首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
The mountain rivers of the Indian Himalaya possess a vast potential for hydropower generation. After decades of comparatively modest development recent years have seen a major intensification in the construction of new hydropower dams. Although increasingly portrayed as a form of renewable energy generation, hydropower development may lead to extensive alterations of fluvial systems and conflicts with resource use patterns of local communities. To appraise and reduce adverse effects is the purpose of statutory Environmental Impact Assessments (EIA) and corresponding mitigation plans. However, in the light of ambitious policies for hydropower expansion conventional approaches of environmental assessment are increasingly challenged to keep up with the intensity and pace of development. This paper aims to explore the systemic limitations of environmental assessment for hydropower development in the Indian state of Himachal Pradesh. Based on a qualitative methodology involving interviews with environmental experts, document reviews and field observations the study suggests that the current practice of constraining EIAs to the project level fails to address the larger effects of extensive hydropower development. Furthermore, it is critically discussed as to what extent the concept of Strategic Environmental Assessment (SEA) might have the potential to overcome existing shortcomings.  相似文献   

2.
The Environmental Impact Assessment (EIA) Act of 1992 aimed to make the environment a central theme in development in Nigeria. Nevertheless, the extent of engagement with local cultures in the Nigerian EIA process is not statutorily guaranteed. While most EIAs in Nigeria have been for oil and gas projects in the Niger Delta, and have focused strongly on the biophysical environment, socio-economic and cultural aspects have remained marginal. The palpable neglect of community perceptions and cultural diversity in social impact assessment (SIA) in this region prone to conflict has tended to alienate the people in the decision-making process. Thus, despite claims to compliance with regulatory requirements for EIAs, and numerous purported sustainable development initiatives by international oil companies (IOCs), the region continues to face multiple sustainability challenges. This paper situates local perceptions and cultural diversity in participatory development and canvasses the integration of community perceptions and cultural diversity into SIA in the Niger Delta region. It is argued that doing this would be critical to ensuring acceptance and success of development actions within the context of local culture while also contributing to sustainable development policy in the region.  相似文献   

3.
Quality of environmental impact assessments (EIAs) has been criticized, in part due to a lack of accounting in these tools for differing spatial and temporal scales inherent in ecological data. In the United States, leases of outer continental shelf blocks for offshore wind projects and their construction and operation plans require EIAs in accordance with the National Environmental Policy Act of 1969 and the 1978 Council on Environmental Quality Regulations for Implementing the Procedural Provisions of the National Environmental Policy Act. This study evaluated consideration of spatiotemporal scales of stressors, receptors (specifically cetaceans), and effects in eight federal offshore wind energy EIAs against 26 criteria extracted from federal regulations. The criteria analysis determined that EIAs do not consistently or comprehensively address spatiotemporal scales with respect to federal requirements. Deficiencies in addressing spatiotemporal scales may result from imprecise regulations, intent to simplify encyclopedic documents, or lack of data resulting in incomplete assessments, inappropriate mitigation actions, and projects delays. Recommendations to improve compliance with federal regulations include making federal guidance binding, focusing on non-trivial impacts of species, tiering information, and incorporating outcomes of marine spatial planning.  相似文献   

4.
Small islands have the attention of the international community because they are territories with unique features, and a pressing need for the enhancement of sustainability. Strategic Environmental Assessment (SEA) has characteristics that may promote the development and improvement of sustainability in these territories: (i) changing the mind-set, and the decision-making and institutional paradigm, (ii) facilitating cooperation and coordination between different stakeholders, and (iii) providing a framework for good governance and community empowerment. The scientific literature suggests that there may be a need for context-specific SEA in these territories. However, SEA studies often do not incorporate local contextual information, including intuitive knowledge and sense of place. Therefore, there is a possible gap between what is found in the literature and what local communities think, including different stakeholders and experts. Hence, the main goal of this research was to gain an insight into the views and perspectives of small islands SEA experts about issues related to SEA in European small islands, including context-specific approaches, as well as the contribution of SEA for sustainability in these territories. To achieve the research aim, exploratory research using a questionnaire-based survey was designed, aimed at experts on SEA in European small islands. Findings showed regional cooperation networks may have a fundamental role when developing SEA-specific approaches in these territories. This is because SEA-specific approaches encourage a joint effort among islands within one region to improve SEA capacity-building, develop and share a baseline information system, and to share and exchange resources, overall. Also, guidelines are preferred among experts over more legal frameworks and regulations. Finally, the research showed that experts view SEA as a way to enhance sustainability in small islands. This study highlights the importance of integrating stakeholders, such as territorial experts, to learn and promote the use and improvement of environmental and sustainability tools such as SEA.  相似文献   

