首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Recently, various EIA systems have been subjected to system review processes with a view to improve performance. Many of these reviews resulted in some form of legislative reform. The South African Environmental Impact Assessment (EIA) regulations were modified in 2006 with the express intent to improve EIA effectiveness. In order to evaluate to what extent the desired outcome was achieved, the quality of EIA reports produced under the 2006 regulations was investigated for comparative analysis with the preceding regime. A sample of EIA reports from the two legislative regimes was reviewed using an adapted version of a well established method known colloquially as the “Lee and Colley” review package. Despite some improvements in certain aspects, overall report quality has decreased slightly from the 1997 EIA regime. It therefore appears that the modifications to the regulations, often heralded as the solution to improvements in performance have not resulted in improved quality of EIA reports.  相似文献   

2.
This paper aims to find ways to streamline the Environmental Impact Assessment (EIA) system in Thailand to increase its effectiveness by comparative analysis with China and Japan. This study is mainly focused on review, update and comparison of EIA systems between these three countries. It is intended to clarify fundamental information of the EIA systems and characteristics of the key elements of EIA processes (screening, consideration of alternatives, prediction or evaluation of impact, and public participation). Moreover, the number of the EIA projects that have been implemented in all the provinces in Thailand are presented. The results identified the similarities and differences of the EIA processes among the three aforementioned countries. The type of EIA report used in Thailand, unlike those in China and Japan, is an Environmental and Health Impact Assessment (EHIA), which is concerned with the health and environmental impacts that could occur from the project. In addition, EIA reports in Thailand are made available to the public online and the shortcomings of the process have details of barriers resulting from the projects to help future projects with reconsideration and improvements. In this study, it is pointed out that Thai's EIA system still lacks local EIA authority which needs to be empowered by implementing a set of laws or ordinance.  相似文献   

3.
Environmental Impact Assessment (EIA) in Namibia was formally introduced in 2007. However, little EIA related research has been undertaken and the system has not been formally reviewed. This paper evaluates the performance and effectiveness of the EIA system in Namibia. The criteria used for the evaluation were obtained from several sources in the literature and based on legal, administrative, and procedural frameworks. Data were collected through literature review, document analysis, and semi-structured interviews. The study revealed that Namibia has a functional EIA system based on fairly good legislation, institutional arrangements and a well outlined EIA process. Analysis of the legislation and administrative frameworks nevertheless highlighted several weaknesses including a lack of coherence in the legislation and poor implementation. Further weaknesses included a lack of monitoring and enforcement capacity, weak communication and information sharing, inadequate financial and human resources, and inappropriate public consultation approaches. It was found that EIA is slowly being accepted in Namibia and it has a preventative effect on proposed developments. The study recommends an urgent need to complete the ongoing legislative reform to close existing gaps and to improve the performance of the EIA system.  相似文献   

4.
The Environmental Impact Assessment Directive (EIA Directive) has created a reference framework for the implementation of the system of Environmental Impact Assessment (EIA) into the legal systems of the Member States of the European Union, including the countries belonging to the Visegrad Group (V4): Poland, Slovakia, the Czech Republic and Hungary. The Directive was the basis for the introduction of compulsory stages of the EIA process in the V4. The stages were then adapted to national requirements, including thresholds of the qualifying criteria of projects at the screening and scoping stages. The EIA system in the analysed countries has been growing, changing and being modified together with the political and economic changes of the last 30 years. Although all Visegrad Group countries are members of the EU and should harmonize the provisions of the EIA Directive and its amendments, there still exist singularities in each country's national EIA legislation, in terms of complementarities among the V4 countries, access to information resources, protection of natural resources, mitigation of socio-environmental impacts, or transboundary impact assessment. The article compares and evaluates the EIA systems in the four countries, specifies similarities and differences in the implementation of administrative proceedings and points out opportunities to strengthen the system. It presents selected results of a study conducted in 2013 within the framework of the international project “Assessment of the quality of the environment in the V4 Countries” (AQE V4). This paper indicates examples of good practice in the EIA systems and the obtained results are compared regarding the amendments to the current European Union EIA Directive.  相似文献   

