共查询到20条相似文献,搜索用时 15 毫秒
1.
Hugo A. Loidga 《Journal of the American Water Resources Association》2001,37(2):467-478
ABSTRACT: Hydraulic modification of flood plains by human activity is the primary cause of rising flood damages throughout the world. As flood‐plain hydraulic roughness increases, so does the water level for a fixed flow rate. This raises the flood damage associated with a flood of given return period, and thus, magnifies the flood risk. This article presents an approach that integrates climatic, hydrologic, and hydraulic principles and presents models to discern the probable causes of flood damage in a basin that undergoes flood‐plain development. The article documents key factors that govern flood damage and presents a case study that illustrates the principles of forensic hydrology in an impacted flood plain. The study demonstrates flood level rise caused by hydraulic alteration of a flood plain between 1969 and 1995 and apportioned the increased water level among agricultural and structural factors located in the study area. 相似文献
2.
Tahir Husain 《Journal of the American Water Resources Association》1989,25(3):527-534
ABSTRACT: This paper presents a simple methodology, using the entropy concept, to estimate regional hydro logic uncertainty and information at both gaged and ungaged grids in a basin. The methodology described in this paper is applicable for (a) the selection of the optimum station from a dense network, using maximization of information transmission criteria, and (b) expansion of a network using data from an existing sparse network by means of the information interpolation concept and identification of the zones from minimum hydrologic information. The computation of single and joint entropy terms used in the above two cases depends upon single and multivariable probability density functions. In this paper, these terms are derived for the gamma distribution. The derived formulation for optimum hydrologic network design was tested using the data from a network of 29 rain gages on Sleeper River Experimental Watershed. For the purpose of network reduction, the watershed was divided into three subregions, and the optimum stations and their locations in each subregion were identified. To apply the network expansion methodology, only the network consisting of 13 stations was used, and feasible triangular elements were formed by joining the stations. Hydrologic information was calculated at various points on the line segments, and critical information zones were identified by plotting information contours. The entropy concept used in this paper, although derived for single and bivaviate gamma distribution, is general in type and can easily be modified for other distributions by a simple variable transformation criterion. 相似文献
3.
R. R. Schoof J. W. Naney W. M. Boxley 《Journal of the American Water Resources Association》1978,14(3):629-639
ABSTRACT: Floodwater-retarding impoundments, controlling 68 percent of the drainage area of Tonkawa Creek, a Washita River tributary in southwestern Oklahoma, have reduced the total flow volume about 36 percent over a 5-year period. Analyses showed the reduction occurred primarily in the less-than-2.5-cfs flow range, indicating the base flow regime has been altered. However, channelizing the downstream, mild-sloped, 3.6 miles of Tonkawa Creek that flows across a Washita River terrace increased the flow volume fourfold at the outlet. A double-masscurve analysis of water yield from a 1,127-square-mile Washita basin segment versus an untreated tributary showed the yield has not changed after 25 percent of the tributary area had been treated. Therefore, the flow reduction caused by structures is being offset by increased yields from channelization. 相似文献
4.
D. J. Wall D. F. Kibler M. E. Hastings 《Journal of the American Water Resources Association》1987,23(5):919-926
Regional procedures to estimate flood magnitudes for ungaged watersheds typically ignore available site-specific historic flood information such as high water marks and the corresponding flow estimates, otherwise referred to as limited site-specific historic (LSSH) flood data. A procedure to construct flood frequency curves on the basis of LSSH flood observations is presented. Simple inverse variance weighting is employed to systematically combine flood estimates obtained from the LSSH data base with those from a regional procedure to obtain improved estimtes of flood peaks on the ungaged watershed. For the region studied, the variance weighted estimates of flow had a lower logarithmic standard error than either the regional or the LSSH flow estimates, when compared to the estimates determined by three standard distributions for gaged watersheds investigated in the development of the methodology. Use of the simple inverse variance weighting procedure is recommended when “reliable” estimates of LSSH floods for the ungaged site are available. 相似文献
5.