5.
6.
There is increasing concern about the disjunct between the intent of higher level government goals and actual projects “on the ground” in Canada. Although strategic environmental assessment (SEA) and a wide variety of plans, policies and programmes (PPP) contain and promote goals that envision a movement towards social, economic and environmental sustainability, these goals are not necessarily upheld by large-scale projects and their environmental impact assessments (EIAs). This disconnect is often illustrated through anecdotal observations. However, to be able to overcome this disjunct it is imperative to come to a clearer understanding of the degree of sustainability or unsustainability of large-scale developments and the way in which they “measure up” in terms of the goals when compared to alternative options.This article proposes a Compliance Analysis method for investigating the level of harmonization between SEA, PPP and proposed projects and their possible alternatives (CAPPP). This method is quantified through a Likert scale which allows for comparison of alternatives for decision making and analytical purposes. The 2009 proposal for the Turcot Exchange redevelopment in Montréal, Québec, put forward by the Ministry of Transport of Québec (MTQ), as well as two alternative proposals, were utilized as a case study to clearly demonstrate the CAPPP methodology and its applicability.The approved plan for the Turcot redevelopment proposed by MTQ was found to be in poor compliance with the majority of the 178 goals in the six sectors that were examined (air quality, climate change, health, noise, socioeconomic, transport), while alternative proposals were found to be in greater accordance with the intentions of governmental SEA and PPP.Synthesis and applications: The CAPPP methodology is a versatile “watchdog” tool for the examination of the level of compliance between stated goals for regions, industrial sectors, or governments and the EIAs of concrete projects “on the ground”. CAPPP can be used as a tool for comparative analysis in decision-making situations at various scales. CAPPP is a fairly straight-forward method that can be used by policy makers, EIA experts, and members of the general public alike.  相似文献   

7.
The prevailing corporate trend regardingdevelopment of energy resources in the tropics emphasizesfinancial gain over long-term societal benefits. Somecorporations are beginning to find a competitive advantage linkedto proactive relations with host communities and adequateprotection of fragile ecosystems. Herein, we describe a casestudy where an international energy production company workedwith stakeholders to achieve social capital and sustainabledevelopment. The strategies aimed to strengthen local capacity toimprove social welfare and to ensure conservation and wise use ofbiodiversity. We provide examples, discuss lessons learned andmake recommendations for future development projects.  相似文献   

8.
Two social impact assessment (SIA) studies of Central Queensland's Coppabella coal mine were undertaken in 2002–2003 and 2006–2007. As ex post studies of actual change, these provide a reference point for predictive assessments of proposed resource extraction projects at other sites, while the longitudinal element added by the second study illustrates how impacts associated with one mine may vary over time due to changing economic and social conditions. It was found that the traditional coupling of local economic vitality and community development to the life cycle of resource projects—the resource community cycle—was mediated by labour recruitment and social infrastructure policies that reduced the emphasis on localised employment and investment strategies, and by the cumulative impacts of multiple mining projects within relative proximity to each other. The resource community cycle was accelerated and local communities forced to consider ways of attracting secondary investment and/or alternative industries early in the operational life of the Coppabella mine in order to secure significant economic benefits and to guard against the erosion of social capital and the ability to cope with future downturns in the mining sector.  相似文献   

9.
Assessing cumulative effects are a vital task for strategic environmental assessments (SEA) but lack of consistent methodology has hampered the development and implementation of useful tools. We present a model for GIS and multivariate analysis to assess the effects on a valued ecosystem type at a regional scale based on the sum of impacts of local projects. We demonstrate application of the model by assessing how hydropower developments would generate cumulative impacts on river gorges for a county in northern Norway. We use principal component analyses (PCA) of spatially-explicit variables from the region to describe the diversity of river gorge ecology with a mathematical low-dimensional bioclimatic space. We then calculate cumulative effects of hydropower development as the proportions of subspaces of the multidimensional bioclimatic PCA that are affected by either existing infrastructure or planned and possible hydropower developments. The results showed that adding development of all potential sites for small-scale hydropower would have substantial impacts on over half of all bioclimatic segments where gorges were registered and more than 70% of all segments with forested river gorges. By demonstrating these possible cumulative effects we can illustrate the need for caution in hydropower planning to avoid reducing river gorge representativeness and diversity. The method can be applied for other types of development projects and other valued ecosystems, provided the assessed ecosystems and development installations can be mapped or modelled over a sufficiently large area.  相似文献   

