首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
2.
Environmental Impact Assessments (EIAs) that are applied in the planning phases of large land-use and construction projects are aimed at aiding decision-making and mitigating significant environmental impacts. In light of the global biodiversity crisis, conducting high-quality biodiversity impact assessments is important, as biodiversity information, among other factors, has the potential to influence how projects will be implemented in the end. We investigated the biodiversity and bird surveys conducted and the number of bird species of conservation concern in peat extraction and wind farm projects to which an EIA was applied to in 1995–2016 in Finland and compared whether these factors differed between the project types and between implemented and unimplemented projects. We also studied the availability of follow-up monitoring data of biodiversity impacts within the two project types. The number of nationally threatened breeding birds was significantly lower in implemented than in unimplemented peat extraction projects. The overall probability of being implemented was significantly negatively associated with the year the EIA began for both project types. All permitted peat extraction projects and 22% of wind farm projects conducted post-construction biodiversity monitoring; however, only some projects enabled before-after comparisons. Our results are in line with earlier findings that demonstrate the difficulty of showing the direct impacts of biodiversity information on EIA decision-making and to what extent it is related to project approval or rejection. The role of follow-up monitoring in the EIA and project development could also be strengthened.  相似文献   

3.
Screening is a key stage in environmental impact assessment (EIA), but the most common approach based on policy delineation are inherently arbitrary. On the other hand, a case-by-case approach can be complex, slow, and costly. This paper introduces a computational intelligence based on hybrid fuzzy inference system (h-FIS), combining data-driven and expert knowledge, in order to assess its capability of supporting a case-by-case screening in project appraisal. For empirical research, a dataset with appraisal variables of projects highway was made available by a Brazilian environmental protection agency (EPA). Firstly, using this dataset, multivariate analyses were performed to find criteria (xi) capable of indicating statistically significant differences among projects, previously screened by EPA experts into three types (simplified, preliminary, and comprehensive) of environmental impact study (EIS). Then, h-FIS was built through machine learning, using the FRBCS·W algorithm, with xi as input predictors and the type of EIS as the output target. The performances of alternative approaches were compared using cross-validation accuracy tests and the kappa index, with a significance level of 0.05. As a result, the h-FIS achieved accuracy of 92.6% and a kappa index of 0.88, which represented almost perfect agreement between the screening decision provided by the h-FIS and the one performed by the EPA experts. In conclusion, the fuzzy-based computational intelligence was capable of dealing with the complexity involved in screening decision. Therefore h-FIS be considered a promising complementary tool for a case-by-case project appraisal in EIA. For further advances, future research should assess other algorithms, such as genetic fuzzy systems, in order to strengthen the proposed system and make it generally applicable in other projects subject to EIA.  相似文献   

4.
This paper aims to find ways to streamline the Environmental Impact Assessment (EIA) system in Thailand to increase its effectiveness by comparative analysis with China and Japan. This study is mainly focused on review, update and comparison of EIA systems between these three countries. It is intended to clarify fundamental information of the EIA systems and characteristics of the key elements of EIA processes (screening, consideration of alternatives, prediction or evaluation of impact, and public participation). Moreover, the number of the EIA projects that have been implemented in all the provinces in Thailand are presented. The results identified the similarities and differences of the EIA processes among the three aforementioned countries. The type of EIA report used in Thailand, unlike those in China and Japan, is an Environmental and Health Impact Assessment (EHIA), which is concerned with the health and environmental impacts that could occur from the project. In addition, EIA reports in Thailand are made available to the public online and the shortcomings of the process have details of barriers resulting from the projects to help future projects with reconsideration and improvements. In this study, it is pointed out that Thai's EIA system still lacks local EIA authority which needs to be empowered by implementing a set of laws or ordinance.  相似文献   

