent cultural/heritage sites, freshwater features, common native animals and plants represented by biophysical habitat types, and legally-protected threatened and migratory species represented by potential habitat models. Both cultural/heritage sites and threatened species habitat show a strong thematic and spatial link with freshwater features, particularly the Fitzroy River wetlands. We outline some of the challenges and opportunities of this process and its implications for the Northern Australia development agenda.  相似文献   

11.
By applying principles of adaptive management, and by using the valuable information that arthropods provide from assessment and monitoring programs, managers can identify and reduce possible impacts on biodiversity in development projects. In 1996, the Smithsonian Institution's Monitoring and Assessment of Biodiversity program worked together with Shell Prospecting and Development Peru to establish an adaptive management program to protect biodiversity in a natural gas exploration project in a Peruvian rainforest. In this paper, we outlined the conceptual steps involved in establishing an assessment and monitoring program for arthropods, including setting objectives, evaluating the results and making decisions. We also present the results of the assessment using some of groups of arthropods, and summarize the steps taken to identify appropriate groups for monitoring.  相似文献   

12.
结合“三同时”项目竣工验收监测,对建设项目进行环境影响回顾性评价。回顾性评价内容包括:调查、核实项目建设的规模、内容以及污染物的治理设施;对应环评本底进行环境质量验证性监测;根据污染物达标排放监测结果,进行环保十持施有效性分析;清洁生产、循环经济执行情况;总量控制、环境管理体系的落实情况;以及公众调查、结论与建议等。  相似文献   

13.
There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil.In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts.We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The knowledge derived from this study may therefore be useful to a wider range of audience who are concerned with sustainable integration of development and environmental conservation.  相似文献   

14.
This research evaluates the importance and effectiveness of Environmental Impact Assessment (EIA) within wind farm planning debates, drawing on insights from case studies in Scotland. Despite general public support for renewable energy on the grounds that it is needed to tackle climate change and implement sustainable development, many proposed wind farms encounter significant resistance. The importance of planning issues and (EIA) processes has arguably been overlooked within recent wind farm social acceptability discourse. Through semi-structured interviews with key stakeholders and textual analysis of EIA documents, the characteristics of EIA are assessed in terms of its perceived purpose and performance. The data show that whilst respondents perceive EIA to be important, they express concerns about bias and about the inability of EIA to address climate change and wind farm decommissioning issues adequately. Furthermore, the research identifies key issues which impede the effectiveness of EIA, and reveals differences between theoretical and practical framings of EIA. The paper questions the assumption that EIA is a universally applicable tool, and argues that its effectiveness should be analysed in the context of specific development sectors. The article concludes by reviewing whether the recently amended EIA Directive (2014/52/EU) could resolve identified problems within national EIA practice.  相似文献   

15.
The US National Environmental Policy Act (NEPA) requires agencies to consider environmental impacts in the early stages of planning and decision-making. Despite this mandate, agencies typically conduct EIA for projects, rather than for earlier and more strategic decisions, such as plans. This research investigated the extent to which a large federal agency, the US Army, has integrated NEPA analyses with master planning for their installations. Using in-depth case studies of 16 installations, we investigated how and why EIA was (or was not) integrated with planning, and identified the factors that promote or impede integration. Typically, integration has been regarded as concurrence, meaning that the EIA and planning processes are conducted together. Results of this research show, however, that integration can occur, even if the NEPA documents and master plans are not concurrently prepared. In this sense, integration can be viewed as the influence of the EIA process on agency planning and decision-making. Results also indicate that regulations are only one factor, and that several other factors influence the extent of integration, such as agency leadership and organizational incentives. Lessons from this study can help improve both the integration and the substantive implementation of EIA.  相似文献   

16.
Onshore wind farms remain one of the most widely used technologies for the production of renewable energy. These are known to affect birds through disturbance or collision. Most research focus on the impact of wind farms on raptors or other large bird species, especially those of conservation concern. However, limited information exists on the effect of wind farms on small birds. Recovery of large versus small bird populations impacted by wind farms is also largely unstudied. A reason for this is the lack of long-term datasets based on standardized, systematic assessments. We monitored birds in the vicinity of a wind farm in an upland habitat in southern Spain (Malaga province), immediately after installation and 6.5 years post-construction. During both study periods, we observed 11 raptor and 38 non-raptor species (including 30 passerines). We found differences in recovery rates between raptors and non-raptors. Raptors showed an upturn in numbers but non-raptor abundance fell significantly.Greater attention should be paid to the recovery of wildlife after initial impact assessments than at present. This study confirms that regulatory authorities and developers should consider the likely impacts of wind farms on small bird populations. Mitigation measures focused particularly on non-raptor species should be considered and implemented as a means to reduce these negative effects.  相似文献   