5.
Environmental Impact Assessment (EIA) systems are under pressure in many countries, driven by a call for efficiency and streamlining. Such a phenomenon is particularly clear in Brazil, where, in the past few years, a number of influential associations put forward documents proposing significant changes to environmental licensing and impact assessment regulations. So far, there is no publicly available information about any initiative towards scrutinizing those proposals. The objective of this study was to critically review the merits and drawbacks of the changes proposed in those documents. The analysis triangulated content analysis, focus group and online survey data. The focus group included ten seasoned Brazilian EIA specialists; the survey, based on Likert-scale and open-ended questions, resulted in 322 valid responses from EIA professionals. Results show that the proposals generally agree that the current EIA system, while playing a key role in mitigating impacts and enhancing project design, needs many changes. Nonetheless, the proposals neither offered solutions to overcome political, technical and budget barriers, nor established a sense of priority of the most urgent issues. Findings from the focus group and the survey signaled that a number of proposed actions might face public outcry, and that those changes that do not depend on legislative action are more likely to be implementable. Previous studies about EIA reform focused mostly on the context of developed countries after changes had taken place. This study, while addressing the perspective of a large developing country in a “before-reform” stage, shows that capacity-building is a key requirement in EIA reform.  相似文献   

6.
Environmental Impact Assessment (EIA) procedures have been identified as a major barrier to renewable energy (RE) development with regards to large-scale projects (LS-RE). However EIA laws have also been neglected by many decision-makers who have been underestimating its impact on RE development and the stifling potential they possess. As a consequence, apart from acknowledging the shortcomings of the systems currently in place, few governments momentarily have concrete plans to reform their EIA laws. By looking at recent EIA streamlining efforts in two industrialized regions that underwent major transformations in their energy sectors, this paper attempts to assess how such reform efforts can act as a means to support the balancing of environmental protection and climate change mitigation with socio-economic challenges. Thereby this paper fills this intellectual void by identifying the strengths and weaknesses of the Japanese EIA law by contrasting it with the recently revised EIA Directive of the European Union (EU). This enables the identification of the regulatory provisions that impact RE development the most and the determination of how structured EIA law reforms would affect domestic RE project development. The main focus lies on the evaluation of regulatory streamlining efforts in the Japanese and EU contexts through the application of a mixed-methods approach, consisting of in-depth literary and legal reviews, followed by a comparative analysis and a series of semi-structured interviews. Highlighting several legal inconsistencies in combination with the views of EIA professionals, academics and law- and policymakers, allowed for a more comprehensive assessment of what streamlining elements of the reformed EU EIA Directive and the proposed Japanese EIA framework modifications could either promote or stifle further RE deployment.  相似文献   

7.
The world's declining plant biodiversity depends on the efficacy of many policy tools, including Environmental Impact Assessment (EIA). While scholars have long been trying to understand how biodiversity information affects EIA decision-making, very few studies have addressed the specific challenges associated with threatened plant species. Based on content analysis of 83 EIA processes that proposed vegetation removals in the southeastern Brazilian state of Minas Gerais, this study evaluated the extent to which threatened plant species were considered in decision-making. The study found that the developers of 31 projects (37% of the 83 analyzed EIA projects) disclosed the occurrence of threatened plant species in the potentially affected areas. The detailed content analysis of their respective Environmental Impact Statement (EIS) review reports revealed that the majority of the identified impacts and respective compensation programs targeted tree habits, and under a variety of rationales. Developers' proposed compensation rates of impacted tree species varied from 1:1 to 50:1. The reviewing process reported issues related mostly to the baseline conditions. Overall, the study found that EIA, in Minas Gerais state, has been functioning mainly as a diagnostic and compensation tool for the removal of tree species. The study calls for improvements in existing legislation and the development of technical guidance and capacity-building programs for EIA stakeholders.  相似文献   

