首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 69 毫秒
1.
Environmental problems caused by improper mine tailings disposal in the Baguio district include pollution of the Lower Agno River system and its watershed and siltation of irrigation canals in the Pangasinan plains. Direct economic losses are from reduced agricultural production due to siltation of irrigation works and farmlands. To check the adverse ecological effects of improper mine tailings disposal, government regulations have been imposed on mining firms. Several disposal schemes have been proposed, including the use of the reservoir of a multipurpose project to be sited in the watershed where the mines are located. Because of siltation problems, however, trapping the tailings in the reservoir will diminish the economic benefits that can be derived from the project.  相似文献   

2.
Environmental problems associated with socio-economic development have been growing concerns faced by many regional and/or national authorities. However, effective planning may encounter difficulties since uncertainties existing in a number of impact factors and pollution-related processes are often not well acknowledged and reflected. This study advances an interval-fuzzy chance-constrained programming (IFCP) method for planning regional economic and environmental systems, where uncertainties presented as intervals, fuzzy sets and probability distributions can be tackled. The developed method is applied to a real-world case for economic and environmental planning in the New Binhai District in the Municipality of Tianjin, China. Two scenarios based on multiple environmental constraints are examined. The results can help identify desired alternatives for planning regional development strategies, where compromised schemes are provided under an integrated consideration of economic efficiency and environmental protection under multiple uncertainties.  相似文献   

3.
Coal mine reclamation projects are very expensive and require coordination of local and federal agencies to identify resources for the most economic way of reclaiming mined land. Location of resources for mine reclamation is a spatial problem. This article presents a methodology that allows the combination of spatial data on resources for the coal mine reclamation and uses GIS analysis to develop a priority list of potential mine reclamation sites within contiguous United States using the method of extrapolation. The extrapolation method in this study was based on the Bark Camp reclamation project. The mine reclamation project at Bark Camp, Pennsylvania, USA, provided an example of the beneficial use of fly ash and dredged material to reclaim 402,600 sq mi of a mine abandoned in the 1980s. Railroads provided transportation of dredged material and fly ash to the site. Therefore, four spatial elements contributed to the reclamation project at Bark Camp: dredged material, abandoned mines, fly ash sources, and railroads. Using spatial distribution of these data in the contiguous United States, it was possible to utilize GIS analysis to prioritize areas where reclamation projects similar to Bark Camp are feasible. GIS analysis identified unique occurrences of all four spatial elements used in the Bark Camp case for each 1 km of the United States territory within 20, 40, 60, 80, and 100 km radii from abandoned mines. The results showed the number of abandoned mines for each state and identified their locations. The federal or state governments can use these results in mine reclamation planning.  相似文献   

4.
This paper has three primary objectives. First, it seeks to demonstrate that recycling is an important component of sustainable human systems, particularly in the case of electronics, where environmental impacts of disposal are potentially severe. Second, it presents a methodology that could be used to estimate the volumes of electronics or other consumer durable goods that are available for recycling. Third and last, it illustrates, through a case study of Atlanta focused on computers, that metropolitan areas may fruitfully be viewed as opportune centres from which to mine, recycle and reuse cast-off electronic goods. From an environmental and economic development policy perspective, doing so presents an important opportunity to provide new economic opportunities in the most distressed portions of metropolitan areas which have been disproportionately impacted by previous environmentally destructive industrialization practices.  相似文献   

5.
ABSTRACT: The national and regional economic impact of the Bureau of Reclamation's Uncompahgre Project which was authorized in 1903 is assessed. Benefit-cost ratios for the project are calculated for a range of production cost estimates and discount rates. An economic base approach is used to estimate the project's regional economic impact. Although the project has been marginal in terms of an economic efficiency rationale it has been an important impetus to regional economic growth in the Uncompahgre Region over time.  相似文献   

6.
Although the small-scale mining sector in Bolivia has absorbed economic aid, little or no improvement has resulted. It appears that much closer technical and financial co-operation with those operating small mines is called for, including rigid credit supervision. Problems in small-scale mines arise from difficult mining conditions, the tax structure and capital market situation as well as the employment patterns of the mine operators. It is suggested that mechanized projects may not always be the best way to overcome poor conditions, but where they are, lack of collateral is frequently an obstacle. In such cases, a three stage approach to project implementation is proposed.  相似文献   

