首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
Special-use forests (SUFs) are nature protected areas in Vietnam used to conserve nature and its biodiversity. While the Vietnamese government has managed to increase the size and number of SUFs, biodiversity within these areas continues to decline. To improve protection of these SUFs, co-management has been advocated in Vietnam. Successfully implementing co-management requires decentralization of authority and a certain extent of public involvement in management activities. This paper assesses how and to what extent the governance of Vietnam’s SUFs have taken up the challenge of shifting from conventional government-based management to co-management. Current practices of (co-) management were investigated in 105 of the 143 SUFs. The results show that the type of co-management varies little between different categories of SUFs. Nevertheless, a national ‘style’ of Vietnamese co-management could be identified, labelled ‘administrative’ co-management; fostering interaction between a variety of actors, but final decision-making power on management remaining strongly in the hands of the provincial government.  相似文献   

2.
Virtually every environmental planner at some time deals with environmental impact assessment (EIA). Public participation is required in most environmental impact assessment programmesaround the world. However, citizen involvement is often reduced to a procedural exercise instead of a substantive process to include the public in environmental decision making. This paper examines public participation in EIA and provides ways to improve its effectiveness. We first examine the rationales for public involvement and its institutionalization through EIA. Next, we analyse the shortcomings and strengths of common approaches to public involvement. Our analysis, supported by two case studies, suggests that going beyond the minimum requirements can benefit the public, the project proponent and the final plan. We conclude with practical steps to improve public participation programmes in environmental planning and decision making.  相似文献   

3.
A set of process-related barriers negatively determines the effectiveness of Environmental Impact Assessment (EIA) in transport planning. Recent research highlights the unstructured stakeholder involvement and inefficient public participation in earlier phases of EIA as key bottlenecks. While the academic literature has produced promising theories for addressing these barriers, they have rarely been translated into solutions applicable and testable in practice. In order to bridge this theory–practice gap, we present a systematic literature review of interventions and mechanisms aimed at facilitating the integration of different sources and types of knowledge during the scoping phase of EIA. This review explores if and how interventions and mechanisms have been conducted in practice; if and why they worked or did not work and how relevant they are for EIA in transport planning. Based on this review, we distil a set of three specific interventions and trigger mechanisms applicable in the context of EIA in transport planning.  相似文献   

4.
With energy crises looming, conflicts over resource extraction and production are on the rise. For communities lacking voice to participate in these conflicts, community-based organisations and local non-governmental organisations help to unite, communicate, and negotiate with other stakeholders. In this paper we compare two cases that demonstrate the roles of organisations in providing voice to citizenry impacted by environmental justice issues. We use Senecah's concept of Trinity of Voice for the purposes of evaluation. These cases provide contrasting examples of how local/regional organisations chose to either expand their organisation's mission to intervene or stick to a strict reading of their mission thus excluding involvement. In both examples we found that organisational involvement, or lack thereof, influenced how citizens were involved in decision-making with one case leading to legislation protecting property owners from industrial activities, and the other leading to a lack of effective involvement and negatively impacted citizens.  相似文献   

5.
This article discusses the concept of public space management and its evolution in a context of wider changes to urban governance. Public space management is taken as a sphere of urban governance in which conflicting societal demands on, and aspirations for, public space are interpreted through a set of processes and practices. Four interlinked dimensions for public space management are proposed: the co-ordination of interventions; the regulation of uses and conflicts between uses; the definition and deployment of maintenance routines; and investment in public spaces and their services. Within this conceptual framework, the paper looks at recent changes in public space management in England to suggest the emergence of alternative models of management. These are based on the roles ascribed to the state, to private agents and to user organisations, and on different approaches to dealing with the four management dimensions. Although the discussion shows that these models are more than just abstract formulations, and have been used to deal with a variety of public space problems, an important purpose for the paper is to provide an analytical framework through which to examine emergent practices in the management of public space and their potential consequences.  相似文献   