8.
In this study, we carried out a comparative analysis of the Chilean Environmental Impact Assessment (EIA) system using evaluation criteria compared against three countries to allow for an objective evaluation within the growing demand of society for a more creditable and trustable EIA system.A total of 18 evaluation criteria were selected from the literature, and four new criteria for comparing EIA systems were proposed. The Chilean EIA system was compared to that of Brazil, Spain, and Canada using the following four evaluation criteria categories: EIA Legislation (four criteria), EIA Administration (four criteria), EIA Process (eleven criteria), and After EIA (three criteria). A Hierarchical Agglomerative Cluster Analysis for assessing similarity among the EIA systems of Chile, Canada, and Spain was performed: the similarity being 88%. A Principal Component Analysis shows that only 13 of the selected 22 criteria contribute to the variability of the selected EIA systems. The main strengths of the Chilean EIA system are the existence of Specialized Environmental Courts for the resolution of disputes and Appeal options before execution. The identified weaknesses are an EIA system with high centralization at the national level, the absence of consideration of project alternatives, no requirement for scoping, and that the process of Strategic Environmental Assessment is not binding.Modifications to the Environmental Impact Assessment System Regulation are proposed by authors as feasible improvements particularly in relation to, Decentralization of the EIA system, Alternatives for design, Scoping incorporation, Register of reviewers of baseline information, and the public information process and post-evaluation.The method used seeks out to serve as guidance for countries with similar environmental and social contexts, as well as environmental legislation improvement needs.  相似文献   

9.
Environmental Impact Assessment (EIA) agencies worldwide face multiple challenges that compromise their performance and in turn EIA procedural effectiveness. The current study aimed to evaluate the performance of the Environmental Protection Agency (EPA) of Punjab, Pakistan and the problems it faces whilst implementing EIA and ensuring EIA effectiveness. Semi-structured interviews were used to collect data for the study. EPA performance and procedural effectiveness were evaluated using the formal and informal roles of EPA and EIA good practices respectively. They were also linked to regulatory framework, capacities of actors and contextual factors. Study found that EPA and EIA system performance is weak. Consequently, procedural effectiveness is compromised. The main causes include limited capacities of EPA, consultants and proponents; lack of political will; political interference and outdated regulations. A strong political will of the government is required to enhance the capacity of EPA and other actors in terms of motivation or “the will to” and means or “the ability to”. Measures taken by international EIA agencies to improve performance and effectiveness have also been discussed. Based on this study, lessons can be learnt by not only EPA Punjab but also other agencies in Pakistan and international agencies facing similar challenges.  相似文献   

10.
This paper presents a new methodology for impact assessment—SIAM (Spatial Impact Assessment Methodology)—which is based on the assumption that the importance of environmental impacts is dependent, among other things, on the spatial distribution of the effects and of the affected environment. The information generated by the use of Geographical Information Systems (GIS) in impact identification and prediction stages of Environmental Impact Assessment (EIA) is used in the assessment of impact significance by the computation of a set of impact indices. For each environmental component (e.g., air pollution, water resources, biological resources), impact indices are calculated based on the spatial distribution of impacts. A case study of impact evaluation of a proposed highway in Central Portugal illustrates the application of the methodology and shows its capabilities to be adapted to the particular characteristics of a given EIA problem.  相似文献   

11.
Biodiversity, soil, water, air, climate, landscape and other components are typically analyzed in Environmental Impact Assessment (EIA) when looking for the effects of a given project on the biological and ecological components of the environment. Strategic Environmental Assessment (SEA) tends to follow the same general pattern, when looking for the environmental effects of plans and programs. In both cases, ecosystem services are often not explicitly considered. We developed a framework to analyze environmental assessment (EA) practice and infer about ecosystem services based on existing evidence from EIA and SEA reports and supporting information. Our framework addresses the relations between ecosystem services and the environmental factors assessed in EIA and SEA, considering the relevant conceptual frameworks such as the ES cascade model and the DPSIR framework applied to ES provision. We base our proposals on results from a preliminary meta-analysis of recent EIA and SEA reports from several types of plans and projects in Portugal, in which implicit assessments of ES were clearly predominant. We discuss the implications of those results and the opportunities to infer about ecosystem services, and conclude on the need for more dedicated and explicit efforts to ecosystem services assessment in EIA and SEA.  相似文献   

12.
Follow-up is a vital component of Environmental Impact Assessment (EIA), being essential for understanding assessment outcomes. Long-standing international best practice principles for EIA follow-up are reviewed, and revisions proposed, based on workshops with academics and practitioners, literature review and self-reflection. The proposed revision of EIA follow-up principles will feature an introduction with a simple definition and explanation of objectives for follow-up, and 15 principles. The revised principles address: objective; context; early establishment; project life-cycle; transparency; accessibility; accountability; performance criteria provision; enforcement; learning; adaptive environmental management; flexible or adaptive approach; tiering; cumulative effects and overall performance evaluation. Through publishing this proposal, it is hoped to simultaneously inform or inspire EIA practitioners to enhance their own follow-up knowledge and practices, and to seek input for further refinements that might lead to a revised set of international best practice principles for EIA follow-up.  相似文献   

