首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
An investigation was conducted regarding the potential economic benefits associated with using a wind turbine to power a groundwater circulation well (GCW) at the former Nebraska Ordnance Plant Superfund site. The first phase of the investigation used a 10‐kilowatt‐rated grid inter‐tie wind turbine to partially offset the purchase of electricity from the utility company. The second phase consisted of the conversion of the grid inter‐tie system to an off‐grid system that stored energy using batteries. During the second phase, the GCW system was operated using either wind turbine power or utility power, and the other system components were operated using utility power. The study showed that a significant amount of power purchased from the utility company was used for nonessential purposes (other than operating the GCW pump and essential treatment components). One nonessential power consumer was the continuous heating of the equipment shelter for operator comfort during their 10‐minute visit every few days. Wind‐turbine reduction in utility power consumption was evaluated, and the operating time of a hypothetical system powered solely by the wind turbine was compared to the actual GCW operating time. This study indicates that retrofitting this GCW system did not economically offset power costs from a cheap, readily available grid system. Perhaps at a remote location with a more energy‐efficient design and operation and the inclusion of green power benefits (in some monetary amount), the wind turbine results will be more favorable. The study of a renewable energy application at the site highlighted opportunities for significant electrical energy savings regardless of the source of the electricity. © 2008 Wiley Periodicals, Inc.  相似文献   

2.
Groundwater circulation wells (GCWs) are a quasi‐in‐situ method for remediating groundwater in areas where remediation techniques that limit the water available for municipal, domestic, industrial, or agricultural purposes are inappropriate. The inherently resource‐conservative nature of groundwater circulation wells is also philosophically appealing in today's culture, which is supportive of green technologies. Groundwater circulation wells involve the circulation of groundwater through a dual‐screen well, with treatment occurring between the screens. The wells are specifically designed so that one well screen draws in groundwater and the second returns the groundwater after it has been treated within the well. Historically, the treatment has been performed with specialized equipment proprietary to GCW vendors. Two full‐scale pilot systems at a formerly used Defense Superfund site in Nebraska used best available technologies for treatment components. A multiple‐tray, low‐profile air stripper typically used for pump‐and‐treat remediation systems was successfully adapted for the GCW pilot system located in a trichloroethylene (TCE) hot spot. An ultraviolet water disinfection system was successfully adapted for the GCW pilot system located in a hot spot contaminated with the explosive compound hexhydro‐1,3,5‐trinitro‐1,3,5‐triazine (RDX). The pilot systems showed that GCW technology is competitive with a previously considered pump‐and‐treat alternative for focused extraction, and the regulatory community was supportive of additional GCW applications. A remedial design for the site includes 12 more GCW systems to complete focused remediation requirements. © 2002 Wiley Periodicals, Inc.  相似文献   

3.
When does remediation do more harm than good? After conducting a sustainability analysis on a large pump‐and‐treat site at the Massachusetts Military Reservation (MMR), the Air Force Center for Engineering and the Environment (AFCEE) found evidence suggesting that the remediation systems were creating more pollution than they were remediating. For several years, the AFCEE/MMR has had an aggressive “better, cheaper, faster” optimization program intended to expedite aquifer restoration, reduce costs to the taxpayers, and reduce cleanup time frames. An initial sustainability analysis was conducted in 2005 as part of this program. The analysis identified several concerns, one of which was the indirect generation of air emissions from conventional fossil fuel–based power plants used to power the remediation systems. In addition to the environmental impact of these air emissions, the cost of electricity continues to increase. The AFCEE/MMR evaluated options for addressing both of these concerns and opted to employ renewable energy technology in the form of a utility‐scale wind turbine. This case study presents a more sustainable approach to remediation at the MMR through the use of renewable energy, in the form of a 1,500‐kW wind turbine. Power costs for operating the treatment systems, which processed up to 16 million gallons per day, amounted to over $2.2 million in 2008. The wind turbine is anticipated to reduce the program's electricity costs and offset air emissions, generated indirectly through the use of electricity from fossil fuel–based power plants, by approximately 25 to 30 percent. Based on a range of utility cost projections and an estimate of the turbine's energy production, the $4.6 million project is anticipated to have a payback period between six and eight years. © 2010 Wiley Periodicals, Inc. *
  • 1 This article is a U.S. Government work and, as such, is in the public domain of the United States of America.
  •   相似文献   

