首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Sedimentation is emerging as a key issue in sustainable reservoir management. One approach to controlling reservoir sedimentation is to trap sediment in hydraulic structures upstream of the reservoir. In the 1,163‐km2 catchment of the Dahan River (Taiwan) over 120 “sabo” dams were built to reduce sediment yield to Shihmen Reservoir. Built in 1963 for water supply, Shihmen has lost over 40% of its 290‐Mm3 storage capacity to sedimentation. Most of these upstream structures were small, but three had capacities >9 Mm3. Field measurements and historical data from the Water Resources Agency show most smaller dams had filled with sediment by 1976. The three largest were full or nearly so by 2007, when one (Barlin Dam) failed, releasing a pulse of 7.5 Mm3, most of its 10.4 Mm3 stored sediment downstream. The Central Range of Taiwan is rapidly eroding (denudation rates 3‐6 mm/yr), so geologically high loads make sediment problems manifest sooner. Even in other environments, however, eventually small dams built upstream of large reservoirs are likely to fill themselves, creating multiple small sediment‐filled reservoirs, some located in sites inaccessible to mechanical removal. Our analysis suggests sabo dams do not offer a long‐term basis for controlling reservoir sedimentation in such a high‐sediment yield environment. Sustainable solutions must somehow pass sediment downstream, as would be accomplished by a sediment bypass around Shihmen Reservoir, as now being studied.  相似文献   

2.
A new method for numerically predicting the total sediment load in a river is proposed. The method can be used to predict the total sediment load with information on channel geometry and slope, flow, and bed materials. The conventional method uses a 1D approach that assumes the channel has a wide rectangular shape. However, the proposed method computes depth‐averaged velocity over the width and predicts the total sediment load based on the flow computations. The new method, therefore, is expected to predict better if the flow changes significantly in the lateral direction. The proposed method was applied to three large sand‐bed rivers in Korea, where information is available regarding suspended sediment. Five formulas were tested of use in making total sediment load computations, namely Engelund‐Hansen's, Ackers‐White's, Yang's, Brownlie's, and Karim's formulas. The predicted total sediment loads are compared not only with measured data but also with results calculated using the 1D approach. Discrepancy ratios between the predicted and measured total sediment loads are given and the results are discussed.  相似文献   

3.
ABSTRACT: The total suspended sediment loads of four north Mississippi reservoirs were determined from measurements of concentrations of suspended sediment in a vertical profile at several locations on each reservoir made during the year. These data were combined with the stage-height and known stage-volume relationships for each reservoir in a numerical integration to determine the total suspended sediment in the water body. Total suspended sediments were estimated using the product of the suspended sediment concentration in the surface water by the appropriate reservoir volume. The averaged ratios of the estimated to measured suspended sediment loads for each reservoir exceeded 0.90. Since the concentration of suspended sediments in surface waters of north Mississippi reservoirs has been shown as highly correlated with spectral reflectance, estimating the total suspended sediment of these reservoirs using remotely sensed spectral reflectance data is possible.  相似文献   

4.
5.
ABSTRACT: Long-term land use and reservoir sedimentation were quantified and linked in a small agricultural reservoir-watershed system without having historical data. Land use was determined from a time sequence of aerial photographs, and reservoir sedimentation was determined from cores with 137Cs dating techniques. They were linked by relating sediment deposition to potential sediment production which was determined by the Universal Soil Loss Equation and by SCS estimates for gullied land. Sediment cores were collected from Tecumseh Lake, a 55-ha reservoir with a 1,189-ha agricultural watershed, constructed in 1934 in central Oklahoma. Reservoir sediment deposition decreased from an average of 5,933 Mg/yr from 1934 to 1954, to 3,179 Mg/yr from 1954 to 1962, and finally to 1,017 Mg/yr from 1962 to 1987. Potential sediment production decreased from an average of 29,892 to 11,122 and then to 3,589 Mg/yr for the same time periods as above, respectively. Reductions in deposition and sediment production corresponded to reductions in cultivated and abandoned cropland which became perennial pasture. Together, cultivated and abandoned cropland accounted for 59 percent of the watershed in 1937, 24 percent in 1954, and 10 percent in 1962. Roadway erosion, stream bank erosion, stored stream channel sediment, and long-term precipitation were considered, but none seemed to play a significant role in changing sediment deposition rates. Instead, the dominant factor was the conversion of fields to perennial pastures. The effect of conservation measures on reservoir sedimentation can now be quantified for many reservoirs where historical data is not available.  相似文献   