R. R. Schoof W. O. Thomas W. M. Boxley 《Journal of the American Water Resources Association》1980,16(2):348-352
ABSTRACT: Winter Creek is a tributary of the Washita River in south-western Oklahoma. The Soil Conservation Service installed floodwater retarding structures which controlled runoff from 56 percent of a 33-square-mile (8550-hectare) gaged drainage area. Application of a hydrologic model to the flood peaks indicated that the structural treatment reduced the flood peaks an average of 61 percent. The Winter Creek channel has narrowed and deepened since the structural treatment was applied. The severe bank erosion occurring before treatment has been arrested and sediment yield from the watershed has been reduced 50 to 60 percent. In some reaches of the channel there has been a dense growth of trees in recent years. 相似文献
6.
Mark E. Hawley Timothy R. Bondelid Richard H. McCuen 《Journal of the American Water Resources Association》1981,17(5):806-813
While storm water detention basins are widely used for controlling increases in peak discharges that result from urbanization, recent research has indicated that under certain circumstances detention storage can actually cause increases in peak discharge rates. Because of the potential for detrimental downstream effects, storm water management policies often require downstream effects to be evaluated. Such evaluation requires the design engineer to collect additional topographic and land use data and make costly hydrologic analyses. Thus, a method, which is easy to apply and which would indicate whether or not a detailed hydrologic analysis of downstream impacts is necessary, should decrease the average cost of storm water management designs. A planning method that does not require either a large data base or a computer is presented. The time co-ordinates of runoff hydrographs are estimated using the time-of-concentration and the SCS runoff curve number; the discharge coordinates are estimated using a simple peak discharge equation. While the planning method does not require a detailed design of the detention basin, it does provide a reasonably accurate procedure for evaluating whether or not the installation of a detention basin will cause adverse downstream flooding. 相似文献
7.
The flood frequency characteristics of 18 watersheds in southeastern Arizona were studied using the log-Boughton and the log-Pearson Type 3 distribution. From the flood frequency study, a generalized envelope for Q100 for watersheds 0.01 to 4000 mi2 in area has been produced for southeastern Arizona. The generalized envelope allows comparisons to be made among the relative flood characteristics of the watersheds used in the study and provides a conservative estimate of Q100 for ungaged watersheds in the region. 相似文献
8.
Jiapeng Hua Zhongmin Liang Zhongbo Yu 《Journal of the American Water Resources Association》2003,39(5):1017-1025
ABSTRACT: New formulas and procedures under the framework of the Rational Formula are presented that are applicable to flood design problems for a small basin if the geometry of the basin can be approximated as an ellipse or a rhombus. Instead of making the assumption in the traditional rational formula that the rainfall is uniformly distributed in the whole duration (Dw) of a design storm, the new method modifies that assumption as: the rainfall is uniformly distributed only in each time interval CD) of the design storm hyetograph, thus extending the rational formula applicable to the case that the rainfall duration is less than the basin concentration time (Tc). The new method can be applied to estimate the flood design peak discharge, and to generate the flood hydrograph simultaneously. The derivation of the formulas is provided in detail in this paper, and an example is also included to illustrate how to apply the new formulas to the flood design problems in small basins. 相似文献
9.
Joseph M. Colonell George R. Higgins 《Journal of the American Water Resources Association》1973,9(4):793-800
Hydrologic response, defined as the annual direct runoff divided by the annual precipitation, was computed for twenty-one watersheds in or near western Massachusetts, using a total of 232 years of hydrologic records. Variability of the results over the period of analysis was greater than is desirable to inspire confidence in the usefulness of the hydrologic response function; however, the results do suggest that the hydrologic response concept, with appropriate refinements, could be applied successfully to the problem of delineating hydrologic provinces and determination of drainage and storage in unregulated watersheds. 相似文献
10.
