首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
This paper provides a framework for evaluating the effects of population ageing on disaster resilience. In so doing, it focuses on the 1995 Kobe and 2004 Chuetsu earthquakes, two major disasters that affected Japan before the 2011 Great East Japan earthquake. It analyses regional population recovery on the basis of pre‐disaster and post‐recovery demographic characteristics using defined transition patterns of population ageing. The evaluation framework demonstrates that various recovery measures make different contributions to disaster resilience for each transition pattern of population ageing. With reference to regional population ageing, the framework allows for a prediction of disaster resilience, facilitating place vulnerability assessments and potentially informing policy‐making strategies for Japan and other countries with ageing populations.  相似文献   

2.
地震与台风之间的灾害链问题是一个重要的灾害学问题。通过对2011年日本东北9.0级地震和塔拉斯台风灾害链的讨论,使地震-台风灾害链更具事实基础。另外还重点对地震-台风灾害链的成因做了进一步的讨论。  相似文献   

3.
A field hospital overseas requires various types of communication equipment. This study presents the communications equipment used by three Israeli field hospital delegations to earthquake sites at Adapazari, Turkey, in 1999, Port‐au‐Prince, Haiti, in 2010 and Minamisanriku, Japan, in 2011. The delegations to Turkey and Haiti were relatively large (105–230 personnel) and were on the site early (three to four days after each event). The 55‐person delegation to Japan arrived later and was established as an outpatient community hospital. Standard military VHF radios were the only effective tool up to 5 km, until cellular coverage was regained (1–2 weeks after each event). International communication was good. While short‐wave communication (telephone and Internet) was used in Turkey, a direct satellite channel was set up in Haiti. In Japan, BGAN Inmarsat provided efficient Wi‐Fi for all needs. Motorola walkie talkies were not efficient beyond the immediate vicinity. This paper recommends continued use of military‐specification equipment alongside newer modalities, particularly in situations where infrastructure is damaged.  相似文献   

4.
日本兵库县南部地震中生命线系统的震害及其震后恢复   总被引:6,自引:1,他引:6  
罗奇峰 《灾害学》1997,12(1):43-48
分析、介绍了兵库县南部地震中电力、通信、供水、煤气供用等生命线系统所遭受的破坏、震后采取的恢复重建措施和一个月内的恢复进展情况,总结了不同生命线工程的受灾规律和修复特点,在此基础上对制定城市抗震规范,作好城市抗震救灾工作提出了建议。  相似文献   

5.
简要介绍了 1 999年土耳其伊兹米特地震的有关情况 ,包括 :震中附近地区的经济地位、构造背景、地震活动背景、震前地震预报研究国际合作情况 ;这次地震造成的地震灾害、破坏特征和灾害严重的主要原因以及土耳其对地震灾害的法制管理工作等  相似文献   

6.
Ozcevik O  Turk S  Tas E  Yaman H  Beygo C 《Disasters》2009,33(2):180-202
Sustainable redevelopment following disasters has been a main policy objective of post-disaster recovery efforts over the past few decades. Yet, nine years after the 1999 Marmara earthquake in Turkey, the redevelopment of risky housing areas is still a point of debate on the urban planning and disaster mitigation agenda. However, planning studies on mildly and moderately damaged areas located in the centre of Istanbul are ongoing. This article presents the evidence of a pilot project undertaken by Zeytinburnu Municipality, Istanbul, four years after the Marmara earthquake. 2 The aim is to generate a debate on the preconditions required for a sustainable urban regeneration approach in the post-disaster recovery phase. The results of the pilot project underline the importance of capacity building in sustaining social capital, strengthening the legal framework, restructuring planning regulations, and managing the housing redevelopment process by taking advantage of a window of opportunity afforded by the disaster recovery period.  相似文献   

7.
地震、海啸、火山喷发等大规模自然灾害发生前以及发生后,实施适当的防灾对策和采用先进的防灾技术将有助于人类的自我保护。日本建设并启动实大三维震动破裂实验设施——世界最大级震动台,将对再现构造物在地震时的破坏实态、预测破坏以及防止破坏技术的研究发挥积极作用。本文对此作简要介绍。  相似文献   

8.
Ezgi Orhan 《Disasters》2016,40(1):45-64
The lack of attention paid to businesses in disaster management systems from the standpoint of state policies hampers efforts to build community resilience. This paper examines, therefore, the extent of business preparedness for disasters. Empirical research was conducted in Adapazarı, Turkey, 13 years after the İzmit earthquake, which struck the northwest of the country on 17 August 1999, claiming the lives of some 17,000 people. For the study, 232 firms were selected to inquire about their preparedness before and after the event. It is hypothesised that business preparedness is influenced by the following set of variables: business size; business sector; business age; financial condition prior to the disaster; occupancy tenure; market range; education level; and previous disaster experience. In line with the findings of the research, a policy framework is constructed to rationalise the allocation of resources for building resilience at the aggregate level by facilitating business preparedness.  相似文献   