6.
7.
ABSTRACT: Since the majority of road drainage points in western Washington and Oregon enter small, often ephemeral streams rather than large, fish-bearing waters, impact of road-surface sediment on biota in permanent streams depends, to a large extent, on transport through these small watercourses. A series of experimental additions of road-surface sediment was made to two ephemeral streams to examine the downstream transport of this material as a function of discharge and channel characteristics. These small streams were found to store large amounts of sediment washed from road surface. In no instance did either stream transport more than 45 percent of the added material to their mouths, distances of 95 and 125 m. Larger-sized sediment particles were delivered at a lower rate than finer material. Added sediment <0.063 mm in size was transported efficiently through the systems at all but the lowest flows tested. Material between 0.5 and 0.063 mm and from 2.0 to 0.5 mm in size were retained at progressively higher rates, with sediment in the coarser size category never exceeding a delivery of 10 percent of the added material. There were significant differences in the transport of sediment in the two larger size categories between the two streams. These differences were due to a much greater amount of woody debris in the stream with the lower delivery rates, which acted to trap and hold sediment, as well as a slightly longer and less steep channel.  相似文献   

8.
ABSTRACT: Reservoirs, as well as lakes and estuaries, are subject to sediment accumulation. The rate at which sedimentation occurs is accelerated or diminished by man's activities. Acceptable rates of sedimentation are considered on the basis of costs of sediment storage and removal and a review of reservoirs constructed with sediment removal capabilities is given. The rates of reservoir sedimentation in the United States are summarized based on reliable data obtained from all sizes of reservoirs. Problems confronting the engineer concerning reservoir construction and maintenance are discussed on the basis of these data.  相似文献   

9.
ABSTRACT: An optimal control methodology and computational model are developed to evaluate multi‐reservoir release schedules that minimize sediment scour and deposition in rivers and reservoirs. The sedimentation problem is formulated within a discrete‐time optimal control framework in which reservoir releases represent control variables and reservoir bed elevations, storage levels, and river bed elevations represent state variables. Constraints imposed on reservoir storage levels and releases are accommodated using a penalty function method. The optimal control model consists of two interfaced components: a one‐dimensional finite‐difference simulation module used to evaluate flow hydraulics and sediment transport dynamics, and a successive approximation linear quadratic regulator (SALQR) optimization algorithm used to update reservoir release policies and solve the augmented control problem. Hypothetical two‐reservoir and five‐reservoir networks are used to demonstrate the methodology and its capabilities, which is a vital phase towards the development of a more robust optimal control model and application to an existing multiple‐reservoir river network.  相似文献   

10.
ABSTRACT: One-dimensional and two-dimensional modeling approaches were compared for their abilities in predicting overland runoff and sediment transport. Both 1-D and 2-D models were developed to test the hypothesis that the 2-D modeling approach could improve the model predictions over the 1-P approach, based on the same mathematical representations of physical processes for runoff and sediment transport. The models developed in this study were applied to overland areas with cross slopes. A hypothetical case and an experimental study reported by Storm (1991) were used. Based on the simulation results from the selected hypothetical case and experimental study, the 2-D model provided better representation of spatial distribution of flow depths and sediment concentrations than the 1-D model. However, no significant differences in predictions of total runoff volume and sediment yield at the outlet area were found between the 1-D and 2-D models.  相似文献   

11.
ABSTRACT: The RIVMOD hydrodynamic model was used to route upstream flows through a 115 km section of the Carson River and Lahontan Reservoir, Nevada. RIVMOD results will later be used to predict sediment movement and ultimately to determine mercury transport within the river/reservoir system. Significant modifications to the model computer code were necessary to represent the narrow, steeply sloping rectangular channel and relatively shallow sloping floodplain of the Carson River and its confluence with the Lahontan Reservoir. These changes include expansion of the continuity and momentum equations to account for rapidly changing channel widths along with the characterization of a complex cross-sectional shape. This modified version of the RIVMOD model can handle shallower side slopes and much more severe flood flow simulations than the original version. A 0.25 km spatial increment was required in the zone of confluence between the river and reservoir. Model predictions show excellent agreement with observed downstream flow and reservoir stage for the entire 1986 water year, which includes one of the most severe flood events of recent record. (KEY TERMS: hydraulics; modeling; simulation; surface water hydrology.)  相似文献   