13.
Environmental impact assessment (EIA) is a policy tool used for evaluating a project proposal from physical and socioeconomic environmental perspectives. Its aim is to reduce the impact of development on environment, hence, ensuring environmental sustainability. It is mandatory to submit an Environmental Impact Statement before starting a mega project as required by Environmental Protection Act of 1997 and Environmental Policy of Pakistan. Public consultation plays a key role in an EIA system, identifying the likely aspects and impacts of a development activity. This aspect has been ignored in effective enactment of environmental legislation in Pakistan. Sufficient legislative instruments are there to support EIA system in the country but the agencies responsible for the enforcement of environmental regulations have failed to do so. The current research gives an insight into the actual status of EIA system in Pakistan along with the feedback of EIA specialists and university teachers of the concerned departments. A new index has been devised on the basis of questionnaire response to work out the overall performance of EIA system in Pakistan or any other country. The weaknesses and deficiencies of each EIA stage have been worked out for Pakistan and elaborated with the help of the controversial Zero point Interchange Project in the capital city of Pakistan.  相似文献   

14.
Article 14 of the Convention on Biological Diversity (CBD) calls for the inclusion of impacts on biodiversity in Environmental Impact Assessment (EIA), which is a significant instrument for site-specific impact prediction. In view of the shortcomings reported for Environmental Impact Statements (EISs), guidelines with indicators could improve the consideration of biological diversity in EISs. This study aims to establish guidelines for the analysis of the inclusion of biodiversity in EISs using a systematic approach based on scientific papers, CBD, and a survey with 43 EIA practitioners from universities, government agencies, environmental consulting companies, business segment, and the third sector. The guidelines comprise 60 indicators arranged into eight categories about the project's characteristics, methods, baseline, impact assessment, alternatives, as well as mitigation, compensation, and monitoring measures. The guidelines also include the levels of biological diversity (ecosystem, species, and genetic diversity), the three elements of biodiversity (composition, structure, and key processes), and the main anthropogenic threats. Thus, the guidelines represent a methodological contribution to EIA that could support decision making and future systematic reviews of EISs.  相似文献   

15.
In this paper, we first review the development of China’s Environmental Impact Assessment (EIA) system in the past 30 years. Then we compare the framework and operational procedures of China’s new EIA law with those of the EU EIA Directive. We also compare public participation, as well as sanctions and control in the two EIA systems. In addition, we identify where the processes in both EIA systems are similar or different from one another. By comparison, we noted that there are at least three obvious weaknesses in China’s EIA system: (1) the application of new models for EIA legislation; (2) the improvement of EIA guidance and education; and (3) the enhancement of public participation in EIA process. Our study indicates that these three major shortcomings should be overcome and improved in China’s EIA system, when compared with the EU EIA system.  相似文献   

16.
Current political discussions and developments indicate the importance and urgency of incorporating climate change considerations into EIA processes. The recent revision of the EU Directive 2014/52/EU on Environmental Impact Assessment (EIA) requires changes in the EIA practice of the EU member states. This paper investigates the extent to which the Environmental Impact Assessment (EIA) can contribute to an early consideration of climate change consequences in planning processes. In particular the roles of different actors in order to incorporate climate change impacts and adaptation into project planning subject to EIA at the appropriate levels are a core topic. Semi-structured expert interviews were carried out with representatives of the main infrastructure companies and institutions responsible in these sectors in Austria, which have to carry out EIA regularly. In a second step expert interviews were conducted with EIA assessors and EIA authorities in Austria and Germany, in order to examine the extent to which climate-based changes are already considered in EIA processes. This paper aims to discuss the different perspectives in the current EIA practice with regard to integrating climate change impacts as well as barriers and solutions identified by the groups of actors involved, namely project developers, environmental competent authorities and consultants (EIA assessors/practitioners). The interviews show that different groups of actors consider the topic to different degrees. Downscaling of climate change scenarios is in this context both, a critical issue with regards to availability of data and costs. Furthermore, assistance for the interpretation of relevant impacts, to be deducted from climate change scenarios, on the specific environmental issues in the area is needed. The main barriers identified by the EIA experts therefore include a lack of data as well as general uncertainty as to how far climate change should be considered in the process without reliable data but in the presence of knowledge about possible consequences at an abstract level. A joint strategy on how to cope with uncertain prognoses about main impacts on environmental issues for areas without reliable data requires a discussion and cooperation between EIA consultants and environmental authorities.  相似文献   

