首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 0 毫秒
1.
Journal of Material Cycles and Waste Management - Excessive waste generation and ineffective waste management systems in developing cities have become a major challenge in achieving urban...  相似文献   

2.
The environmental problem posed by construction and demolition waste (C&D waste) is derived not only from the high volume produced, but also from its treatment and disposal. Treatment plants receive C&D waste which is then transformed into a recycled mixed aggregate. The byproduct is mainly used for low-value-added applications such as land escape restoration, despite the high quality of the aggregate. In the present work, the chemical composition properties and grading curve properties of these aggregates are defined. Furthermore, the resulting recycled concrete with a high proportion of recycled composition, from 20% to 100% replacement of fine and coarse aggregate, is characterized physically and mechanically. An environmental study of the new construction material when all aggregates are substituted by C&D waste shows a low toxicity level, similar to that of other construction materials. The new material also has improved properties with respect to standard concrete such as high fire resistance, good heat insulation, and acoustic insulation.  相似文献   

3.
Journal of Material Cycles and Waste Management - The increasing amount of household waste is becoming one of the major challenges in the sustainable development of rural areas in China. As most...  相似文献   

4.
The new EU challenge is to recover 70% by weight of C&D waste in 2020. Literature reveals that one major barrier is the lack of data. Therefore, this paper presents a model which allows technicians to estimate C&D waste during the design stage in order to promote prevention and recovery. The types and quantities of CW are estimated and managed according to EU guidelines, by building elements and specifically for each project. The model would allow detection of the source of the waste and to adopt other alternative procedures which delete hazardous waste and reduce CW. Likewise, it develops a systematic structure of the construction process, a waste classification system and some analytical expressions which are based on factors. These factors depend on technology and represent a standard on site. It would allow to develop a database of waste anywhere. A Spanish case study is covered. Factors were obtained by studying over 20 dwellings. The source and types of packaging waste, remains, soil and hazardous waste were estimated in detail and were compared with other studies. Results reveal that the model can be implemented in projects and the chances of reducing and recovery C&D waste could be increased, well above the EU challenge.  相似文献   

5.
Recycling of construction and demolition waste contributes decisively to the saving of natural mineral resources. In Germany, processed mineral construction and demolition waste from structural engineering is used nearly exclusively in civil engineering (earthwork and road construction sector) as open-loop recycling. Due to the planned stricter limit values for the protection of soil and water, however, this recycling path in civil engineering may no longer be applicable in the future. According to some new guidelines and standards adopted recently, recycled aggregates may also be used for concrete production in the structural engineering sector (closed-loop recycling). Wastes from the structural engineering sector can thus be kept in a closed cycle, and their disposal on a landfill can be avoided. The present report focuses on the determination of maximum waste volumes that may be handled by this new recycling option. Potential adverse effects on the saving of resources and climate protection have been analysed. For this purpose, materials flow analysis and ecobalancing methods have been used.  相似文献   

6.
The province of Siena, Italy, enacted a new garbage plan (NGP) with the objective of increasing separate waste collection (SWC), shutting down six landfills and increasing incineration. The aim of the paper is to evaluate costs and benefits of the NGP. The hypothesis is that willingness to pay (WTP) should reflect the value to the community of having better environmental quality, according to the Contingent Valuation literature. The paper reports the results of a contingent valuation (CV). The sample was divided into two subsets: firms and households. Through the information gathered via a detailed questionnaire, parametric and non-parametric estimates were elaborated to analyse the WTP of the population for the benefits flowing from increased SWC, increased incineration and shutting down of landfills. These values were expressed as a share of the tax actually paid. Although a small subset of firms and households valued increasing incineration less positively, requesting compensation, on the whole interviewees (with large differences between firms and households) had a net positive WTP for the provisions included in NGP. Parametric estimation procedures enabled us to analyse the economic as well as social and demographic factors affecting these results. These elements are useful for computing a value for the waste charge that also reflects external effects. Finally, we estimated household income elasticity of WTP for the increase in SWC and found less than one: environmental quality is not a luxury good.  相似文献   

