首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
Impact significance determination is widely recognized as a vital and critical EIA activity. But impact significance related concepts are poorly understood. And the quality of approaches for impact significance determination in EIA practice remains highly variable. This article seeks to help establish a sound and practical conceptual foundation for formulating and evaluating impact significance determination approaches.It addresses the nature (what is impact significance?), the core characteristics (what are the major properties of significance determination?), the rationale (why are impact significance determinations necessary?), the procedural and substantive objectives (what do impact significance determinations seek to achieve?), and the process for making impact significance judgments (how is impact significance determination conducted?). By identifying fundamental attributes and key distinctions associated with impact significance determinations, a basis is provided for designing and evaluating impact significance determination procedures at both the regulatory and applied levels.  相似文献   

2.
3.
The question of how best to go about determining the significance of impacts has, to date, only been addressed in a partial and preliminary way. The assumption tends to be made that it is either only necessary to provide explicit, justified reasons for a judgment about significance and/or to explicitly apply a prescribed procedure—a procedure usually involving the staged application of thresholds and/or criteria. The detailed attributes, strengths and limitations of such approaches and possible alternative approaches have yet to be explored systematically.This article addresses these deficiencies by analyzing the characteristics, specific methods and positive and negative tendencies of three general impact significance determination approaches—the technical approach, the collaborative approach and the reasoned argumentation approach. A range of potential composite approaches are also described. With an enhanced understanding of these approaches, together with potential combinations, EIA practitioners and other EIA participants can be in a better position to select an approach appropriate to their needs, to reinforce the positive tendencies and offset the negative tendencies of the selected approach and to combine the best qualities of more than one approach.  相似文献   

4.
This study evaluates and contrasts the management practice and the performance that characterise Environmental Impact Assessments (EIA) in Italy and in the UK. The methodology relies on the investigation of six carefully selected case studies, critically reviewed by referring to EIA and project design information, as well as collecting the opinion of key project participants. The study focuses on the construction industry and on specific key sectors like infrastructure for transport and renewable energy and commercial and tourism development. A main term of reference for the analyses has been established by critically reviewing international literature so as to outline common good practice, requirements for the enhancement of sustainability principles and typically incurred drawbacks. The proposed approach enhances transfer of knowledge and of experiences between the analyzed contexts and allows the provision of guidelines for practitioners. Distinctive differences between the UK and the Italian EIA systems have been detected for pivotal phases and elements of EIA, like screening, scoping, analysis of alternatives and of potential impacts, definition of mitigation strategies, review, decision making, public participation and follow up.  相似文献   

5.
The use of economic valuation methods to assess environmental impacts of projects and policies has grown considerably in recent years. However, environmental valuation appears to have developed independently of regulations and practice of environmental impact assessment (EIA), despite its potential benefits to the EIA process. Environmental valuation may be useful in judging significance of impacts, determining mitigation level, comparing alternatives and generally enabling a more objective analysis of tradeoffs. In China, laws and regulations require the use of environmental valuation in EIA, but current practice lags far behind. This paper assesses the problems and prospects of introducing environmental valuation into the EIA process in China. We conduct four case studies of environmental economic impact assessment (EEIA), three of which are based on environmental impact statements of construction projects (a power plant, a wastewater treatment plant and a road construction project) and one for a regional pollution problem (wastewater irrigation). The paper demonstrates the potential usefulness of environmental valuation but also discusses several challenges to the introduction and wider use of EEIA, many of which are likely to be of relevance far beyond the Chinese context. The paper closes with suggesting some initial core elements of an EEIA guideline.  相似文献   

6.
Land take is emerging as a global environmental concern, and is particularly critical in intensively developed and land-scarce regions. This paper seeks to understand the effectiveness of the screening stage of Environmental Impact Assessment (EIA) in addressing land take. Screening is the stage where a decision is made as to whether an EIA is required for a project. In many jurisdictions, screening results in three pathways: full EIA directly, preliminary EIA only, or preliminary EIA followed by full EIA. We compared the land take of 217 projects triggering the different pathways in a study region in Italy over a 15-year time interval. Land take was quantified by overlaying the footprint of the projects with a land cover map.The results show that while more attention was given to projects with larger land take impacts overall, the cumulative land take from smaller projects not triggering full EIA was considerable (40% of overall land take). The case-by-case examination conducted through the preliminary EIA was found to work better for some project types (ski areas and small urban development), than for others (quarries). Our findings lead us to advocate improvements in current screening procedures to ensure that the land take impacts are quantified and made explicit in preliminary EIA reports. Our evidence-based approach to determining land take in EIA provides a compelling basis for understanding ways to improve EIA policies, guidance and practice.  相似文献   