5.
There is a widespread tendency to streamline EIA, a confusing concept, which in practice usually means shortening processes to speed up project licensing, facilitating investment. It is reasonable for developers seek processes quick, simple and inexpensive, but it is also the obligation of governments to ensure that approved projects are environmentally suitable. Not all projects subject to EIA have the same impacts, so the existence of two processes, simplified and ordinary, seems reasonable. The aim of this paper is to analyse the implementation of simplified EIA processes, discussing its benefits and drawbacks. To do this, we have analysed 55 EIA processes from 25 jurisdictions, discussing its benefits and drawbacks and selecting effective and well-established formulas for simplified EIA. In most of the analysed cases, simplified EIA is achieved by reducing public participation, one of the pillars of EIA. It seems to be a chain reaction: ordinary EIA processes have been “streamlined” by removing formal scoping, giving rise in practice to simplified processes. As a result, simplified processes have been ultra-simplified, eliminating public participation, turning them, at best, into screening stages. Simplification must ensure a proper EIA, and not merely a shortening of deadlines.  相似文献   

6.
Forests are becoming severely fragmented as a result of land development. South Korea has responded to changing community concerns about environmental issues. The nation has developed and is extending a broad range of tools for use in environmental management. Although legally mandated environmental compliance requirements in South Korea have been implemented to predict and evaluate the impacts of land-development projects, these legal instruments are often insufficient to assess the subsequent impact of development on the surrounding forests. It is especially difficult to examine impacts on multiple (e.g., regional and local) scales in detail. Forest configuration and size, including forest fragmentation by land development, are considered on a regional scale. Moreover, forest structure and composition, including biodiversity, are considered on a local scale in the Environmental Impact Assessment process. Recently, the government amended the Environmental Impact Assessment Act, including the SEA, EIA, and small-scale EIA, to require an integrated approach. Therefore, the purpose of this study was to establish an impact assessment system that minimizes the impacts of land development using an approach that is integrated across multiple scales.This study focused on forest fragmentation due to residential development and road construction sites in selected Congestion Restraint Zones (CRZs) in the Greater Seoul Area of South Korea. Based on a review of multiple-scale impacts, this paper integrates models that assess the impacts of land development on forest ecosystems. The applicability of the integrated model for assessing impacts on forest ecosystems through the SEIA process is considered.On a regional scale, it is possible to evaluate the location and size of a land-development project by considering aspects of forest fragmentation, such as the stability of the forest structure and the degree of fragmentation. On a local scale, land-development projects should consider the distances at which impacts occur in the vicinity of the forest ecosystem, and these considerations should include the impacts on forest vegetation and bird species. Impacts can be mitigated by considering the distances at which these influences occur. In particular, this paper presents an integrated environmental impact assessment system to be applied in the SEIA process. The integrated assessment system permits the assessment of the cumulative impacts of land development on multiple scales.  相似文献   

7.
Environmental Impact Assessment (EIA) incorporates environmental aspects into decision-making, but sometimes it is not effective in rejecting projects with dubious justification, significant impacts and little social utility, especially when they have political support. EIA is expected to achieve sustainable development, but without calling development into question; however, it should be able to ask the question of whether development is really necessary. Although EIA is political, as a part of the decision-making process, politicization must be limited to prevent it from becoming a mere instrument for giving an “environmental veneer” to development. Some measures thar can help avoid unjustified projects are: adopting administrative justice approach to EIA; minimising politicization of EIA agencies; improving transparency in decision-making and proportionality of EIA procedures; carrying out pre-feasibility studies; increasing the scope of SEA; allowing more than one SEA or EIA procedure for the same development throughout the planning process; strengthening the justification of the project in EIA documents; or making the scoping phase mandatory at least for major projects.  相似文献   