9.
李玉亭 《灾害学》2007,22(1):125-128
论述了日本在1995年阪神大地震后城市防震减灾的新思路:用最先进的科学技术抵御自然灾害,提高防震减灾的能力和水平,使抗震工程学和防震工作得以进一步发展。  相似文献   

10.
Chile has a long‐standing history of natural disasters and, in particular, earthquakes. The latest big earthquake hit Chile on 27 February 2010 with a magnitude of 8.8 on the Richter scale. As an event that had a profound impact on significant portions of the population, the earthquake could theoretically have served to build trust by promoting new trust networks through the enhancement of distant family ties and the interaction between affected neighbours. This study offers an empirical analysis of this theory in the Chilean case. It finds that if initial social capital is very low (thus allowing for post‐disaster looting and violence), then the impact of the trust‐increasing effect is smaller. It also shows that the effect of the disaster was not transitory, but that it persisted and actually increased over time.  相似文献   

11.
Disaster recovery is a dynamic process of creating, maintaining, and changing the meaningful context of survivors. It is completed when they redevelop their self‐reliance and resume managing their social relations with a sense of community. This study employed action research to examine how researchers and survivors collaborated to change disaster recovery through the generative power of metaphor in a small village in Japan that experienced the Niigata–Chuetsu earthquake on 23 October 2004. It outlines long‐term collaborative practices as survivors undertook new activities owing to the power of the metaphor of ‘school’. Once ‘school’ was adopted as the metaphor for where survivors learnt new skills and passed on traditional knowledge, they created new metaphors and performed new activities independently, which is critical for recovery as it demonstrates self‐reliance. The paper assesses the reasons why generative metaphors worked effectively in this case and highlights some academic and practical implications for disaster recovery.  相似文献   

12.
An 8.8‐magnitude earthquake occurred off the coast of Chile on 27 February 2010, displacing nearly 2,000 children aged less than five years to emergency housing camps. Nine months later, this study assessed the needs of 140 displaced 0–5‐year‐old children in six domains: caregiver stability and protection; health; housing; nutrition; psychosocial situation; and stimulation. Multivariate regression was applied to examine the degree to which emotional, physical, and social needs were associated with baseline characteristics and exposure to the earthquake, to stressful events, and to ongoing risks in the proximal post‐earthquake context. In each domain, 20 per cent or fewer children had unmet needs. Of all children in the sample, 20 per cent had unmet needs in multiple domains. Children's emotional, physical, and social needs were associated with ongoing exposures amenable to intervention, more than with baseline characteristics or epicentre proximity. Relief efforts should address multiple interrelated domains of child well‐being and ongoing risks in post‐disaster settings.  相似文献   

13.
Yung‐Nane Yang 《Disasters》2016,40(3):534-553
This paper explores the effectiveness of the nuclear disaster management system in Taiwan via a review of the third (Maanshan) nuclear power plant. In doing so, the Fukushima Daiichi nuclear disaster in Japan on 11 March 2011 is reviewed and compared with the situation in Taiwan. The latter's nuclear disaster management system is examined with respect to three key variables: information; mobilisation; and inter‐organisational cooperation. In‐depth interviews with 10 policy stakeholders with different backgrounds serve as the research method. The results point up the need for improvement in all dimensions. In addition, they highlight three principal problems with the nuclear disaster management system: (i) it might not be possible to provide first‐hand nuclear disaster information immediately to the communities surrounding the Maanshan facility in Pingtung County, southern Taiwan; (ii) the availability of medical resources for treating radiation in Hengchun Township is limited; and (iii) the inter‐organisational relationships for addressing nuclear disasters need to be strengthened. Hence, cooperation among related organisations is necessary.  相似文献   

14.
云南鲁甸5.1、5.0级地震震害分析   总被引:14,自引:0,他引:14  
通过对鲁甸5.1、5.0级两次地震后112个居民点的震害调查,分别给出了5.1级地震等烈度分布图及5.1、5.0级地震等烈度综合分布图;分析了场地条件及其震害、各类房屋的震害特征、典型结构房屋的震害原因以及生命线工程震害。结果表明,两次地震形成较大范围的7度破坏区和少数调查点有8度破坏现象的主要原因是:震源浅,地表振动强烈;盆地区广泛分布有煤层、膨胀土、淤泥土和松散的粉砂、粉土等不良影响地层,且埋藏浅;震区建筑结构简易,抗震能力极差;两次地震震害叠加。最后对灾区恢复重建提出了4条建议。  相似文献   