6.
Environmental Impact Assessment (EIA) was developed and introduced in the 1960s during a time that was dominated by three key societal influences. These were the growth of modern environmental concern, the drive for more rational, scientific and objective environmental decision making and a desire for more public involvement in environmental decision making. The legitimacy of EIA, as a tool to aid decision making, lies in its ability to meet the requirements of all three demands, the chief among these being its ability to be a systematic scientific and rational approach to decision making. Yet today we live in a society that no longer accepts the rationalist model as either possible or desirable. The deference to ‘the expert’ and our trust in science and technology has steadily declined during the period of EIAs development and widespread use. Today, EIA still depends for its legitimacy on its claim to provide a systematic and scientific approach to assessments, while society has moved on. This paper examines this growing divergence and argues that it is time for a major re‐evaluation of the role of EIA in environmental decision making.  相似文献   

7.
The Resource Management Act 1991 (RMA) has introduced environmental impact assessment (EIA) into the operations of territorial authorities at the regional and district level in New Zealand. The system established by the RMA is not only devolved in administrative terms, it is also comprehensive in its application. This paper reports the findings of an interview-based survey of key personnel in selected regional and district councils, along with others from government departments, planning consultancies and law firms. The purpose is to assess the success of the councils in developing appropriate and workable procedures, and to identify the main problems likely to inhibit the development of an effective EIA system in New Zealand. Overall, the task of implementing the EIA requirements has been tackled positively by councils, but there are signs of major differences emerging in the EIA procedures they are developing. Key issues that need to be considered by councils include: the need for explanatory documentation for, and verbal advice to, resource consents applicants at the earliest stage possible; the lack of public involvement in the EIA activities and the need for council staff to encourage and facilitate such participation; and problems with ensuring the adequacy of EIA information in such a devolved and comprehensive EIA system.  相似文献   

8.
海洋油气开发工程环评中公众参与探讨   总被引:2,自引:2,他引:0  
根据我国环境影响评价公众参与现状和海洋油气开发工程公众参与实践,对海洋油气开发工程环评中公众参与进行初步探讨。目前海洋油气开发工程公众参与存在的问题主要有:相关公众界定较难、公众主要是在环评机构主导下的被动参与、信息不对称使公众难以正确表达意见、相关公众中个人的环境素养和法制意识不高。根据存在的问题,建议通过以下方法提高海洋油气开发工程环评公众参与水平:研究制定海洋工程公众参与技术方法规范;掌握好公众参与时机,尽早启动,调动公众主动参与;科学确定公众范围,选择好公众参与对象;结合实际选择公众参与方式。  相似文献   

9.
Environmental impact assessment (EIA) procedures have been in existence in the People's Republic of China over the last decade. The impetus for China's introduction of EIA was provided by the Environmental Protection Law of the People's Republic of China, which was adopted by the Fifth National People's Congress in 1979. The EIA process, which is administrative and not statutorily mandated, has been applied primarily to construction projects. Four stages are typically involved in an EIA investigation: design of the investigation, evaluation of background environmental quality, prediction of environmental impacts, and an assessment and analysis of the environmental impacts. A variety of approaches is used for predicting and analyzing environmental impacts, ranging from ad hoc methods to fairly sophisticated mathematical models. The results of the EIA investigation are compiled in an environmental impact statement, which is used as the basis for decision making by personnel in environmental protection departments. The EIA process does not include provisions for citizen notification or involvement. Views differ concerning the effectiveness of the EIA program in protecting China's natural, social, and cultural environments. Some hold that the EIA program has brought about improvement in environmental protection, while critics contend that the program has had little effect in the prevention of pollution. However, most, if not all, observers seem to feel that the program should be continued and improved. A major avenue for improvement is to place the evaluation of a particular project in a regional context. An earlier version of this paper was distributed at a workshop on Environmental Assessment Development Planning held in conjunction with the VII Annual Meeting of the International Association for Impact Assessment, Brisbane, Australia, July 5–8, 1988.  相似文献   