8.
The aim of this article is to examine the needs of nomadic-pastoral land users with respect to EIA theory, methods and effectiveness based on literature review by applying Retief (2010)’s framework. The article intends to identify these needs and analyse whether EIA addresses them sufficiently and appropriately. Retief (2010)’s framework defines theory, methods (quality) and effectiveness as three main interrelated themes of environmental assessment. Our review was guided by these three themes and moreover, using nomadic pastoralism as a test case, we attempted to expand this broad framework into a four-step approach that can be used to systematically examine EIA literature. The approach first adopts the Retief (2010)’s framework and secondly, identifies issues of nomadic-pastoral land use which matter the most with respect to Retief (2010)’s themes. The next step selected 156 articles for literature review considering the issues identified previously and the fourth step examined the selected articles using a concept-centric review and a content analysis. Nomadic-pastoral land users need EIA theory to incorporate irrational logic and complex and unpredictable socio-ecological features of nomadic-pastoral land use. Decisions made based on the rational decision-making model in EIA cannot sufficiently incorporate the needs of nomadic-pastoral land use due to uncertainties associated with rational decision-making and different power, values and interests of stakeholders in pasture land resources. Furthermore, the needs of nomadic-pastoral land users with respect to EIA methods are related to impact pathways and dynamic character of land use. EIA methods systematically address impact pathways. However, the current EIA methods primarily focus on static land use, and do not address sufficiently and appropriately dynamic nature of land use. For nomadic-pastoral land users, maintaining land quality in nomadic pastoralism and participation in EIA are the most important issues with respect to effectiveness of EIA. However, empirical data are needed to examine whether these needs are addressed in EIA. Nevertheless, the current frameworks for evaluation of effectiveness of EIA are sufficient for assessment of EIA's capacity for addressing the needs of nomadic-pastoral land users. Further studies should aim at incorporating the nature of socio-ecological interaction and dynamics into EIA theories and developing suitable models on herding mobility and strategy for impact prediction in EIA.  相似文献   

9.
Environmental impact assessment (EIA) is a policy tool used for evaluating a project proposal from physical and socioeconomic environmental perspectives. Its aim is to reduce the impact of development on environment, hence, ensuring environmental sustainability. It is mandatory to submit an Environmental Impact Statement before starting a mega project as required by Environmental Protection Act of 1997 and Environmental Policy of Pakistan. Public consultation plays a key role in an EIA system, identifying the likely aspects and impacts of a development activity. This aspect has been ignored in effective enactment of environmental legislation in Pakistan. Sufficient legislative instruments are there to support EIA system in the country but the agencies responsible for the enforcement of environmental regulations have failed to do so. The current research gives an insight into the actual status of EIA system in Pakistan along with the feedback of EIA specialists and university teachers of the concerned departments. A new index has been devised on the basis of questionnaire response to work out the overall performance of EIA system in Pakistan or any other country. The weaknesses and deficiencies of each EIA stage have been worked out for Pakistan and elaborated with the help of the controversial Zero point Interchange Project in the capital city of Pakistan.  相似文献   

10.
11.
This research is an attempt to verify the notion postulated by Robert Bartlett and Lynton Caldwell that the full benefits of environmental impact assessment (EIA) would take decades to be realized. While EIA is intended to directly influence decision-making regarding new development proposals, the process is also expected to lead to organisational learning and transformation over time. Our aim was to examine the influence of EIA on a single Western Australian proponent with sustained experience in the process to understand how EIA is used within the organisation and to seek evidence of transformation of the organisation's purpose and mission. The research reviewed literature in order to identify key influences of EIA on organisations, along with semi-structured staff interviews and document analysis for the case study organisation. Ascertaining causality that involvement in EIA processes influences or effects organisational learning and transformation is a challenge in the face of other societal events. Document analysis and interviewee data indicates that the action-forcing nature of EIA did influence proponent behavior through the creation of internal processes seeking to ensure robust design of new projects that would satisfy environmental protection expectations, without the need to trigger formal EIA. Evidence of EIA values and thinking were apparent within internal documentation, including the evolving mission statement. Our research indicates that participation in the EIA process can positively influence organisational learning and transformation by guiding internal change for decision-making.  相似文献   

12.
The use of economic valuation methods to assess environmental impacts of projects and policies has grown considerably in recent years. However, environmental valuation appears to have developed independently of regulations and practice of environmental impact assessment (EIA), despite its potential benefits to the EIA process. Environmental valuation may be useful in judging significance of impacts, determining mitigation level, comparing alternatives and generally enabling a more objective analysis of tradeoffs. In China, laws and regulations require the use of environmental valuation in EIA, but current practice lags far behind. This paper assesses the problems and prospects of introducing environmental valuation into the EIA process in China. We conduct four case studies of environmental economic impact assessment (EEIA), three of which are based on environmental impact statements of construction projects (a power plant, a wastewater treatment plant and a road construction project) and one for a regional pollution problem (wastewater irrigation). The paper demonstrates the potential usefulness of environmental valuation but also discusses several challenges to the introduction and wider use of EEIA, many of which are likely to be of relevance far beyond the Chinese context. The paper closes with suggesting some initial core elements of an EEIA guideline.  相似文献   