    4.
    Directionally drilled horizontal wells offer the opportunity for significant cost savings and technical advantages over alternative trenched well and vertical well soil and groundwater remediation systems in many cases. The magnitude of the cost savings is a function of the remediation technology deployed and the values placed on the reduction of site impacts, dramatic reduction in the time required to achieve site remediation goals and requirements, the ability of horizontal well remediation to easily treat normally recalcitrant contaminants such as MTBE, and the ability to drill under paved areas, operating plants, residential areas, landfills, lagoons, waterways, ponds, basins, and other areas that are normally difficult or impossible to access with conventional drilling or trenching methods. In addition to improvements in site access capabilities, horizontal wells have been found capable of addressing contaminants that vertical wells do not readily treat, even with the same remediation technology deployed, especially if air‐based remediation technologies are deployed. With biosparging, for example, greater treatment capabilities of horizontal wells over vertical wells are attributed to greater oxygen flux over a broader area, a larger treatment zone, and extremely prolonged residence of groundwater contaminants in the aerobic treatment area, typically months or years. This article describes the use of directionally drilled horizontal wells for application of a variety of treatment technologies and includes costs of various options with a detailed comparison of biosparging options. © 2002 Wiley Periodicals, Inc.  相似文献   

    5.
    The former Nebraska Ordnance Plant site in east-central Nebraska was included on the National Priorities List because of explosives and trichloroethene contamination. The preferred groundwater remedy includes hydraulic containment of the contaminated groundwater and focused extraction of the more highly contaminated groundwater as components of the remedial action. The purpose of hydraulic containment is to stop the spread of contamination, while the more aggressive focused extraction will be used to speed up the remediation and reduce total cleanup costs. This case study illustrates how straightforward groundwater models were combined with uncertainty analysis to select a precise definition of the focused extraction areas. The purpose of the analysis was to reduce ultimate remediation costs, given the significant uncertainty associated with the estimated remediation times. The selected definition provides a basis for more sophisticated groundwater modeling, the goal of which was to locate extraction wells and define their flow rates. The batch flushing model provided the governing equations, and Monte Carlo analysis was used for the uncertainty analysis. All of the analysis was performed on a personal computer using commercially available software.  相似文献   

    6.
    A Before‐ After Control‐ Impact Paired (BACIP) model was used to evaluate the effectiveness of phytoremediation treatment on reduction of bentazon concentrations in shallow groundwater at a study site in Louisiana. Two different statistical approaches were made to evaluate the impact to this test site from the remediation program through time. Data were evaluated by Bayesian analysis of variance test methods. Data sets were unique in that the control data used for impact evaluation, as compared to before and after data, were compiled from groundwater upgradient monitoring wells existing prior to remediation. The statistical model supports the hypothesis that the phytoremediation program has positively impacted groundwater at the study site. © 2006 Wiley Periodicals, Inc.  相似文献   

    7.
    A common remedial technology for properties with subsurface soil and groundwater contamination is multiphase extraction (MPE). MPE involves the extraction of contaminated groundwater, free‐floating product, and contaminated soil vapor from the subsurface. A network of recovery wells conveys fluids to a vacuum pump and to the treatment system for the contaminated groundwater and soil vapor. This article describes a study of MPE operational data from nine similar remediation projects to determine the most important design parameters. Design equations from guidance manuals were used to estimate the expected radius of influence (ROI) based on measured field data. ROIs were calculated for the vapor flow rate through the subsurface and for the groundwater drawdown caused by the MPE remediation activities. The calculated ROIs were compared to the measured ROIs to corroborate the assumptions made in the calculations. Once it was established that the calculated and field‐measured ROIs were comparable, a sensitivity analysis determined ranges of different design and operational parameters that most affected the ROIs. © 2012 Wiley Periodicals, Inc.  相似文献   

