首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到5条相似文献,搜索用时 0 毫秒
1.
2.
The aim of this study was to investigate occupational noise exposure and hearing defects among sawmill workers in the south of Thailand. Seven hundred sawmill workers participated, of which 335 (47.9%) were male. The mean age of the sawmill workers was 33.5 years (SD 10.2), and more than 60% were <35 years old; 75.1% of the workers had less than 5 years of work experience. Only about one in four workers (25%) had been trained in use of personal protective equipment (PPE), and half of the participants never or rarely wore PPE while working. The prevalence rate of noise-induced hearing loss (NIHL) was 22.8% (N?=?42). Male workers had significantly higher risk than female workers (odds ratio [OR]?=?2.21). Workers aged older than 25 years had significantly higher risks for NIHL (OR?=?3.51–12.42) than workers younger than 25 years. Sawing workers had higher risk for NIHL than office workers (OR?=?3.07).  相似文献   

3.
我国纺织噪声暴露现状及听力损失情况预测   总被引:1,自引:0,他引:1  
通过对国内纺织业从业人员数量、工龄的统计和企业实地噪声情况的调查,借鉴ISO1999—1975(E)和其它相关方法预测我国纺织行业噪声暴露情况和从业人员的听力损失情况。经过预测,结果显示纺织从业人员暴露于85dB以下噪声的约有289.3万人,85~95dB约有381.2万人,高于95dB约有329.5万人;对于听力损失的预测,采用悲观和乐观法分别进行预测,结果表明约有100.57万人和21.61万人患有听力损失;结合实际调研情况对预测数据进行修正,结果表明目前我国纺织行业约有70.96万人患有听力损失。  相似文献   

4.
A study of the pedestrian casualties and fatalities in road traffic crashes in Durban, a South African municipality, for 1999 was undertaken using official road traffic accident data. The pedestrians age 25 to 44, although only 23.9% of the population, were 39.3% of the casualties and 48.2% of the fatalities. The most vulnerable pedestrians were those 30 to 34 years old who were 6.1% of the population, 11.7% of the casualties, and 14.6% of the fatalities; 35- to 39-year-olds who were 6% of the population, 8.8% of the casualties, and 13.5% of the fatalities; and the 40- to 44-year-olds who were 4.9% of the population, 7.5% of the casualties, and 10.2% of the fatalities. Cars were involved in 52% of the vehicle-pedestrian crashes but had fewer crashes than minibuses and buses, and fewer casualties and fatalities than minibuses, buses, and motorcycles. Minibuses recorded the most crashes at 1,037 per 100 million km, the highest casualty rate of 268 per 100 million km, and highest fatality rate of 17 per 100 million km. Buses, which were involved in 3% of the vehicle-pedestrian crashes, had 951 crashes per 100 million km, 182 casualties per 100 million km, and 11 fatalities per 100 million km. Motorcycles were involved in 1% of the vehicle-pedestrian crashes and had per 100 million km 508 crashes, 192 casualties, and 7 fatalities. There was no statistically significant difference in the monthly distribution of the road traffic crashes.  相似文献   

5.
The paper examines the level of awareness of stakeholders in adopting Inherently Safer Design (ISD) principles in the Project Life Cycle Management (PLCM) of South African Energy utility projects. It seeks to understand whether stakeholders in the latter stages of the Project Life Cycle are competent to make design change decisions on these projects. ISD principles are essentially useful for reducing risks and as such, safety experts have acknowledged it as an excellent approach in the design process. However, there are no known efforts to date that attempt to integrate ISD concepts into PLCM. This paper seeks to fill this gap. This study, through the review of extant literature establishes that ISD principles can be used in project procurement, and adopts a quantitative survey approach in obtaining information from stakeholders in the South African utility industry. Findings reveal that the principles of inherent safety are permeating into the management of South African utility projects but the level of awareness and its adoption are below optimal levels. It also emerged that there is a divergent awareness of ISD strategies amongst PLCM stakeholders and that the design engineers are better informed about the ISD approach of eliminating risks and hazards in the industrial systems studied than other stakeholders. The findings also indicate that the level of awareness of stakeholders of ISD principles is greater within earlier project phases. Based on these findings, the paper concludes that the hazards witnessed within the project execution and finalization phases could be as a result of the low levels of awareness, divergent views and lower use of ISD strategies by PLCM stakeholders. It is suggested that the level of awareness of the principles, concepts, basics and benefits of integrating ISD into PLCM be raised amongst stakeholders functioning within utility industry project procurement in South Africa and that design changes be limited to the earlier phases of utility project procurement.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号