7.
Economic and financial aspects of mine closure   总被引:1,自引:0,他引:1  
Today, mine reclamation is a key component to a successful mine plan. Most of the industrialized nations have recognized the need to make mining activities relatively environmentally friendly, if they want to continue to benefit from the economic gains from mineral resource development. Countries such as the United States, Canada, Australia and South Africa are leaders in the field and have implemented relatively sophisticated legislation to ensure environmentally correct mine closure. These countries rely on a combination of strict control strategies and economic penalties to ensure compliance. Yet, from the firm's perspective, reclamation activities are counterproductive as they cut into profits. In order to attract economic development and earn much needed economic capital, most of the rest of the world, particularly the developing countries, lack effective mine closure legislation. The traditional command and control type of legislation that is sometimes used is either vague and therefore avoided, or not enforced appropriately, resulting in an undesirable level of environmental degradation. With the use of case studies from Brazil, this article shows that direct controls are effective in some instances and not in others. It proposes that economic and financial tools may be more effective than the traditional direct controls in getting firms to comply with environmental standards, particularly in developing countries where environmental compliance is more difficult to achieve. It explains the use of performance bonding as one type of economic incentive that has proven to be an effective environmental policy in mine planning and closure. The authors additionally push beyond the typical style of performance bonds to introduce a flexible bonding and insurance system that allows governments to maintain strict environmental standards but limits firms financial exposure during the mining process. Such a system learns from the successes of the industrialized countries that use performance bonding and is sensitive to the needs of developing nations to attract investment yet maintain environmental integrity.  相似文献   

8.
ABSTRACT: Recreation benefits or costs are an important aspect in the planning for and evaluation of water resources project strategies. How to include in a quantitative fashion the effects of water quality for planning and analysis is yet unresolved. We describe a quantitative formulation for a recreation function in which the water quality is the argument, and suggest how the coefficients may be evaluated.  相似文献   

9.
ABSTRACT. A multiple goal planning approach is proposed as a solution to the public water resources project selection problem. The goal programming technique enables a comprehensive water resources model. The model considers both economic and environmental objectives and may be implemented with data which are available to project planners.  相似文献   

10.
The Ecological Water Transfer and Rehabilitation Project in the arid inland area of northwest China is an important measure in restoring a deteriorated ecosystem. However, the sustainability of the project is affected by many socio-economic factors. This article examines the attitudes of the local populace toward the project, its impact on the livelihood of the people, and the positive effects of water-efficient agricultural practices in Ejina County. Related data were collected through questionnaire surveys and group discussions. The results identified three critical issues that may influence the sustainability of the project in the study area. The first issue relates to the impact of the project on the livelihood of local herdsmen. The potential for the sustainability of the project is compromised because the livelihood of the herdsmen greatly depends on the compensation awarded by the project. The second issue is that the project did not raise the water resource utilization ratio, which may undermine its final purpose. Finally, the compensation provided by the project considers losses in agriculture, but neglects the externalities and public benefit of eco-water. Thus, appropriate compensation mechanisms should be established and adopted according to local economic, environmental, and social conditions. Some recommendations for improving the sustainability of the project are provided based on the results of this study.  相似文献   

11.
Australia has been a leading mining nation and its mines continue to attract substantial investment due to its strong mineral endowment, mining tradition and high skills base. In recent years Australian mining companies have been facing higher labour costs, which need to be offset by other savings. Automating mine-site machinery offers one potential source of such savings.Underground mines pioneered automated technology largely for safety and mine accessibility reasons and to reduce operating costs. Yet these operations now represent a much smaller portion of the total ore tonnes mined due to the changing mining techniques meaning larger lower grade deposits are becoming economic. It appears the future of mine automation will be directed by surface mining as this maturing technology finds further applications above ground and in the next decade large scale open pit automation trials gain more momentum.This paper assesses the implications of introducing driverless haul trucks in a typical large remote Australian open-pit mine. Such automation will save employee and associated costs, increase operational productive hours and ultimately will reduce mine site workforce numbers. While there will be fewer jobs per mine, with reduced costs and higher productivity some previously uneconomic mines may again be profitable.The social implications of greater mine site automation are the reduction in population of remote mining towns and a decrease in the lower skilled labour requirements for the mining sector. There will be an increase in fly-in fly-out mining operations and companies will establish remote control centres for automated mines in larger cities. This may decrease overall labour requirements and so reduce employment in the sector; therefore, the government should be mindful of implementing policies that ensure a fair return on the economic rent of mineral leases.  相似文献   