7.
In the last twenty years, both the increase in academic production and the expansion of professional involvement in Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) have evidenced growing scientific and business interest in risk and impact analysis. However, this growth has not brought with it parallel progress in addressing the main shortcomings of EIA/SIA, i.e. insufficient integration of environmental and social factors into development project analyses and, in cases where the social aspects are considered, technical-methodological failings in their analysis and assessment. It is clear that these weaknesses carry with them substantial threats to the sustainability (social, environmental and economic) of projects which impact on the environment, and consequently to the local contexts where they are carried out and to the delicate balance of the global ecosystem. This paper argues that, in a sociological context of complexity and dynamism, four conceptual elements should underpin approaches to socio-environmental risk and impact assessment in development projects: a theoretical base in actor–network theory; an ethical grounding in values which are internationally recognized (though not always fulfilled in practice); a (new) epistemological-scientific base; and a methodological foundation in social participation.  相似文献   

8.
Environmental impact assessment (EIA) is a policy tool used for evaluating a project proposal from physical and socioeconomic environmental perspectives. Its aim is to reduce the impact of development on environment, hence, ensuring environmental sustainability. It is mandatory to submit an Environmental Impact Statement before starting a mega project as required by Environmental Protection Act of 1997 and Environmental Policy of Pakistan. Public consultation plays a key role in an EIA system, identifying the likely aspects and impacts of a development activity. This aspect has been ignored in effective enactment of environmental legislation in Pakistan. Sufficient legislative instruments are there to support EIA system in the country but the agencies responsible for the enforcement of environmental regulations have failed to do so. The current research gives an insight into the actual status of EIA system in Pakistan along with the feedback of EIA specialists and university teachers of the concerned departments. A new index has been devised on the basis of questionnaire response to work out the overall performance of EIA system in Pakistan or any other country. The weaknesses and deficiencies of each EIA stage have been worked out for Pakistan and elaborated with the help of the controversial Zero point Interchange Project in the capital city of Pakistan.  相似文献   

9.
Scholars have been increasingly investigating legislative changes in Environmental Impact Assessment (EIA). However, most of the existing evaluation frameworks have been applied to ex-post scenarios, after EIA laws and respective policies and regulations had been implemented for some time. This article has a twofold objective: first, to propose an ex-ante framework for the evaluation of proposed EIA laws and, second, to test the application of the framework to bills C-69 and PL-3729, which target federal-level EIA reform in Canada and Brazil, respectively. The proposed framework is meant to indicate the extent to which proposed legislative changes meet 50 good practice criteria, thus providing a more balanced and transparent account of the issues that should be addressed effectively in the legislative process and in future regulations and guidelines. Results indicate very contrasting scope and potential effects of proposed legislative changes in the two countries. Brazil's bill is essentially intended to integrate existing regulations into a law that would make EIA faster, simpler and less frequent. Canada's bill, recently approved by Parliament, includes a new Impact Assessment Act that is expected to deliver more comprehensive and credible assessments. The ex-ante framework, by exposing how close or distant proposed EIA regimes are from good practices, can be particularly helpful in lawmaking and regulatory design. The article finally discusses limitations and highlights future avenues of research.  相似文献   

10.
11.
There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil.In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts.We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The knowledge derived from this study may therefore be useful to a wider range of audience who are concerned with sustainable integration of development and environmental conservation.  相似文献   

12.
This paper presents a new methodology for impact assessment—SIAM (Spatial Impact Assessment Methodology)—which is based on the assumption that the importance of environmental impacts is dependent, among other things, on the spatial distribution of the effects and of the affected environment. The information generated by the use of Geographical Information Systems (GIS) in impact identification and prediction stages of Environmental Impact Assessment (EIA) is used in the assessment of impact significance by the computation of a set of impact indices. For each environmental component (e.g., air pollution, water resources, biological resources), impact indices are calculated based on the spatial distribution of impacts. A case study of impact evaluation of a proposed highway in Central Portugal illustrates the application of the methodology and shows its capabilities to be adapted to the particular characteristics of a given EIA problem.  相似文献   