10.
Developing countries across the world have embraced the policy of high economic growth as a means to reduce poverty. This economic growth largely based on industrial output is fast degrading the ecosystems, jeopardizing their long term sustainability. Environmental Impact Assessment (EIA) has long been recognized as a tool which can help in protecting the ecosystems and aid sustainable development. The Screening guidelines for EIA reflect the level of commitment the nation displays towards tightening its environmental protection system. The paper analyses the screening process for EIA in India and dissects the rationale behind the exclusions and thresholds set in the screening process. The screening process in India is compared with that of the European Union with the aim of understanding the extent of deviations from a screening approach in the context of better economic development. It is found that the Indian system excludes many activities from the purview of screening itself when compared to the EU. The constraints responsible for these exclusions are discussed and the shortcomings of the current command and control system of environmental management in India are also explained. It is suggested that an ecosystem carrying capacity based management system can provide significant inputs to enhance the effectiveness of EIA process from screening to monitoring.  相似文献   

11.
This paper examines the extent to which institutional provisions for participation were implemented in Czech communities during the transition period, the types of participatory practices that emerged and the role that NGOs played in fostering community involvement in environmental decision-making. The results indicate that there was virtually no relationship between community action and the presence of active social, cultural, professional and religious organisations. In contrast, participation and mobilisation were more likely to emerge in communities where local, national or international environmental organisations were active. These patterns suggest that specialised NGOs may be instrumental in promoting public participation in local environmental policy and planning processes in states that historically have not had a non-profit sector.  相似文献   

12.
This paper examines the extent to which institutional provisions for participation were implemented in Czech communities during the transition period, the types of participatory practices that emerged and the role that NGOs played in fostering community involvement in environmental decision-making. The results indicate that there was virtually no relationship between community action and the presence of active social, cultural, professional and religious organisations. In contrast, participation and mobilisation were more likely to emerge in communities where local, national or international environmental organisations were active. These patterns suggest that specialised NGOs may be instrumental in promoting public participation in local environmental policy and planning processes in states that historically have not had a non-profit sector.  相似文献   

13.
Environmental impact assessment (EIA) has been promoted as an instrument for preventive environmental management in construction projects, but its performance in safeguarding the environment through influencing project decision-making is questioned. This paper probes the underlying reasons from a governance perspective as an important supplement to the regulatory and technical perspectives. A framework, with process integration, professional governance, and public engagement being its key components, is proposed to analyze the governance arrangements that enable or inhibit the effective functioning of EIA, based on which a comparative study of three infrastructure projects in China, the United States and Finland was conducted. The results reveal that, while the level of process integration and public engagement of EIA determines the degree to which EIA influences project decisions, it is the professional governance that controls the accountability of EIA. The paper has implications on institutionally where efforts should be directed to improve the performance of EIA.  相似文献   

14.
Cross-city analysis in environmental regulation within non-democratic political systems is a neglected area. Taking policy convergence and styles of regulation as the focus, this paper has taken an initial step to compare the environmental impact assessment (EIA) regulation in Hong Kong and Shanghai. In this comparative exercise, it is identified that policy convergence occurs more explicitly in policy ideology and policy consequences, whereas divergence takes place in policy content, regulatory process and public consultation. Convergence, however, is only superficial whereas divergence is substantial. Indeed EIA systems of these two jurisdictions have displayed contrasting styles of regulation. The formal EIA system in Shanghai is dominated by the environmental agency, which regulates informal politics in the EIA process within a legal format. The informal EIA system in Hong Kong is co-ordinated by the environmental agency, which seeks active co-operation with the clients in a consultative EIA process in an informal and discretionary manner. What makes the Hong Kong system superior to the Shanghai system is the existence of institutional channels for public consultation. Within a non-democratic political setting, the EIA process in Hong Kong is more transparent and the EIA system is more accountable to the public, whereas the EIA process in Shanghai is lacking in transparency and the EIA system is under tight bureaucratic control.  相似文献   