10.
The global pressure of reducing greenhouse gas emission with an increasing energy demand has promoted the development of hydropower projects. However, these projects are always involved with controversial issues even when providing great positive externalities. This calls for more comprehensively quantitative analysis of hydropower project externalities. This paper establishes an analysis framework for hydropower project externalities based on the Life Cycle Assessment methodology and the economic valuation of hydropower externalities, and then applies the framework to the assessment of the Three Gorges Project and the Xiluodu Project as cases. The results indicate that: (1) hydropower project externalities are multi-component and dynamic in different phases of project life cycle; (2) the construction of large hydropower projects is beneficial for social welfare promotion, but the enhancement doesn't appear immediately at the startup but with a lag; and (3) along the life cycle of a hydropower project, negative externalities are prominent in the early phases while positive ones account for a major proportion in the late phases, calling for special attention to risk management during the construction and benefit allocation management during project operation. The results and recommendations of this paper can also be applied to other types of public or private projects for better social performance.  相似文献   

11.
Marginalised Roma communities in European countries live in substandard housing conditions the improvement of which has been one of the major issues of the Decade of Roma Inclusion, the ongoing intergovernmental European Roma programme. The paper presents EU-funded health impact assessments of national Roma housing policies and programmes in 3 Central and Eastern European countries in light of the evaluation of a completed local project in a fourth CEE country so as to compare predicted effects to observed ones. Housing was predicted to have beneficial health effects by improving indoor and outdoor conditions, access to services, and socioeconomic conditions. Negative impacts were predicted only in terms of maintenance expenses and housing tenure. However, observed impacts of the completed local project did not fully support predictions especially in terms of social networks, satisfaction with housing and neighbourhood, and inhabitant safety. In order to improve the predictive value of HIA, more evidence should be produced by the careful evaluation of locally implemented housing projects. In addition, current evidence is in favour of planning Roma housing projects at the local rather than at the national level in alignment with the principle of subsidiarity.  相似文献   

12.
This paper examines the spread and development of ‘environmental impact assessment’ (EIA) since the enactment of the U.S. Environmental Policy Act on January 1, 1970, which established for the first time under any jurisdiction the formal requirement that an EIA be made and that an ‘environmental impact statement’ (EIS) be filed prior to implementation of certain major development projects. The paper is divided into three parts. In the first part, we briefly review the forms of EIA introduced in the western industrial countries and contrast these with developments in the socialist countries of Eastern Europe, and in the Third World. The approaches to EIA adopted by five countries — the United States, Australia, Canada, the Federal Republic of Germany, and the Soviet Union — are used to illustrate the types of national approaches that have been followed. In the second part of the paper, we use some questions raised by impact assessments as codified in legislation or regulations at the national level to highlight some of the limitations of impact assessment. Finally, we turn to international impact assessments and describe the modest progress made to date. Key impediments to the development of appropriate conceptual and institutional frameworks and methodologies for international EIAs are noted. In conclusion, we offer some suggestions about needed actions at both the national and international levels.  相似文献   

13.
Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.  相似文献   

14.
Transnational higher education, in all its varied forms including offshore campuses, is a huge business, especially in relation to China. As at 2019, nine foreign universities had established campuses in China. Although generally this might be desirable, the social impacts of these campuses on local communities are overlooked. Transnational campuses take a long time to establish, and they experience delays and changes in participating parties, which creates anxiety and uncertainty for host communities. We consider the social impacts, as perceived or experienced by local residents, that arose from the attempted establishment of a transnational university campus in Yantai, Shandong Province, China. We consider how impact history and changing project plans affected residents. A major impact was prolonged uncertainty, especially now that the University of Groningen has cancelled its plans for a campus in Yantai. People felt confused about their future and some had lost trust in news about the project. Excessive expectations, impact history, changing plans, and impacts from urbanization processes generally have led to mixed feelings about the proposed campus. However, most people were willing to have a university campus nearby because they thought there would be benefits, even though they also considered they would experience negative impacts.  相似文献   

15.
During the discussion on the “Environmental Protection Law Amendment (draft)” in 2011, it was decided to drop the proposed clauses related to environmental impact assessments (EIAs) on policy, which means that there remained no provisions for policy EIAs, and China's strategic environmental assessment system stayed limited to the planning level. However, considering that economic policy making is causing significant direct and indirect environmental problems and that almost every aspect of governmental policy has an economic aspect, EIAs on economic policies are of the utmost urgency. The purpose of this study is to review the EIA work that has been carried out on trade policy in China through four case studies, and illustrate how trade policy EIAs can be helpful in achieving better environmental outcomes in the area of trade. Through the trade policy EIA case studies we try to argue for the feasibility of conducting EIAs on economic policies in China. We also discuss the implications of the case studies from the point of view of how to proceed with EIAs on economic policy and how to promote their practice.  相似文献   