13.
The Environmental Impact Assessment Directive (EIA Directive) has created a reference framework for the implementation of the system of Environmental Impact Assessment (EIA) into the legal systems of the Member States of the European Union, including the countries belonging to the Visegrad Group (V4): Poland, Slovakia, the Czech Republic and Hungary. The Directive was the basis for the introduction of compulsory stages of the EIA process in the V4. The stages were then adapted to national requirements, including thresholds of the qualifying criteria of projects at the screening and scoping stages. The EIA system in the analysed countries has been growing, changing and being modified together with the political and economic changes of the last 30 years. Although all Visegrad Group countries are members of the EU and should harmonize the provisions of the EIA Directive and its amendments, there still exist singularities in each country's national EIA legislation, in terms of complementarities among the V4 countries, access to information resources, protection of natural resources, mitigation of socio-environmental impacts, or transboundary impact assessment. The article compares and evaluates the EIA systems in the four countries, specifies similarities and differences in the implementation of administrative proceedings and points out opportunities to strengthen the system. It presents selected results of a study conducted in 2013 within the framework of the international project “Assessment of the quality of the environment in the V4 Countries” (AQE V4). This paper indicates examples of good practice in the EIA systems and the obtained results are compared regarding the amendments to the current European Union EIA Directive.  相似文献   

14.
We address the weaknesses inherent in the social risk assessments undertaken for business, especially in the extractive industries. In contrast to the conventional approach that considers consequence to the company rather than to impacted communities, conformance with the United Nations Guiding Principles on Business and Human Rights requires that consequence to affected communities has precedence. In order for social risks to be properly assessed, we consider that: companies need to know and understand the human rights impacts of their activities; contemporary approaches to project impact and risk assessment need to be adapted to consider human rights; and environmental impact assessment (EIA) and social impact assessment (SIA) methods need to be adapted to give greater attention to impacts on human rights. Using an example from the mining, oil and gas sector, we provide a method that differentiates social risks from business risks, and we position impact assessment as an instrument that actively facilitates the improved identification, analysis and management of social risks. Practical adaptations to SIA activities and risk assessment processes are provided. Taking human rights impacts into account and using the dimensions of gravity, extent, vulnerability and remediability, we nominate criteria to assess the significance of negative social impacts.  相似文献   

15.
At the core of the environmental impact assessment (EIA) process is the identification, prediction and evaluation of impacts, activities that are profoundly marked by case-specific differences and methodological pluralism. Despite difficulties, policy-makers are occasionally attracted to the idea of standardizing EIA methods. The objective of this study was to understand the merits of standardizing methods for impact prediction and significance evaluations, using Brazil as the empirical context. Based on a content analysis of 49 EIA reports, a survey with 126 practitioners, and a critical evaluation of two standardization initiatives, the study shows that, while generally perceived as beneficial, the standardization of EIA methods is likely to remain a rather challenging task in the foreseeable future. The high degrees of discretion taking place in the selection and implementation of impact prediction and significance evaluations are to a large extent a consequence of the difficulty of finding terminology, metrics, criteria, thresholds, boundaries, and values across different settings. Current standardization initiatives in Brazil are targeting some of the easiest methodological issues related to terminology and process. While relevant to administrative efficiency and process predictability, such issues represent a small piece of the complex puzzle of EIA effectiveness. Findings signal the need for clearer policy priorities, capacity building, and more applied research about the actual, long-term effects of standardization initiatives.  相似文献   

16.
Health Impact Assessment (HIA) is a decision support approach which is applied in various shapes and forms throughout the world. In England, amongst a range of areas of application, HIA is applied in local (spatial) plan making and project development planning. Whilst various authors have reflected on HIA practice in England, the extent of application and its quality has remained unclear. This paper aims at addressing this gap by reporting on the results of a systematic review of HIA in planning. It is found that between 100 and 200 HIAs are likely being produced each year in England. Whilst most assessments are rapid (desk based), there are also examples of comprehensive and intermediate HIAs, where a participatory procedural approach is followed. An important finding is that those HIAs applied within the context of other assessments (integrated impact assessment -IIA, strategic environmental assessment - SEA/ sustainability appraisal -SA and environmental impact assessment – EIA) tend to be of a higher quality than standalone HIAs, mainly because of the existing comprehensive statutory procedural requirements for these other assessments into which HIA can be integrated.  相似文献   