12.
Bedload transport was measured with two sampler types (vortex tube and Helley-Smith pressure differential) for three major storms at Flynn Creek, which drains a 2.2-km2 forested watershed in the Oregon Coast Range. The largest flow during two winters of monitoring had a peak discharge of 0.79 m3 s-1 km-2, with an associated recurrence interval of ? 1.3 yr. The median particle diameter of sediment in transport was generally < 1 mm. The vortex tube and its associated sample box were relatively inefficient at trapping particles < 10 mm in diameter; however, even after transport rates were adjusted to account for sampling deficiencies of the sample box, they still averaged 42–47 percent of those obtained with the Helley-Smith sampler. Organic matter and sand sized sediments in transport also were observed to partially plug the 0.2-mm-mesh bag of the Helley-Smith sampler. Large temporal variability in bedload transport rates was measured during periods of high flow.  相似文献   

13.
ABSTRACT: The dam impounding White Rock Lake was completed in 1910 to provide water for the City of Dallas. Since then, land use on the watershed has changed from entirely rural to over 77 percent urban. A model called SWRRB (Simulator for Water Resources in Rural Basins) was utilized to determine the effect of urbanization on water and sediment entering the lake. The simulation results show that, if urbanization had not occurred, then the annual surface runoff would be 135 mm rather than 151 mm and the annual sediment yield would be 4.4 t/ha rather than 4.1 t/ha. Also, the effect of urbanization on delivery ratios was shown and a positive linear correlation was found. Finally, the weather generator in SWRRB was utilized to estimate the loss of reservoir capacity until 2050 for three different land use management scenarios.  相似文献   

14.
ABSTRACT: Hydrologic responses to logging with skidders and responses to logging with a cable yarder are compared. After a 23-year calibration with an undisturbed control catchment, mixed stands of shortleaf pine (Pinus echinata Mill.) and hardwoods were clearfelled on two small catchments in the hilly Coastal Plain of north Mississippi and observed for five years. Runoff increased 370 mm (skidded) and 116 mm (yarded) during the first year with 1876 mm of rainfall, and 234 mm (skidded) and 228 mm (yarded) during the second year when 1388 mm of precipitation equaled the calibration mean. Sediment concentrations for the yarded catchment during the first two years averaged 641 and 1,629 mg L?1, respectively, and yields were 6,502 and 12,086 kg ha?1. Compared to calibration means of 74 mg L?1 and 142 kg ha?1, these extreme values can be attributed largely to transport of sediment stored in the channel and to erosion of subsurface flow paths, which was exacerbated by high flow volumes. During the first year, the concentration (231 mg L?1) and yield (2,827 kg ha?1) for the control catchment also exceeded the calibration means. However, concentrations (134 mg L?1) and yields (1,806 kg ha?1) for the skidded catchment were about 40 percent lower than for the control catchment during the first year, and were higher than those for the control only during the second year. Because deep percolation was limited and because rainfall was unusually high, increases in flows and sediment concentrations and yields probably approximate maximum responses to clearcut harvesting in the uplands of the southern Coastal Plain.  相似文献   

15.
ABSTRACT: Delivery of sediment and particulate pollutants from diffuse sources is shown to be related to the loss of sediment carrying energy of runoff during the overland flow phase. The loss is caused by the termination of rainfall and by reduction of flow energy during the recession phase of the overland flow hydrograph. It has been demonstrated both by theoretical analyses and experimental measurements that the saturated sediment concentration in overland flow is a function of rainfall erosivity and the runoff flow rate. The hypotheses were verified by field measurements from a small homogeneous watershed.  相似文献   

16.
ABSTRACT: The magnitudes and patterns of sediment resuspension are assessed in Cannonsville Reservoir, New York, to quantify and characterize this internal source of sediment. The assessment is based on analyses of sediment trap collections from 10 sites over the spring to fall interval of two years. Temporal and spatial patterns in sediment deposition are demonstrated to be driven by resuspension/redeposition processes. Sediment that had been resuspended and redeposited represented 80 to 96 percent, on average, of the depositing solids collected along the main axis of the lake. About 90 percent of the redeposited sediment was inorganic. Increased resuspension caused by drawdown of the reservoir surface and fall turnover resulted in 10 to 50‐fold increases in deposition rates compared to levels observed when the reservoir was full and strongly thermally stratified. Elevated levels of redeposition from resuspension in the reservoir have been driven by both higher water column concentrations of suspended solids and settling velocities. Recurring longitudinal and lateral gradients in resuspension are delineated, establishing that resuspended solids are transported from the riverine to the lacustrine zone and from near‐shore to pelagic areas. Resuspension is demonstrated to cause increases in inanimate particle (tripton) concentrations. Higher tripton levels have been observed in years with greater drawdown. Water quality impacts of the resuspension phenomenon are considered.  相似文献   