    8.
    The Air Force Center for Engineering and the Environment (AFCEE) is performing Environmental Restoration Program Optimization (E‐RPO) at various United States Air Force (USAF) installations to evaluate existing remediation strategies and recommend actions to advance issues impacting the remediation program. As sustainability practices (including green and sustainable remediation [GSR]) increase at Air Force facilities and throughout the environmental industry, the use of alternative energy‐collection sources (i.e., solar photovoltaics [PV] and wind turbines) is likely to increase dramatically. Although PV and wind power systems exhibit a low environmental footprint during their use, there are potential human health and environmental impacts from the manufacturing and recycling processes. This article presents a summary of available information regarding the environmental impacts associated with life‐cycle assessments that include raw material extraction and refinement, product manufacturing, use, and postuse disposal for PV and wind turbines (i.e., cradle‐to‐grave impacts). © 2010 Wiley Periodicals, Inc.  相似文献   

    9.
    In 1993 environmental consultants, working in concert with the State of Michigan, discovered groundwater contamination that threatened the drinking water supply of the town of Big Rapids. The contamination originated from leaking underground storage tanks and gasoline lines, which were removed. A pilot study indicated the contaminated area extended to 240′ x 180′ and affected soil as well as groundwater. A remediation plan was designed by and implemented by Continental Remediation Systems, Inc., a Natick, Massachusetts, firm. The remediation plan is ongoing and includes an interceptor trench to stop gasoline from flowing into the creek, as well as air sparging to vent and treat the contaminated soil. It is anticipated that the remediation project will take six months to complete. The chief advantage of on-site remediation is that it avoids the costs and liabilities associated with landfill disposal and no materials need leave the site.  相似文献   

    10.
    A common industrial solvent additive is 1,4‐dioxane. Contamination of dissolved 1,4‐dioxane in groundwater has been found to be recalcitrant to removal by conventional, low‐cost remedial technologies. Only costly labor and energy‐intensive pump‐and‐treat remedial options have been shown to be effective remedies. However, the capital and extended operation and maintenance costs render pump‐and‐treat technologies economically unfeasible at many sites. Furthermore, pump‐and‐treat approaches at remediation sites have frequently been proven over time to merely achieve containment rather than site closure. A major manufacturer in North Carolina was faced with the challenge of cleaning up 1,4‐dioxane and volatile organic compound–impacted soil and groundwater at its site. Significant costs associated with the application of conventional approaches to treating 1,4‐dioxane in groundwater led to an alternative analysis of emerging technologies. As a result of the success of the Accelerated Remediation Technologies, LLC (ART) In‐Well Technology at other sites impacted with recalcitrant compounds such as methyl tertiarybutyl ether, and the demonstrated success of efficient mass removal, an ART pilot test was conducted. The ART Technology combines in situ air stripping, air sparging, soil vapor extraction, enhanced bioremediation/oxidation, and dynamic subsurface groundwater circulation. Monitoring results from the pilot test show that 1,4‐dioxane concentrations were reduced by up to 90 percent in monitoring wells within 90 days. The removal rate of chlorinated compounds from one ART well exceeded the removal achieved by the multipoint soil vapor extraction/air sparging system by more than 80 times. © 2005 Wiley Periodicals, Inc.  相似文献   