ABSTRACT: The U.S. Geological Survey has collected flood data for small, natural streams at many sites throughout Georgia during the past 20 years. Flood-frequency relations were developed for these data using four methods: (1) observed (log-Pearson Type HI analysis) data, (2) rainfall-runoff model, (3) regional regression equations, and (4) map-model combination. The results of the latter three methods were compared to the analyses of the observed data in order to quantify the differences in the methods and determine if the differences are statistically significant. Comparison of regression-estimates with observed discharges for sites having 20 years (1966 to 1985) and 10 years (1976 to 1985) of record at different sites of annual peak record indicate that the regression-estimates are not significantly different from the observed data. Comparison of rainfall-runoff-model simulated estimates with observed discharges for sites having 10 years and 20 years of annual peak record indicated that the model-simulated estimates are significantly and not significantly different, respectively. The biasedness probably is due to a “loss of variance” in the averaging procedures used within the model and the short length of record as indicated in the 10 and 20 years of record. The comparison of map-model simulated estimates with observed discharges for sites having 20 years of annual-peak runoff indicate that the simulated estimates are not significantly different. Comparison of “improved” map-model simulated estimates with observed discharges for sites having 20 years of annual-peak runoff data indicate that the simulated estimates are different. The average adjustment factor suggested by Lichty and Liscum to calculate the “improved” map-model overestimates in Georgia by an average of 20 percent for three recurrence intervals analyzed. 相似文献
11.
Kenneth W. Potter Ellen Baldwin Faulkner 《Journal of the American Water Resources Association》1987,23(5):857-861
ABSTRACT: A regression analysis using a generalized least squares approach on flow data from the driftless area of Wisconsin indicates that the ratio of drainage area to time-to-peak is a good predictor of flood quantiles. The estimation of time-to-peak (or some other measure of basin response time) requires direct measurement of river stage and possibly rainfall at the site of which the quantiles are to be estimated. The cost-effectiveness of such an approach must yet be determined. 相似文献
12.
Michael A. Huston Thomas A. Fontaine 《Journal of the American Water Resources Association》1994,30(4):651-661
ABSTRACT: A large storm in December 1990 allowed the evaluation of flood predictions from a hydrologic model (TOPMODEL) that had been previously calibrated on the West Fork of Walker Branch Watershed, a gauged 37.5 ha catchment near Oak Ridge, Tennessee. The model predicts both hydrograph dynamics and the spatial distribution of overland flow using an index based on topography. Maximum extent of overland flow during the storm was determined from patterns of leaf litter removal from valley bottoms. Both the flood hydrograph and the extent of overland flow were accurately predicted using model parameters obtained from a three-month period of normal flow conditions during 1983. 相似文献
13.
Robert D. Jarrett 《Journal of the American Water Resources Association》1990,26(3):419-429
ABSTRACT: Although our current (1990) knowledge of hydrologic and hydraulic processes is based on many years of study, there are river environments where these processes are complex and poorly understood. One of these environments is in mountainous areas, which cover about 25 percent of the United States. Use of conventional hydrologic and hydraulic techniques in mountain-river environments may produce erroneous results and interpretations in a wide spectrum of water-resources investigations. An ongoing U.S. Geological Survey research project is being conducted to improve the understanding of hydrologic and hydraulic processes of mountainous areas and to improve the results of subsequent hydrologic investigations. Future hydrologic and hydraulic research needs in mountainous areas are identified. 相似文献
14.
15.
Thomas C. Winter 《Journal of the American Water Resources Association》2001,37(2):335-349
ABSTRACT: Hydrologic landscapes are multiples or variations of fundamental hydrologic landscape units. A fundamental hydrologic landscape unit is defined on the basis of land‐surface form, geology, and climate. The basic land‐surface form of a fundamental hydrologic landscape unit is an upland separated from a lowland by an intervening steeper slope. Fundamental hydrologic landscape units have a complete hydrologic system consisting of surface runoff, ground‐water flow, and interaction with atmospheric water. By describing actual landscapes in terms of land‐surface slope, hydraulic properties of soils and geologic framework, and the difference between precipitation and evapotranspiration, the hydrologic system of actual landscapes can be conceptualized in a uniform way. This conceptual framework can then be the foundation for design of studies and data networks, syntheses of information on local to national scales, and comparison of process research across small study units in a variety of settings. The Crow Wing River watershed in central Minnesota is used as an example of evaluating stream discharge in the context of hydrologic landscapes. Lake‐research watersheds in Wisconsin, Minnesota, North Dakota, and Nebraska are used as an example of using the hydrologic‐land‐scapes concept to evaluate the effect of ground water on the degree of mineralization and major‐ion chemistry of lakes that lie within ground‐water flow systems. 相似文献
16.