7.
8.
Despite being in operation for more than 7 years now, privatised solid waste management (SWM) service in Tanzania has not been formally assessed. This is the premise for the techno-social performance assessment model for SWM contractors, which is presented in this paper. This paper outlines the background of SWM privatisation in Dar es Salaam City in addition to describing and demonstrating the application of the assessment model. The model has three components: service beneficiaries' assessment sub-model, service area technical assessment sub-model, and contractors' attributes sub-model. The model can be used to assess the performance of SWM contractors and in so doing provide data for assessing SWM privatisation as a whole. In the application of the model presented in this paper scores for 5 assessed contractors are in the range 24-65%. The contractor who scored highest is also the most experienced and also the best equipped. Nevertheless, all contractors scored poorly with the respect to their ability and attributes in SWM mainly because most of them are new to the solid waste management field.  相似文献   

9.
This paper focuses on the accumulation of construction waste generated throughout the erection of new residential buildings. A special methodology was developed in order to provide a model that will predict the flow of construction waste. The amount of waste and its constituents, produced on 10 relatively large construction sites (7000-32,000 m2 of built area) was monitored periodically for a limited time. A model that predicts the accumulation of construction waste was developed based on these field observations. According to the model, waste accumulates in an exponential manner, i.e. smaller amounts are generated during the early stages of construction and increasing amounts are generated towards the end of the project. The total amount of waste from these sites was estimated at 0.2 m3 per 1 m2 floor area. A good correlation was found between the model predictions and actual data from the field survey.  相似文献   

10.
Preliminary study for the management of construction and demolition waste   总被引:1,自引:0,他引:1  
This paper refers to the management of the construction and demolition (C&D) waste since, according to the EU Waste Strategy, C&D waste is considered to be one of the priority waste streams and appropriate actions need to be taken with respect to its effective management. Initially, the paper presents the state-of-the-art of the problem of C&D waste, including the amount and composition of C&D waste in EU countries, differences in the characteristics of this waste stream depending on its origin, as well as collection and management practices that are applied. A methodology is described for the estimation of the quantities of the waste stream under examination, since in most cases quantitative primary data is not available. Next, the fundamentals for the development of an integrated scheme for the management of C&D waste are presented and discussed, such as appropriate demolition procedures and location of waste management (off-site waste management, on-site waste management, direct on-site recovery, centralized on-site recovery). Finally, taking into consideration all relevant parameters, alternative systems that could be applied for the management of the C&D waste are suggested.  相似文献   

11.
Currently, construction and demolition waste (C&D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C&D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C&D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C&D waste volume in both new construction and demolition projects.  相似文献   

12.
针对建筑垃圾的特点,分述了不同类别建筑垃圾的利用途径,对今后的相关工作提出了要求和建议.  相似文献   

13.
Construction and demolition (C&D) waste is becoming a major contributor to environmental pollution. In Shanghai, China, the quantity of C&D waste is 2.11E+07 t/yr, which accounts for 45% of the total quantity of solid waste. There has been a growing promotion of recycling C&D waste as an effective way to solve this waste problem. However, the evaluation of the efficiency of recycling C&D waste as a potential source of resources is largely based on traditional economic analysis. The economic analysis emphasizes money instead of the harmony between economic benefit and environmental effects. There is a need for a new strategic approach to investigate the efficiency of recycling C&D waste to achieve the integration between economic, social and environmental effects. Emergy theory can be employed to analyze different recycling options for C&D waste. With reference to the Chinese construction industry, this paper demonstrates that the close-loop recycling option is better than the open-loop recycling option for C&D waste in terms of the integration of social, environmental and sustainable aspects. To evaluate different technology solutions for C&D waste recycling, the emergy theory and method is not limited to a cost-benefit balance but can include economic, social, environmental and sustainable effects.  相似文献   

14.
Environmental management of construction and demolition waste in Kuwait   总被引:6,自引:0,他引:6  
There is an increasing pressure on the construction industry to reduce costs and improve the quality of our environment. The fact is that both of these goals can be achieved at the same time. Although construction and demolition (C&D) constitutes a major source of waste in terms of volume and weight, its management and recycling efforts have not yet seen the light in Kuwait. This study focuses on recycling efforts leading to the minimization of the total C&D waste that is currently landfilled in Kuwait. This paper presents the current status of C&D waste disposal system in Kuwait and identifies the potential problems to the environment, people and economy. Then, it investigates alternative solutions to manage and control this major type of waste in an economically efficient and environmentally safe manner. Next, the paper describes the feasibility of establishing a C&D waste recycling facility in Kuwait. It concludes by highlighting the major benefits and bottleneck problems with such a recycling facility.  相似文献   