16.
This paper explores the underlying practice-based challenges to meaningful and efficient Aboriginal participation in environmental assessment (EA) - participation that provides meaningful opportunities for Aboriginal communities to shape EA, yet assures a degree of efficiency for project proponents who need to obtain EA approvals in a timely and financially viable manner. We do so based on an analysis of the EA policy community's experience with uranium exploration and mining in Saskatchewan, Canada. Many of the challenges to meaningful and efficient Aboriginal participation that emerged are multi-dimensional, often concerning participation processes, decision-making, and relationships. Although scholars have explored many of these issues and have proposed numerous solutions, challenges persist in practice. Several other issues also emerged from our study that have received limited attention, including the non-commitment to early and ongoing participation by smaller project proponents, and the EA exemption of exploration projects; the limited availability of information to project developers on local right holders and Aboriginal interests; expectations about the integration of traditional knowledge and land use in EA not aligning with the information that is available to proponents; confusion about who is responsible for initiating early participation and consultation processes; the lack of early relationship building with potentially affected communities, particularly by governments; and the lack of other viable avenues, outside EA, for Aboriginal communities to raise more strategic issues of concern that affect traditional lands and treaty rights.  相似文献   

17.
Tiering of information and decisions from more strategic plans to more specific projects (and sometimes the other way) can streamline plan-making and assessments, and improve decisions at each planning tier. In particular, it can lead to more consistent and comprehensive impact mitigation at the lower tiers. In practice, however, tiering of assessments is carried out only sporadically. This paper reviews the international literature and case studies on Strategic Environmental Assessment (SEA) and Environmental Impact Assessment (EIA) tiering, and presents the findings of interviews with 14 SEA/EIA experts. It concludes that a conscious and explicit transfer of information from the SEA level, and an explicit receipt of this information at the EIA level are necessary prerequisites for effective tiering. SEAs must be carried out with local actions in mind, in order for mitigation measures to support environmental protection on the ground. Lower-tier decision-makers must also be willing to be bound by decisions by the higher-tier SEA, focusing on implementation of these decisions.  相似文献   

18.
Coal extraction remains supported in many countries despite a global context challenging the industry. A large evidence base links coal with negative consequences for human health. Environmental assessments (EAs) are regulated in nearly every country to assess and set conditions for large industry projects, including coal mines, but tend to exclude health impacts. This study investigated the institutional dynamics surrounding the inclusion of health in coal mining EAs in New South Wales, Australia. Semi-structured interviews with varied stakeholders were supported by a review of legislation, relevant case law and media analysis. Using insights from theories on power and institutions the findings show how EA practice is influenced by the politicization of coal mining that excludes potentially negative narratives surrounding the known human health impacts of coal. Poor EA practice is compounded by legislative ambiguity and lack of conceptual understanding about assessing health. EA's legislative purpose of approving projects undermines confidence that a balanced assessment of impacts has been made. EA is seen as a pro-industry process that disempowers those with dissenting voices. The research explains how the institutional dynamics of a policy process like EA challenge its potential to meaningfully engage with the impact of coal mining on human health.  相似文献   

19.
Environmental Impact Assessments (EIAs) that are applied in the planning phases of large land-use and construction projects are aimed at aiding decision-making and mitigating significant environmental impacts. In light of the global biodiversity crisis, conducting high-quality biodiversity impact assessments is important, as biodiversity information, among other factors, has the potential to influence how projects will be implemented in the end. We investigated the biodiversity and bird surveys conducted and the number of bird species of conservation concern in peat extraction and wind farm projects to which an EIA was applied to in 1995–2016 in Finland and compared whether these factors differed between the project types and between implemented and unimplemented projects. We also studied the availability of follow-up monitoring data of biodiversity impacts within the two project types. The number of nationally threatened breeding birds was significantly lower in implemented than in unimplemented peat extraction projects. The overall probability of being implemented was significantly negatively associated with the year the EIA began for both project types. All permitted peat extraction projects and 22% of wind farm projects conducted post-construction biodiversity monitoring; however, only some projects enabled before-after comparisons. Our results are in line with earlier findings that demonstrate the difficulty of showing the direct impacts of biodiversity information on EIA decision-making and to what extent it is related to project approval or rejection. The role of follow-up monitoring in the EIA and project development could also be strengthened.  相似文献   

20.
Implementing good practice social impact assessment (SIA) that meets international standards in countries in transition is problematic. We reflect on the challenges faced when undertaking SIA in the Russian Federation. These challenges restrict meaningful SIA processes from being undertaken and limit public participation and the effective community engagement of project-affected local people. Based on the self-reflexive professional experience of two Russian-based social practitioners, and their discursive interactions with two leading academics in environmental and social impact assessment, as well as on in-depth interviews with prominent Russian and international experts, we identified the key challenges that prevent effective SIA from being implemented in Russia: a lack of understanding of the international standards; discrepancy in the determination of the social area of influence between the national requirements and international standards; difficulties in combining national and international impact assessment processes; and a tendency by companies to restrict stakeholder engagement to the minimum. We hope that by having an awareness of these limitations, improvements to SIA practice in Russia and elsewhere will be made.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号