Yeou-Koung Tung Larry W. Mays 《Journal of the American Water Resources Association》1981,17(2):262-269
ABSTRACT: In order to promote a uniform and consistent approach for floodflow frequency studies, the U.S. Water Resources Council has recommended the use of the log-Pearson type III distribution with a generalized skew coefficient. This paper investigates various methods of determining generalized skew coefficients. A new method is introduced that determines generalized skew coefficients using a weighting procedure based upon the variance of regional (map) skew coefficients and the variance of sample skew coefficients. The variance of skew derived from sample data is determined using either of two non-parametric methods called the jackknife or bootstrap. Applications of the new weighting procedure are presented along with an experimental study to test various weighting procedures to derive generalized skew coefficients. 相似文献
17.
Pierre Y. Julien Bahram Saghafian Fred L. Ogden 《Journal of the American Water Resources Association》1995,31(3):523-536
ABSTRACT: The proliferation of watershed databases in raster Geographic Information System (GIS) format and the availability of radar-estimated rainfall data foster rapid developments in raster-based surface runoff simulations. The two-dimensional physically-based rainfall-runoff model CASC2D simulates spatially-varied surface runoff while fully utilizing raster GIS and radar-rainfall data. The model uses the Green and Ampt infiltration method, and the diffusive wave formulation for overland and channel flow routing enables overbank flow storage and routing. CASC2D offers unique color capabilities to display the spatio-temporal variability of rainfall, cumulative infiltrated depth, and surface water depth as thunderstorms unfold. The model has been calibrated and independently verified to provide accurate simulations of catchment response to moving rainstorms on watersheds with spatially-varied infiltration. The model can accurately simulate surface runoff from flashfloods caused by intense thunderstorms moving across partial areas of a watershed. 相似文献
18.
Mary E. McAfee 《Journal of the American Water Resources Association》1980,16(4):690-696
ABSTRACT: Two small cold water reservoirs with stable water levels were compared with two reservoirs scheduled for complete drawdown to determine the effects of drawdown on invertebrate abundance and fish abundance and density. An extensive literature review supplemented the results with other applicable information. No conclusive evidence of effects of drawdown on invertebrates or fish was found. Characteristics of a reservoir and its drainage basin which obscure or lessen drawdown effects are discussed. Analysis and observation of drawdown procedures showed that duration and scheduling of draw-down periods are important in determining whether drawdown will be harmful to fauna in a given reservoir. 相似文献
19.
S. Lawrence Dingman Kevin J. Palaia 《Journal of the American Water Resources Association》1999,35(5):1233-1243
We develop and compare three regression models for estimating flood quantiles at ungaged stream reaches in New Hampshire and Vermont. These models emerge from systematic analysis and validation of relations between flood magnitude and six candidate predictors reflecting basin size, topography, and climate and channel size at 36 gaging stations with record lengths exceeding 20 years. Of the candidate predictors, bank full width is most highly correlated with flood magnitude and the best prediction equation is based on width. Thus channel geometry is closely related to the current hydrologic regime in spite of geologically recent glaciation and apparently non-alluvial bank materials. We also develop models that use information obtainable from maps or GIS. The best of these uses drainage area and drainage-basin elevation as predictors, but it is substantially less precise than the width-based relation. A third relation using only drainage area as a predictor is even less precise but may be useful for some purposes. No other single predictors or combinations yielded useful predictions, although some had been included in previously-established models for the region. Model comparison included examination of residuals generated by regression using one-at-a-time suppression of data points and comparison with precision obtainable with gaging records of varying lengths. 相似文献
20.
Ahiam I. Shalaby 《Journal of the American Water Resources Association》1994,30(2):307-318
ABSTRACT: Methods of computing probabilities of extreme events that affect the design of major engineering structures have been developed for most failure causes, but not for design floods such as the probable maximum flood (PMF). Probabilities for PMF estimates would be useful for economic studies and risk assessments. Reasons for the reluctance of some hydrologists to assign a probability to a PMF are discussed, and alternative methods of assigning a probability are reviewed. Currently, the extrapolation of a frequency curve appears to be the most practical alternative. Using 46 stations in the Mid-Atlantic region, the log-gamma, log-normal, and log-Gumbel distributions were used to estimate PMF probabilities. A 600,000-year return period appears to be a reasonable probability to use for PMFs in the Mid-Atlantic region. The coefficient of skew accounts for much of the variation in computed probabilities. 相似文献