    11.
    An efficient program for assessing groundwater extraction system capture zones has been developed that can be run on any digitized potentiometric surface. The program was developed in response to the need to simulate particle capture by multiple remediation system elements (i.e., extraction wells, hydraulic barrier, etc.) at a hydrogeologically complex site in California (the Site). The method uses MODPATH software but does not otherwise require a groundwater model. The program called “CapZone FileBuilder” (Capture Zone File Builder) Version 1.0 was created to import digitized potentiometric surfaces and use them to create MODFLOW output files (using native USGS MODFLOW‐2005 codes). CapZone FileBuilder was created using the C# programming language with Visual Studio 2013 as the integrated development environment. The model was applied to a site that has a regulatory requirement for capture analysis as part of an annual remedy‐effectiveness evaluation for groundwater contamination. Previously, capture analysis was highly labor intensive and time consuming, performed using manual flow net analysis or calibration of highly discretized MODFLOW groundwater models. CapZone FileBuilder is now used to perform the capture analysis for this site and is universally applicable to any site with a groundwater potentiometric map. ©2017 Wiley Periodicals, Inc.  相似文献   

    12.
    In response to an oxygenated gasoline release at a gas station site in New Hampshire, a temporary treatment system consisting of a single bedrock extraction well, a product recovery pump, an air stripper, and carbon polishing units was installed. However, this system was ineffective at removing tertiary butyl alcohol from groundwater. The subsequent remedial system design featured multiple bedrock extraction wells and an ex situ treatment system that included an air stripper, a fluidized bed bioreactor, and carbon polishing units. Treated effluent was initially discharged to surface water. Periodic evaluation of the remediation system performance led to system modifications, which included installing an additional extraction well to draw contaminated groundwater away from an on‐site water supply well, adding an iron and manganese pretreatment system, and discharge of treated effluent to an on‐site drywell. Later, the air stripper and carbon units were eliminated, and an infiltration gallery was installed to receive treated, oxygenated effluent in order to promote flushing of the smear zone and in situ bioremediation in the source area. This article discusses the design, operation, performance, and modifications to the remediation system over time, and provides recommendations for similar sites. © 2007 Wiley Periodicals, Inc.  相似文献   

    13.
    Rapid groundwater fluxes often influence subsurface temperature distributions during in situ thermal remediation using electrothermal or conduction heating technologies. This study used a numerical approach to evaluate the impact of groundwater flow on electrothermal heating, as well as the effectiveness of several upgradient heat loss management strategies, in a hypothetical treatment volume. Design alternatives using upgradient (i) hydraulic barriers, (ii) physical barriers, and (iii) increased energy input are evaluated. Results indicate that target temperatures can be achieved, despite the presence of local groundwater flow velocities greater than 0.3 m/day, through the careful design and implementation of the alternatives evaluated. However, physical barriers need to be designed to prevent groundwater flow through the heated volume to be effective. Field data from an electrothermal application are also presented, where boiling temperatures were achieved after steam injection and upgradient pumping wells were implemented.  相似文献   

    14.
    In 1981, the Arizona Department of Health Services (ADHS) discovered groundwater contamination by solvents and chromium at the Phoenix Goodyear Airport (PGA), just outside the city of Phoenix. ADHS and the U.S. EPA sampled the site for the next two years, finding that eighteen of their wells were contaminated with trichloroethene (TCE), six exceeding ADHS's action level of five micrograms per liter (μg/l). In 1983, the PGA site was added to the National Priorities List, and, in 1984, EPA began a $3 million remedial investigation, focusing on soils and groundwater. This article discusses how that investigation inspired the authors to develop a stream-lined evaluation method for PGA's volatile organic compounds (VOCs), the process for establishing VOC cleanup levels, and the $26 million of remediation work needed to be done at the site. The heart of this effort is a computer program called VLEACH, loosely standing for VOC-LEACHing, which anticipates the influence of VOCs on PGA's groundwater, even as remediation proceeds.  相似文献   