17.
ABSTRACT: A meandering stream channel was simulated in the Hydraulics Laboratory at Colorado State University and a series of tests was conducted using four types of vegetation to evaluate the potential effects of vegetation on sediment deposition and retention in a stream channel. The data collected included average flow velocity, flow depth, length of vegetation, density of vegetation, cross-sectional area of the vegetative stem, wetted perimeter of the vegetative stem, and injection and flushing time. The findings indicated that the vegetation could retain from 30 to 70 percent of the deposited sediments. The ability of vegetation to entrap and retain sediment is related to the length and cross-sectional area of the vegetation. The variables describing the flow and the vegetative properties were combined to form a predictive parameter, the sedimentation factor (Sd) that can be compared with the amount of sediment entrapped by vegetation in a stream system. A relation was developed correlating vegetation length to sediment retention after flushing for flexibility and rigid vegetation.  相似文献   

18.
ABSTRACT: A new method has been developed for estimating future reservoir storage capacities, allowing for sediment deposition and compaction. Reservoir sedimentation surveys for 117 reservoirs, conducted by the Illinois State Water Survey over the past 60 years, were used to determine regional constants K to represent the severity of sediment deposition in the reservoirs. More than half of the 82 water supply reservoirs investigated had records of reservoir sedimentation surveys, and their K values were calculated by using data from those sediment surveys. The average K values of the remaining non-surveyed water supply reservoirs were estimated from the regional distribution of the K values. Other important factors considered in the estimation of future reservoir storage capacities are the trap efficiency of the reservoirs and the variation of density of sediment deposits due to compaction. The model can also be used for analyzing the economics of alternative sites and of design features that can be incorporated in dams for reducing reservoir sedimentation.  相似文献   

19.
ABSTRACT: This study employs a simple nonlinear statistical approach to establish nitrogen, phosphorus, and sediment concentration and unit area load thresholds to aid in the evaluation of aquatic biological health of watersheds within the state of Pennsylvania. Flow, nitrogen and phosphorus species, sediment, basin area, land cover, and biological assessment data were assembled for 29 Pennsylvania watersheds. For each watershed, rating curves depicting flow versus load relationships were developed using the U.S. Environmental Protection Agency's (USEPA's) storage and retrieval database (STORET) flow and concentration data, then applied to daily flow data obtained from U.S. Geological Survey (USGS) daily flow gauging stations to estimate daily load between 1989 and 1999. The load estimates and concentration data were then sorted into six sets of data: mean annual unit area nitrogen, phosphorus, and sediment loads; and average nitrogen, phosphorus, and sediment concentrations. Results of Mann‐Whitney tests conducted on each of the six datasets indicate that there is a statistically significant difference between the concentrations and unit area loads of nitrogen, phosphorus, and sediment in impaired and unimpaired watersheds. Concentration thresholds, calculated as the midpoint between the impaired and unimpaired watersheds’ 95 percent confidence interval for the median, were estimated to be 2.01 mg/L, 0.07 mg/L, and 197.27 mg/L for nitrogen, phosphorus, and sediment, respectively. Annual unit area load thresholds were estimated to be equal to 8.64 kg/ha, 0.30 kg/ha, and 785.29 kg/ha, respectively, for nitrogen, phosphorus, and sediment species.  相似文献   

20.
An erosion and sediment transport component incorporated in the HYdrology Simulation using Time‐ARea method (HYSTAR) upland watershed model provides grid‐based prediction of erosion, transport and deposition of sediment in a dynamic, continuous, and fully distributed framework. The model represents the spatiotemporally varied flow in sediment transport simulation by coupling the time‐area routing method and sediment transport capacity approach within a grid‐based spatial data model. This avoids the common, and simplistic, approach of using the Universal Soil Loss Equation (USLE) to estimate erosion rates with a delivery ratio to relate gross soil erosion to sediment yield of a watershed, while enabling us to simulate two‐dimensional sediment transport processes without the complexity of numerical solution of the partial differential governing equations. In using the time‐area method for routing sediment, the model offers a novel alternative to watershed‐scale sediment transport simulation that provides detailed spatial representation. In predicting four‐year sediment hydrographs of a watershed in Virginia, the model provided good performance with R2 of 0.82 and 0.78 and relative error of ?35% and 11% using the Yalin and Yang's sediment transport capacity equations, respectively. Prediction of spatiotemporal variation in sediment transport processes was evaluated using maps of sediment transport rates, concentrations, and erosion and deposition mass, which compare well with expected behavior of flow hydraulics and sediment transport processes.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号