15.
This study investigated the process of taking action to mitigate damage and prepare for an earthquake at the individual level. Its specific aim was to identify the factors that promote or inhibit individuals in this process. The study was conducted in Istanbul, Turkey—where an earthquake is expected soon—in May and June 2006 using qualitative methods. Within our conceptual framework, three different patterns emerged among the study subjects. Outcome expectancy, helplessness, a low socioeconomic level, a culture of negligence, a lack of trust, onset time/poor predictability, and normalisation bias inhibit individuals in this process, while location, direct personal experience, a higher education level, and social interaction promote them. Drawing on these findings, the paper details key points for better disaster communication, including whom to mobilise to reach target populations, such as individuals with direct earthquake experience and women.  相似文献   

16.
城市防震减灾能力评估研究   总被引:31,自引:3,他引:28  
首先论述了目前国内外关于城市地震灾害风险评估的研究,分析了这些研究取得的成果和存在的不足。然后,提出了城市防震减灾能力的概念,采用人员伤亡,经济损失和震后恢复时间作为衡量城市防震减灾能力强弱的3个最基本的要素。围绕这3个基本要素,列举出影响城市防震减灾能力的6大因素,在此基础上,提出了城市防震减灾能力评价指标体系的具体内容。  相似文献   

17.
ABSTRACT

This article draws from the author’s four-year study of five school communities hit by the 2010–2011 earthquake sequence in the Canterbury region of New Zealand to highlight the roles that schools played in supporting their communities in the aftermath of the disaster. The article begins by synthesising the relevant literature on disasters, schools in earthquake disasters, and the importance of schools to their communities, pre- and post-disaster. The following themes from the data are discussed: (a) the role of schools in their communities prior to the earthquakes; (b) the role of schools in immediate rescue and response; (c) the role of schools in short-term relief; and (d) the role of schools in long-term recovery. The author then argues that as more evidence shows that schools play such crucial roles in post-disaster response and recovery, we need to better prepare and support them to undertake these functions. Further, we need to recognise the wider roles schools play supporting local communities to build and sustain resilience as part of on-going community cohesion and connectedness, so that society is better prepared when major disasters occur.  相似文献   

18.
综述了第6届国际IIASA-DPRI综合灾害风险管理论坛的主要内容,并就中国综合灾害风险管理对策提出了具体的建议。本届论坛的主题是:风险与商业和产经界面临的挑战。论坛除主题报告外,共设置了16个分会场,就综合灾害风险信息共享平台(DRH)的建设、产经界如何迎对灾害风险、地震与洪水灾害风险的综合管理、灾害风险教育与减灾意识的养成、综合灾害风险管理的理论与方法论探讨,以及土耳其国家综合灾害风险管理的经验与教训等进行了深人的研讨。针对上述进展,从我国减灾工作现状,提出从三个方面加强我国综合减灾与灾害风险管理工作,即:各级政府在加强应急管理工作的同时,要高度重视从综合的角度完善减灾战略、规划和能力建设;全面改进产经界迎对灾害风险的能力,特别是非国有中小企业防御灾害风险的能力,以及大型国有企业灾害自保或参保机制的完善;加强综合灾害风险管理研究。  相似文献   

19.
Post‐disaster recovery is a constantly changing and developing process. The authors conducted three real‐name follow‐up surveys at 1, 12 and 18 months after the Yao'an earthquake, which had a surface wave magnitude of 6.0. They also calculated recovery ratios at different times and drew post‐earthquake domestic life recovery curves. Based on the recovery curves, the time trajectory of domestic life recovery takes on an approximate S‐type development and change process. The recovery time process of domestic life can be divided into four periods: emergency period (weeks 0–2(5)), early recovery period (weeks 2(5)–24), rapid recovery period (weeks 24–34) and late recovery period (weeks 34–60(80)).  相似文献   

20.
Corbacioglu S  Kapucu N 《Disasters》2006,30(2):212-233
This paper examines the problems associated with inter-organisational learning and adaptation in the dynamic environments that characterise disasters. The research uses both qualitative and quantitative methods to investigate whether organisational learning took place during and in the time in between five disaster response operations in Turkey. The availability of information and its exchange and distribution within and among organisational actors determine whether self-adaptation happens in the course of a disaster response operation. Organisational flexibility supported by an appropriate information infrastructure creates conditions conducive to essential interaction and permits the flow of information. The study found that no significant organisational learning occurred within Turkish disaster management following the earthquakes in Erzincan (1992), Dinar (1995) and Ceyhan (1998). By contrast, the 'symmetry-breaking' Marmara earthquake of 1999 initiated a 'double loop' learning process that led to change in the organisational, technical and cultural aspects of Turkish disaster management, as revealed by the Duzce earthquake response operations.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号