    15.
    This study demonstrates a remedial approach for completing the remediation of an aquifer contaminated with 1,1,2‐trichlorotrifluoroethane (Freon‐113) and 1,1,1‐trichloroethane (TCA). In 1987, approximately 13,000 pounds of Freon‐113 were spilled from a tank at an industrial facility located in the state of New York. The groundwater remediation program consisted of an extraction system coupled with airstripping followed by natural attenuation of residual contaminants. In the first phase, five recovery wells and an airstripping tower were operational from April 1993 to August 1999. During this time period over 10,000 pounds of CFC‐13 and 200 pounds of TCA were removed from the groundwater and the contaminant concentrations decreased by several orders of magnitude. However, the efficiency of the remediation system to recover residual Freon and/or TCA reduced significantly. This was evidenced by: (1) low levels (< 10 ppb) of Freon and TCA captured in the extraction wells and (2) a slight increase of Freon and/or TCA in off‐site monitoring wells. A detailed study was conducted to evaluate the alternative for the second‐phase remediation. Results of a two‐year groundwater monitoring program indicated the contaminant plume to be stable with no significant increase or decrease in contaminant concentrations. Monitored geochemical parameters suggest that biodegradation does not influence the fate and transport of these contaminants, but other mechanisms of natural attenuation (primarily sorption and dilution) appear to control the fate and transport of these contaminants. The contaminants appear to be bound to the soil matrix (silty and clay units) with limited desorption as indicated by the solid phase analyses of contaminant concentrations. Results of fate and transport modeling indicated that contaminant concentrations would not exceed the action levels in the wells that showed a slight increase in contaminant concentrations and in the downgradient wells (sentinel) during the modeled timeframe of 30 years. This feasibility study for natural attenuation led to the termination of the extraction system and a transaction of the property, resulting in a significant financial benefit for the original site owner. © 2003 Wiley Periodicals, Inc.  相似文献   

    16.
    In the early 1990s, a soil removal action was completed at a former disposal pit site located in southern Michigan. This action removed waste oil, cutting oil, and chlorinated solvents from the unsaturated zone. To contain groundwater contaminant migration at the site, a groundwater pump‐and‐treat system comprised of two extraction wells operating at a combined flow of 50 gallons per minute, carbon treatment, and a permitted effluent discharge was designed, installed, and operated for over 10 years. Groundwater monitoring for natural attenuation parameters and contaminant attenuation modeling demonstrated natural attenuation of the contaminant plume was adequate to attain site closure. As a result of incomplete contaminant source removal, a rebound of contaminants above the levels established in the remedial action plan (RAP) has occurred in the years following system shutdown and site closure. Groundwater concentrations have raised concerns regarding potential indoor air quality at adjacent residential properties constructed in the past 9 to 10 years. The only remedial option available in the original RAP is to resume groundwater pump‐and‐treat. To remediate the source area, an alternate remediation strategy using an ozone sparge system was developed. The ozone sparge remediation strategy addresses the residual saturated zone contaminants beneath the former disposal pit and reestablishes site closure requirements without resumption of the pump‐and‐treat system. A pilot study was completed successfully; and the final system design was subsequently approved by the Michigan Department of Environmental Quality. The system was installed and began operations in July 2010. As of the January 2011 monitoring event, the system has shown dramatic improvement in site contaminant concentrations. The system will continue to operate until monitoring results indicate that complete treatment has been obtained. The site will have achieved the RAP objectives when the system has been shut down and meets groundwater residential criteria for four consecutive quarters. © 2011 Wiley Periodicals, Inc.  相似文献   

    17.
    Natural remediation is moving toward the forefront as engineers clean groundwater at the Savannah River Site (SRS), a major Department of Energy (DOE) installation near Aiken, South Carolina. This article reviews two successful, innovative remediation methods currently being deployed: biosparging to treat chlorinated solvents and phytoremediation to address tritium in groundwater. The biosparging system reintroduces oxygen into the groundwater and injects nutrient compounds for in‐situ remediation. The system has greatly reduced the concentrations of trichloroethylene (TCE) and vinyl chloride in wells downgradient from a sanitary landfill (SLF). Phytoremediation is an emerging technology that promises effective and inexpensive cleanup of certain hazardous wastes. Using natural processes, plants can break down, trap and hold, or transpire contaminants. This article discusses the use of phytoremediation to reduce the discharge of tritium to an on‐site stream at SRS. © 2002 Wiley Periodicals Inc. *  相似文献   