17.
Human rights impact assessment (HRIA) is a process for systematically identifying, predicting and responding to the potential impact on human rights of a business operation, capital project, government policy or trade agreement. Traditionally, it has been conducted as a desktop exercise to predict the effects of trade agreements and government policies on individuals and communities. In line with a growing call for multinational corporations to ensure they do not violate human rights in their activities, HRIA is increasingly incorporated into the standard suite of corporate development project impact assessments. In this context, the policy world's non-structured, desk-based approaches to HRIA are insufficient. Although a number of corporations have commissioned and conducted HRIA, no broadly accepted and validated assessment tool is currently available. The lack of standardisation has complicated efforts to evaluate the effectiveness of HRIA as a risk mitigation tool, and has caused confusion in the corporate world regarding company duties. Hence, clarification is needed. The objectives of this paper are (i) to describe an HRIA methodology, (ii) to provide a rationale for its components and design, and (iii) to illustrate implementation of HRIA using the methodology in two selected corporate development projects—a uranium mine in Malawi and a tree farm in Tanzania. We found that as a prognostic tool, HRIA could examine potential positive and negative human rights impacts and provide effective recommendations for mitigation. However, longer-term monitoring revealed that recommendations were unevenly implemented, dependent on market conditions and personnel movements. This instability in the approach to human rights suggests a need for on-going monitoring and surveillance.  相似文献   

18.
The costs of conducting Environmental Impact Assessment (EIA) are well known. Yet the benefits of EIA are much more intangible, leading to a situation where some question its value as the tool of choice for informing decision makers of the sustainability consequences of their actions. Exponents of EIA have thus called for more research on the benefits of EIA in order to provide better evidence on its costs versus benefits, and therefore its value as a decision-making tool. This paper contributes to this evidence by exploring the perceived potential benefits and perceived realised benefits of EIA from a regulators' perspective in the context of sustainable development. Using South Africa as a case study, one third of all the officials responsible for EIA review and decision-making (referred to in this paper as the “regulator”) were surveyed to identify their perceptions of the benefits of EIA, and their ideas on how to bridge the gap between potential benefits and realised benefits. The paper contributes suggestions for the analysis of benefits in a sustainable development context, and identifies some additional benefits currently missing from the literature. In a South African context, the key potential and realised benefits as perceived by regulators are the protection of biodiversity, public participation, access to information, mitigation of environmental impacts, and legal compliance and enforcement.  相似文献   

19.
The use of economic valuation methods to assess environmental impacts of projects and policies has grown considerably in recent years. However, environmental valuation appears to have developed independently of regulations and practice of environmental impact assessment (EIA), despite its potential benefits to the EIA process. Environmental valuation may be useful in judging significance of impacts, determining mitigation level, comparing alternatives and generally enabling a more objective analysis of tradeoffs. In China, laws and regulations require the use of environmental valuation in EIA, but current practice lags far behind. This paper assesses the problems and prospects of introducing environmental valuation into the EIA process in China. We conduct four case studies of environmental economic impact assessment (EEIA), three of which are based on environmental impact statements of construction projects (a power plant, a wastewater treatment plant and a road construction project) and one for a regional pollution problem (wastewater irrigation). The paper demonstrates the potential usefulness of environmental valuation but also discusses several challenges to the introduction and wider use of EEIA, many of which are likely to be of relevance far beyond the Chinese context. The paper closes with suggesting some initial core elements of an EEIA guideline.  相似文献   

20.
There is a widespread tendency to streamline EIA, a confusing concept, which in practice usually means shortening processes to speed up project licensing, facilitating investment. It is reasonable for developers seek processes quick, simple and inexpensive, but it is also the obligation of governments to ensure that approved projects are environmentally suitable. Not all projects subject to EIA have the same impacts, so the existence of two processes, simplified and ordinary, seems reasonable. The aim of this paper is to analyse the implementation of simplified EIA processes, discussing its benefits and drawbacks. To do this, we have analysed 55 EIA processes from 25 jurisdictions, discussing its benefits and drawbacks and selecting effective and well-established formulas for simplified EIA. In most of the analysed cases, simplified EIA is achieved by reducing public participation, one of the pillars of EIA. It seems to be a chain reaction: ordinary EIA processes have been “streamlined” by removing formal scoping, giving rise in practice to simplified processes. As a result, simplified processes have been ultra-simplified, eliminating public participation, turning them, at best, into screening stages. Simplification must ensure a proper EIA, and not merely a shortening of deadlines.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号