17.
The negative impacts of expressway construction projects (ECPs) on ecosystems have raised serious concerns globally. While ECP contractors are selective in implementing sustainable construction, they have rarely been informed of making reasonable efforts to address the concerns. This study aims to map out a quantitative analysis approach to aid contractors in determining ecological protection efforts. Four latent variables are included: project features, project perceptions, ecological impact evaluation, and ecological protection decision-making. It is revealed that project perceptions serve as a foundation for effort determination. The determination is built on the relationship between ecological impacts and the intensity of construction activities. Furthermore, the main effort decision is resource consumption. This study addresses decision-making issues pertained to the uptake of sustainability principles in the ECP sector and contributes a three-step framework for anticipating ecological protection efforts in the area of environmental studies.  相似文献   

18.
This study evaluates the Environmental Impact Assessment (EIA) legislation of South Africa and Zambia against the modified criteria developed by Wood (1995) to determine the extent to which they follow “good practices” and incorporate emerging environmental issues into EIA. We modified the criteria of Wood due to new environmental issues that have emerged since their formulation. Some of these issues are in line with the Sustainable Development Goals (SDGs). National Environmental Acts and EIA Regulations for the two countries were reviewed to evaluate the current legislation. We also used telephone interviews to gather additional information that was not in the documents. As a fundamental component of the EIA system, the legislation needs to be clear, concise and inclusive of all the major environmental issues that affect the performance of the EIA system. Literature reveals that the performance of the Zambian EIA system is generally low compared with that of some African countries such as South Africa and Ghana; especially in terms of the quality of EIA reports and substantive environmental protection. Therefore, we hypothesised that the Zambian legislation does not follow the good practice hence the low EIA system performance. Results, however, showed that the two countries are almost on a par in terms of meeting the criteria used in this study. Hence there is more to be done to improve the quality of both countries' EIA legislation. Nevertheless, compared with the previous evaluations by Wood (1999) and Harrison (2005), the results show that there is considerable improvement in the quality of the South African EIA legislation following a series of amendments.  相似文献   

19.
Environmental Impact Assessments (EIAs) are an important analytic tool for identifying and potentially mitigating project risks and negative environmental and societal impacts. Their usefulness, however, depends on how they are implemented and on whether findings are used in public decision-making. Given the notorious vulnerability of public-private interactions to corrupt practices, we examine potential and actual corruption risks across four stages of a generic EIA process. Combined with case analysis of the EIA process in Albania, a Southeastern European context experiencing serious governance challenges, we reflect on the vulnerabilities of EIAs to various forms of corruption from a principal-agent perspective. We concur with earlier research suggesting that the fundamentally rationalist approach behind EIAs do not necessarily match the empirical realities of public environmental decision-making, particularly in less mature EIA systems. We conclude with suggestions for framing a future research agenda in this area and touch on tentative policy remedies.  相似文献   

20.
Increasing emphasis has been placed in recent years on transitioning strategic environmental assessment (SEA) away from its environmental impact assessment (EIA) roots. Scholars have argued the need to conceptualize SEA as a process designed to facilitate strategic thinking, thus enabling transitions toward sustainability. The practice of SEA, however, remains deeply rooted in the EIA tradition and scholars and practitioners often appear divided on the nature and purpose of SEA. This paper revisits the strategic principles of SEA and conceptualizes SEA as a multi-faceted and multi-dimensional assessment process. It is suggested that SEA can be conceptualized as series of approaches operating along a spectrum from less to more strategic – from impact assessment-based to strategy-based – with each approach to SEA differentiated by the specific objectives of SEA application and the extent to which strategic principles are reflected in its design and implementation. Advancing the effectiveness of SEA requires a continued research agenda focused on improving the traditional SEA approach, as a tool to assess the impacts of policies, plans and programs (PPPs). Realizing the full potential of SEA, however, requires a new research agenda — one focused on the development and testing of a deliberative governance approach to SEA that can facilitate strategic innovations in PPP formulation and drive transitions in short-term policy and initiatives based on longer-term thinking.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号