    18.
    A common technology to remediate and/or contain contaminated groundwater is pump‐and‐treat remediation (P&T). Traditionally, P&T systems have been designed to operate continuously to achieve steady‐state capture zones, for which large amounts of energy are required. Green and sustainable remediation (GSR) is emerging as a viable method to minimize the adverse effects of remediation on the environment. One of the challenges associated with photovoltaic‐ (PV‐) powered P&T systems is the assessment of their performance given the intermittent nature of the power availability. This article characterizes the hydraulic containment effectiveness of a PV‐powered P&T system without energy storage using data collected at two different remediation sites, a Dry‐Cleaning Environmental Response Trust Fund site in Rolla, Missouri, and the Former Nebraska Ordnance Plant near Mead, Nebraska. Additionally, a method to estimate the effectiveness of the hydraulic containment as a function of the total volume of groundwater expected to be extracted is being proposed. Two transient and a continuously pumped capture zones were modeled using Visual MODFLOW® 2012.1 along with MODPATH and compared. The study shows that smaller capture zones will be generated from intermittent pumping when compared to continuous pumping. © 2013 Wiley Periodicals, Inc.  相似文献   

    19.
    The traditional approach to characterizing the extent of groundwater contamination is often phased over a period of several years. A screening method has been developed that allows the investigation process to be reduced to a single phase. Existing data are used to develop a preliminary estimate of the extent of contamination, which is refined by the screening method using groundwater data collected and analyzed in the field. The screening method is applicable at sites with volatile organic compound contamination. Groundwater samples are collected using direct push or drill rig assisted methods, and the groundwater headspace gas is analyzed for the contaminant of interest. The refined estimate is used to locate all of the groundwater monitoring wells necessary to finalize the estimate of the extent of contamination. Therefore, only one investigation phase is required, and time and cost savings are realized with respect to the traditional multiphase approach. The screening method was successfully applied at a CERCLA site in Nebraska with two distinct plumes of TCE-contaminated groundwater. The Nebraska remedial investigation was completed approximately 18 months earlier than the estimated completion of a comparable phased investigation, with a corresponding cost reduction estimated at approximately 10 percent. If data from the screening method were used instead of data from monitoring wells, the estimated cost savings would be over 50 percent. Additional applications and evaluations may lead to industry and regulatory acceptance of the method as a primary characterization tool.  相似文献   

    20.
    The continuous and discontinuous release of petroleum hydrocarbons from an oil refinery in Alaska resulted in the contamination of an unconfined glacial outwash aquifer. Geologic conditions at the site allowed for the vertical migration of hydrocarbon product to the water table and subsequent formation of an areally extensive floating product layer. Since the petroleum hydrocarbon phase would provide a major source of BTX (benzene, toluene, xylene) contamination to the groundwater, interim product and groundwater recovery measures were initiated to limit aquifer degradation. Phase I remedial activities involved the operation of nine well pairs, with one well used for groundwater extraction and the other for product recovery. Phases II and III involved expansion of the recovery well network and use of a two-pump system. Petroleum product recovered was reprocessed at the refinery. Contaminated groundwater was initially treated using the refinery's wastewater treatment system, but treatment inefficiencies and continued system expansion necessitated use of a separate treatment unit. Performance evaluations indicate that the remedial phases have been successful in halting further contaminant migration and in recovering a significant volume of the released petroleum hydrocarbons.  相似文献   

    设为首页 | 免责声明 | 关于勤云 | 加入收藏

    Copyright©北京勤云科技发展有限公司  京ICP备09084417号