15.
The quality of recycled aggregates from construction and demolition waste (CDW) is strictly related to the content of porous and low strength phases, and specifically to the patches of cement that remain attached to the surface of natural aggregates. This phase increases water absorption and compromises the consistency and strength of concrete made from recycled aggregates. Mineral processing has been applied to CDW recycling to remove the patches of adhered cement paste on coarse recycled aggregates. The recycled fine fraction is usually disregarded due to its high content of porous phases despite representing around 50% of the total waste.This paper focus on laboratory mineral separability studies for removing particles with a high content of cement paste from natural fine aggregate particles (quartz/feldspars). The procedure achieved processing of CDW by tertiary impact crushing to produce sand, followed by sieving and density and magnetic separability studies. The attained results confirmed that both methods were effective in reducing cement paste content and producing significant mass recovery (80% for density concentration and 60% for magnetic separation). The production of recycled sand contributes to the sustainability of the construction environment by reducing both the consumption of raw materials and disposal of CDW, particularly in large Brazilian centers with a low quantity of sand and increasing costs of this material due to long transportation distances.  相似文献   

16.
This study examines construction waste generation and management in Thailand. It is estimated that between 2002 and 2005, an average of 1.1 million tons of construction waste was generated per year in Thailand. This constitutes about 7.7% of the total amount of waste disposed in both landfills and open dumpsites annually during the same period. Although construction waste constitutes a major source of waste in terms of volume and weight, its management and recycling are yet to be effectively practiced in Thailand. Recently, the management of construction waste is being given attention due to its rapidly increasing unregulated dumping in undesignated areas, and recycling is being promoted as a method of managing this waste. If effectively implemented, its potential economic and social benefits are immense. It was estimated that between 70 and 4,000 jobs would have been created between 2002 and 2005, if all construction wastes in Thailand had been recycled. Additionally it would have contributed an average savings of about 3.0 x 10(5) GJ per year in the final energy consumed by the construction sector of the nation within the same period based on the recycling scenario analyzed. The current national integrated waste management plan could enhance the effective recycling of construction and demolition waste in Thailand when enforced. It is recommended that an inventory of all construction waste generated in the country be carried out in order to assess the feasibility of large scale recycling of construction and demolition waste.  相似文献   

17.
It has been determined by existing literature that a lot of research efforts have been made to the economic performance of construction waste management (CWM), but less attention is paid to investigation of the social performance of CWM. This study therefore attempts to develop a model for quantitatively evaluating the social performance of CWM by using a system dynamics (SD) approach. Firstly, major variables affecting the social performance of CWM are identified and a holistic system for assessing the social performance of CWM is formulated in line with feedback relationships underlying these variables. The developed system is then converted into a SD model through the software iThink. An empirical case study is finally conducted to demonstrate application of the model. Results of model validation indicate that the model is robust and reasonable to reflect the situation of the real system under study. Findings of the case study offer helpful insights into effectively promoting the social performance of CWM of the project investigated. Furthermore, the model exhibits great potential to function as an experimental platform for dynamically evaluating effects of management measures on improving the social performance of CWM of construction projects.  相似文献   

18.
针对北京市建筑废弃物产量大、资源化利用率低的问题,分析了北京市建筑废弃物的来源、产量、组分及处理现状,阐述了建筑废弃物资源化利用途径和资源化利用工艺,介绍了朝阳区建筑废弃物资源化示范项目建设情况,给出了北京市建筑废弃物资源化利用设施建设合理建议。  相似文献   

19.
One methodology is proposed to estimate the quantification and composition of building-related construction and demolition (C&D) waste in a fast developing region like Shanghai, PR China. The varieties of structure types and building waste intensities due to the requirement of progressive building design and structure codes in different decades are considered in this regional C&D waste estimation study. It is concluded that approximately 13.71 million tons of C&D waste was generated in 2012 in Shanghai, of which more than 80% of this C&D waste was concrete, bricks and blocks. Analysis from this study can be applied to facilitate C&D waste governors and researchers the duty of formulating precise policies and specifications. As a matter of fact, at least a half of the enormous amount of C&D waste could be recycled if implementing proper recycling technologies and measures. The appropriate managements would be economically and environmentally beneficial to Shanghai where the per capita per year output of C&D waste has been as high as 842 kg in 2010.  相似文献   

20.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号