17.
The Association of Southeast Asian Nations has agreed that environmental protection and sustainable use of natural resources are essential for sound economic development. The Environmental Impact Assessment is viewed as an important management tool and an ASEAN Experts Group on the Environment has been working for several years on a model especially adapted to the region and also on case studies of the implementation of EIA. Progress so far has been frustratingly slow due to misunderstanding, a lack of ecological data, inadequate trained manpower and institutional shortcomings for compliance. The author advocates collaboration on an ASEAN model for performing EIA as a means of accelerating acceptance and implementation. The concept of Adaptive Environmental Assessment and Management is proposed as a prototype.  相似文献   

18.
This study identified the role of and challenges faced by Environmental Impact Assessment (EIA) proponents in Punjab, Pakistan. Expected roles of proponents in EIA were taken from regulations, legislation and guidelines. The comments of consultants, Environmental Protection Agency (EPA) and non-governmental organisations (NGOs) regarding the role played by proponents were extracted from literature and used for evaluation. To identify the challenges of proponents in each step of the EIA, 40 semi-structured interviews were conducted with private and government proponents in Punjab. Oftentimes, projects start prior to obtaining an environmental approval. Proper scoping is seldom conducted. Stakeholder involvement in EIA is limited. Proponents sometimes do not share complete project information with consultants, which compromises the report quality and timely decision making. Moreover, some proponents attempt to influence the review and decision making and do not ensure compliance to approval conditions except for few multinationals. The key challenge highlighted by proponents was the discrimination on part of the EPA between private and government projects. Other challenges included lack of professionalism of some consultants and delayed and non-transparent decision making. Although regional in scope, the results of the study hold importance for EIA systems worldwide particularly in countries with similar economic systems who are facing a trade-off between economic growth and environmental sustainability.  相似文献   

19.
In recent years, China's government authorities have devoted increasing attention to the role of public participation processes in Environmental Impact Assessment (EIA). The capacity of these processes to influence decision-making remains widely debated. This paper aims at appraising the institutional rationale informing the implementation of public participation in China's EIA, benchmarking it against three conceptualisations: (1) Normative, based on objectives of empowerment and democratisation; (2) Substantive, where participation is pursued mainly to improve quality of decisions; (3) Instrumental, seeking participation as an instrument to legitimise decision-making processes. The appraisal is carried out by means of a new integrated index (Public Participation Index, PPI), which is applied to a case study representative of latest advancements in EIA public participation practices in China, namely the “New Beijing Airport Project”. Located 46 km south of downtown Beijing, the project was approved in 2014 and it is currently under construction. Results of the PPI application to this case study indicate that, despite progress made in recent years, the implementation of public participation in Chinese EIA still largely responds to an instrumental rationale, with limited capacity for the public to affect decisions.  相似文献   

20.
The main aim of this paper is to explore how perceptual and aesthetic impact analyses are considered in Environmental Impact Assessment (EIA), with specific reference to Italian renewable energy projects. To investigate this topic, the paper starts by establishing which factors are linked with perceptual and aesthetic impacts and why it is important to analyze these aspects, which are also related to legislative provisions and procedures in Europe and in Italy. In particular the paper refers to renewable energy projects because environmental policies are encouraging more and more investment in this kind of primary resource. The growing interest in this type of energy is leading to the realization of projects which change the governance of territories, with inevitable effects on the landscape from the aesthetic and perceptual points of view. Legislative references to EIA, including the latest directive regarding this topic show the importance of integrating the assessment of environmental and perceptual impacts, thus there is a need to improve EIA methodological approaches to this purpose. This paper proposes a profile of aesthetic and perceptual impact analysis in EIA for renewable energy projects in Italy, and concludes with recommendations as to how this kind of analysis could be improved.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号