12.
矿山工业企业绿色经济评价指标体系研究   总被引:1,自引:0,他引:1  
绿色经济是一种既注重生产经济发展,又注重资源、能源节约利用和生态环境可持续发展的经济。我国矿山企业传统经济评价往往忽视或过度简化了环境保护、资源合理利用、节能指标的量化经济评价,亟待改进。以“费用一收益”经济分析思想为基础,从生产经济、环境保护、资源合理利用和节能降耗四个方面综合构建了矿山工业企业绿色经济评价指标体系,并提出了应用指标体系评价时应注意的问题。  相似文献   

13.
In this study, an inexact fuzzy chance-constrained two-stage mixed-integer linear programming (IFCTIP) approach is proposed for supporting long-term planning of waste-management systems under multiple uncertainties in the City of Regina, Canada. The method improves upon the existing inexact two-stage programming and mixed-integer linear programming techniques by incorporating uncertainties expressed as multiple uncertainties of intervals and dual probability distributions within a general optimization framework. The developed method can provide an effective linkage between the predefined environmental policies and the associated economic implications. Four special characteristics of the proposed method make it unique compared with other optimization techniques that deal with uncertainties. Firstly, it provides a linkage to predefined policies that have to be respected when a modeling effort is undertaken; secondly, it is useful for tackling uncertainties presented as intervals, probabilities, fuzzy sets and their incorporation; thirdly, it facilitates dynamic analysis for decisions of facility-expansion planning and waste-flow allocation within a multi-facility, multi-period, multi-level, and multi-option context; fourthly, the penalties are exercised with recourse against any infeasibility, which permits in-depth analyses of various policy scenarios that are associated with different levels of economic consequences when the promised solid waste-generation rates are violated. In a companion paper, the developed method is applied to a real case for the long-term planning of waste management in the City of Regina, Canada.  相似文献   

14.
This article examines the sustainability of the Grain for Green Project in the Wolong Nature Reserve. Pertinent data were collected through a questionnaire survey and a spatial analysis of reforested lands. The study results identified four critical issues that may influence the sustainability of the project in the study area. The first issue is concerned with the project’s impacts on local sustenance. Because local grain consumption depends greatly on compensation awarded by the project, the potential for sustainability of the project is compromised. The second issue is that the project causes negative effects on local incomes in the Wolong Nature Reserve, which may undermine local economic prospects. The third issue is that the project failed to deliver suitable habitat for the giant panda, although two of the suitability requirements that deal with landform features were met. Lastly, the project neglects great differences among geographical areas in the country, providing the same compensation and length of compensation period to all participants. Appropriate compensation mechanisms should be established and adapted to local economic, environmental, and social conditions. In managing nature reserves and moving toward sustainability, ensuring all aspects of local socioeconomic and ecological/environmental issues are properly addressed is a real challenge. Based on our study, some recommendations for improving sustainability of the project are given.  相似文献   

15.
This paper argues that actions of large-scale mining companies at the early stages of a mining project establish a legacy which sets the tone for that mine's long-term relationship with the local artisanal and small-scale mining (ASM) stakeholders. This paper compares the experiences of Gold Fields' Tarkwa and Damang mines and the divergent histories of each of these mines' relationship with local small-scale mining stakeholders. Circumstances at Damang during the discovery and early development of the project drove a rift between the mine and the ASM community. As the mine developed, a chain of ASM engagement strategies were enacted in an attempted to repair the relationship but which has never able to regain sufficient trust between the mine and ASM stakeholders. At the nearby Tarkwa mine, ASM confrontations have been much easier to manage. Despite early disagreements at Tarkwa, a relationship characterized by greater trust between the mine and ASM communities was established early and therefore ASM engagement strategies have been simpler and more effective. This paper will conclude that establishing and maintaining a positive mine legacy as early as the exploration phase of a mining project is critical to maintaining a positive, trust-based relationship between LSM companies and their local ASM stakeholders over the life of a mine.  相似文献   