13.
The Environmental Impact Assessment Directive (EIA Directive) has created a reference framework for the implementation of the system of Environmental Impact Assessment (EIA) into the legal systems of the Member States of the European Union, including the countries belonging to the Visegrad Group (V4): Poland, Slovakia, the Czech Republic and Hungary. The Directive was the basis for the introduction of compulsory stages of the EIA process in the V4. The stages were then adapted to national requirements, including thresholds of the qualifying criteria of projects at the screening and scoping stages. The EIA system in the analysed countries has been growing, changing and being modified together with the political and economic changes of the last 30 years. Although all Visegrad Group countries are members of the EU and should harmonize the provisions of the EIA Directive and its amendments, there still exist singularities in each country's national EIA legislation, in terms of complementarities among the V4 countries, access to information resources, protection of natural resources, mitigation of socio-environmental impacts, or transboundary impact assessment. The article compares and evaluates the EIA systems in the four countries, specifies similarities and differences in the implementation of administrative proceedings and points out opportunities to strengthen the system. It presents selected results of a study conducted in 2013 within the framework of the international project “Assessment of the quality of the environment in the V4 Countries” (AQE V4). This paper indicates examples of good practice in the EIA systems and the obtained results are compared regarding the amendments to the current European Union EIA Directive.  相似文献   

14.
Our understanding of natural ecosystems can be measured by our ability to predict their responses to external disturbances. Predictions made during environmental impact assessment (EIA) for major development projects are hypotheses about such responses, which can be tested with data collected in environmental monitoring programmes. The systematic comparison of predicted and actual impacts has been termed environmental impact audit. Ecosystem disturbances associated with major resource developments, though of lesser magnitude than those associated with natural cataclysms, are generally of far greater magnitude than those which can be applied experimentally. Environmental audit can hence provide critical tests of theory in a number of natural sciences. It is also needed to improve the scientific content of EIA. Audits of 4 and 29 EISs respectively have been carried out previously in the UK and USA, but this is the first national scale audit for any country. It is also the first attempt to select, from the many vague statements in EISs, only those predictions that are scientifically testable, and to determine and analyse their quantitative accuracies. Its principal results are as follows. The average accuracy of quantified, critical, testable predictions in environmental impact statements in Australia to date is 44%±5% s.e. Predictions where actual impacts proved more than expected were on average significantly (p<0.05) less accurate (33%±9%) than those where they proved as or less severe (53%±6%).  相似文献   

15.
Biodiversity, soil, water, air, climate, landscape and other components are typically analyzed in Environmental Impact Assessment (EIA) when looking for the effects of a given project on the biological and ecological components of the environment. Strategic Environmental Assessment (SEA) tends to follow the same general pattern, when looking for the environmental effects of plans and programs. In both cases, ecosystem services are often not explicitly considered. We developed a framework to analyze environmental assessment (EA) practice and infer about ecosystem services based on existing evidence from EIA and SEA reports and supporting information. Our framework addresses the relations between ecosystem services and the environmental factors assessed in EIA and SEA, considering the relevant conceptual frameworks such as the ES cascade model and the DPSIR framework applied to ES provision. We base our proposals on results from a preliminary meta-analysis of recent EIA and SEA reports from several types of plans and projects in Portugal, in which implicit assessments of ES were clearly predominant. We discuss the implications of those results and the opportunities to infer about ecosystem services, and conclude on the need for more dedicated and explicit efforts to ecosystem services assessment in EIA and SEA.  相似文献   