15.
Screening is a critical decision-stage in the Environmental Impact Assessment (EIA) process and involves the determination of whether or not a development proposal will require EIA. This decision requires a discretionary judgement on whether the development has the potential to cause ‘significant environmental effects’, and consequently there is potential for diversity to exist in formal requests for EIA. Drawing upon a comprehensive survey of Local Planning Authorities (LPAs) in England and Wales, this paper explores the characteristics of LPA screening decision making since the introduction of revised EIA regulations in March 1999. The paper starts with a theoretical overview of rationality, decision making and planning theory, followed by a brief review of the regulatory context of EIA screening. The research approach is then outlined and the survey findings are presented, including a detailed consideration of organizational and individual level analyses set within the context of planning theory judgement debates. Comparisons with other European countries are briefly made, before drawing conclusions and recommendations.  相似文献   

16.
The social and institutional context of infrastructure planning has shifted tremendously over recent decades. From top–down implementation, infrastructure planners are now forced to incorporate the demands and wishes of citizens and other external stakeholders. This paper adopts the analytical perspective of institutional work to analyse how a number of Dutch infrastructure planning organisations try to remain in control over these changes in their institutional context. Building on social systems thinking, this paper distinguishes three environments in which this control can play out: the internal environment over which an organisation has complete control, an external environment over which an organisation has little control and a transactional environment where the organisation, through its interactions with other actors, can influence institutional development. The paper concludes that while most forms of institutional work applied by the infrastructure planning organisations under study aim to change the organisations’ interactions with stakeholders, the forms of institutional work are predominantly located within the internal environment of planning organisations.  相似文献   

17.
As an aid to decision making Environmental Impact Assessment (EIA) is seen as a rational and systematic process which is often held to be holistic and proactive in its approach to environmental protection (Glasson et al., 1999). The roots of EIA are firmly located within the 1960s' demand for a more systematic and objective approach to environmental decision making and hence within the rationalist model of decision making theory. This paper examines the key stages of the EIA process to assess how far EIA conforms to the rationalist model today. Most research in EIA decision making has focused on the project authorization process and not the crucial decisions made at the earlier stages of screening and scoping. This study examines those early stages within the context of UK EIA practice. From this examination the paper attempts to locate EIA within decision-making theory.  相似文献   

18.
This paper provides a complete case study analysis of environmental impact assessment (EIA) implementation in China from planning to legal challenge, which is typical but rarely reported. The analysis takes an historical perspective on the regulatory and institutional structures through which EIA has been implemented in China, in order to evaluate the extent to which EIA has matured over the last 10 years. The case study relates to a proposed recreation/tourist development at Dianshan Lake, a protected water resource for Shanghai. Legal and administrative challenge began in 1993, when the case was initiated with a letter from the public, and concluded in 1996, when the case was decided in a court judgment. More recent follow-up research indicates that many issues have continued to be problems for EIA implementation in China. Policy implications in terms of regulatory structure, institutional arrangement, EIA procedure, EIA practitioners, and public participation can be drawn, and lessons learned for both the government and the developers. The study emphasizes the problem of relying on reorientation of existing institutions to promote new (environmental) priorities.  相似文献   

19.
田明远 《四川环境》1997,16(3):7-10
我国经济发展必须符合可持续发展的战略方针,可持续发展是传统发展方式的一种新变革,它在保证经济增长的同时,要求与生态环境保护相适应,以达到提高人民生活质量和健康水平的目的。我国在过去20多年来,环境影响评价在协调环境与发展的关系中起了重要作用。本文则着重论述可持续发展的战略观点对环境影响评价在思想、内容和方法上所赋予的新的任务和要求,环境影响评价必须适应这一变革、以迎接人类社会面临的严重挑战。  相似文献   

20.
Victoria enacted EIA legislation in 1978, before any other state in Australia. The current EIA system, which is administered by the state government, is based upon non-mandatory guidelines which are far more comprehensive than the provisions of the law they elaborate. As it has matured, Victoria's EIA system has developed requirements for the consideration of alternatives, screening, scoping (with project-specific outlines), EIA report-quality checks, proponent response to public comment and the preparation of a ministerial assessment report containing recommendations. The use of consultative committees to advise on scoping and EIA report preparation is one of several public participation provisions. EIA system evaluation criteria are advanced and used to help in reviewing the largely discretionary Victorian system, elements of which could serve as an example to other jurisdictions with incomplete EIA legislative requirements, such as the U.K.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号