16.
This article aims to measure the effects of a flood control project planned for the Chitose River Basin in Hokkaido Prefecture, Japan, using hedonic land price functions. In these functions, "annual expected depth of flood water" is introduced as an explanatory variable to represent the effect of the flood control project. Comparing the approach with the method of "the economic analysis of flood control projects", which has been a conventional evaluation method widely used in Japan, the efficiency and limitations of our approach are discussed.  相似文献   

17.
In water-quality management problems, uncertainties may exist in a number of impact factors and pollution-related processes (e.g., the volume and strength of industrial wastewater and their variations can be presented as random events through identifying a statistical distribution for each source); moreover, nonlinear relationships may exist among many system components (e.g., cost parameters may be functions of wastewater-discharge levels). In this study, an inexact two-stage stochastic quadratic programming (ITQP) method is developed for water-quality management under uncertainty. It is a hybrid of inexact quadratic programming (IQP) and two-stage stochastic programming (TSP) methods. The developed ITQP can handle not only uncertainties expressed as probability distributions and interval values but also nonlinearities in the objective function. It can be used for analyzing various scenarios that are associated with different levels of economic penalties or opportunity losses caused by improper policies. The ITQP is applied to a case of water-quality management to deal with uncertainties presented in terms of probabilities and intervals and to reflect dynamic interactions between pollutant loading and water quality. Interactive and derivative algorithms are employed for solving the ITQP model. The solutions are presented as combinations of deterministic, interval and distributional information, and can thus facilitate communications for different forms of uncertainties. They are helpful for managers in not only making decisions regarding wastewater discharge but also gaining insight into the tradeoff between the system benefit and the environmental requirement.  相似文献   

18.
Cut-off grade is defined as the grade which discriminates between ore and waste within a given orebody. Determination of a complete optimum cut-off grade policy is a very important function during mine life. Using the modified optimum cut-off grade model presented in this paper not only the net present value of a porphyry copper mining project is maximized, but also the adverse environmental impacts of the project are minimized simultaneously. This methodology is more effective in long-range planning. For showing the effectiveness of the model, two scenarios are considered in a hypothetical deposit and the results show that incorporating the modified optimum cut-off grade policy, the net present value will be increased by 3.6% in comparison with the Base Case.  相似文献   

19.
The increasing growth of the economy in each country necessitates a great amount of investment in infrastructure. The belief that projects involve various uncertainties, such as technical skills, management quality, and the like, indicates that most projects fail to achieve their aims, interests, costs, as well as their timeframes and space requirements. As the environment can pose significant uncertainty to any project, environmental risks should be deeply studied by project management departments. This study intends to analyze as a case the environmental risk management system within a consulting firm. From this analysis, each aspect of a project's environmental risk management is ranked using a fuzzy analytical network process (ANP), a neural network algorithm, and a decision‐making trial and evaluation laboratory (DEMATEL) methodology. From the organizational aspect, budget risk is the most significant. From the technical aspect, the risk of regulations is the most important one. Finally, the risk of project failure from poor communication is another identified main risk in this research. By studying high‐ranking items in this hierarchy, it can be understood that these criteria exist in different aspects; therefore, all aspects of the risk should be taken into account to cover and assess risk. A neural network algorithm for validating and reassessment of ranking is employed. Results of this application showed that, based on Spearman's rank correlation method, two different approaches resulted in similar rankings. Finally, some practical implications for responding to the most highly ranked risks are proposed.  相似文献   

20.
杨军  张弛 《四川环境》2003,22(2):74-76
经济效益分析是污染治理工程很重要的一个环节,污染治理工程成功与否关健在经济上是否有效益。本文对铜山县宏发造纸厂的污水治理工程的经济效益进行分析,得知该厂投资治理污染的成本一年内可收回。企业废水治理后达标排放,减少了对周边环境的污染,井取得显著的经济效益和社会效益。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号