16.
Land take due to urbanization triggers a series of negative environmental impacts with direct effects on quality of life for people living in cities. Changes in ecosystem services are associated with land take, among which is the immediate C loss due to land use conversion. Land use change monitoring represents the first step in quantifying land take and its drivers and impacts. To this end, we propose an innovative methodology for monitoring land take and its effects on ecosystem services (in particular, C loss) under multi-scale contexts. The devised approach was tested in two areas with similar sizes, but different land take levels during the time-span 1990–2008 in Central Italy (the Province of Rome and the Molise Region). The estimates of total coverage of built up areas were calculated using point sampling. The area of the urban patches including each sampling point classified as built up areas in the year 1990 and/or in the year 2008 is used to estimate total abundance and average area of built up areas. Biophysical and economic values for carbon loss associated with land take were calculated using InVEST.Although land take was 7–8 times higher in the Province of Rome (from 15.1% in 1990 to 20.4% in 2008) than in Molise region, our findings show that its relative impact on C storage is higher in the latter, where the urban growth consistently affects not only croplands but also semi-natural land uses such as grasslands and other wooded lands. The total C loss due to land take has been estimated in 1.6 million Mg C, corresponding to almost 355 million €.Finally, the paper discusses the main characteristics of urban growth and their ecological impact leading to risks and challenges for future urban planning and land use policies.  相似文献   

17.
Little is known about the importance of landscape and land cover to the implementation and performance of agricultural conservation projects designed to improve stream quality. In our study, we addressed the potential importance of landscape and land cover to conservation projects by measuring variation across 191 μ-basins (100–2400 ha) and integrating the observed variation into a study design aimed at determining the effectiveness of conservation projects. Our findings indicate that there are strong gradients across which landscape and land cover attributes vary. Land cover varied along a gradient of agricultural intensity, basin morphometry across gradients of stream closure and basin size, basin substrate was described by variation in drumlin formation, glacial landform type, and soil drainage, while agricultural conservation projects varied according to the level of project implementation. Correlation of these gradients found several associations between landscape and land cover, indicating that agricultural intensity was being constrained predominantly by drumlin formation and glacial landform type. Landscape and land cover did not appear to be determining factors in the implementation of conservation projects by land owners. Based on these findings we chose 32 μ-basins which represented the variability along each of the defined gradients for further study. We conclude that landscape scale variables demonstrate important variation and covariation that can and should be integrated into study designs for the assessment of streams and human activities affecting streams.  相似文献   

18.
Ecological monitoring is a complementary component of the overall environmental management and monitoring program of any Environmental Impact Assessment (EIA) report. The monitoring method should be developed for each project phase and allow for periodic reporting and assessment of compliance with the environmental conditions and requirements of the EIA. Also, this method should incorporate a variance request program since site-specific conditions can affect construction on a daily basis and require time-critical application of alternative construction scenarios or environmental management methods integrated with alternative mitigation measures. Finally, taking full advantage of the latest information and communication technologies can enhance the quality of, and public involvement in, the environmental management program. In this paper, a landscape-scale ecological monitoring method for major construction projects is described using, as a basis, 20 months of experience on the Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline Project, covering Turkish Sections Lot B and Lot C. This analysis presents suggestions for improving ecological monitoring for major construction activities.  相似文献   

19.
More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.  相似文献   

20.
This study evaluates and contrasts the management practice and the performance that characterise Environmental Impact Assessments (EIA) in Italy and in the UK. The methodology relies on the investigation of six carefully selected case studies, critically reviewed by referring to EIA and project design information, as well as collecting the opinion of key project participants. The study focuses on the construction industry and on specific key sectors like infrastructure for transport and renewable energy and commercial and tourism development. A main term of reference for the analyses has been established by critically reviewing international literature so as to outline common good practice, requirements for the enhancement of sustainability principles and typically incurred drawbacks. The proposed approach enhances transfer of knowledge and of experiences between the analyzed contexts and allows the provision of guidelines for practitioners. Distinctive differences between the UK and the Italian EIA systems have been detected for pivotal phases and elements of EIA, like screening, scoping, analysis of alternatives and of potential impacts, definition of mitigation strategies, review, decision making, public participation and follow up.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号