首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 156 毫秒
1.
Cheng, Chuntian, Jianjian Shen, Xinyu Wu, and Kwok-wing Chau, 2012. Short-Term Hydroscheduling with Discrepant Objectives Using Multi-step Progressive Optimality Algorithm. Journal of the American Water Resources Association (JAWRA) 48(3): 464-479. DOI: 10.1111/j.1752-1688.2011.00628.x Abstract: With increase in the number and total capacity of hydropower plants in power systems, optimality algorithms with a single objective are not suitable for optimizing the operation of complex hydropower systems to meet complex demands. Hydropower plants should prioritize discrepant objectives, such as peak regulation and maximizing generation during solving of optimal operation problems of hydropower systems. In this article, we present a multi-step progressive optimality algorithm (MSPOA) for the short-term hydroscheduling (STHS) problem to improve the quality of optimal solutions and enhance the convergence speed of progressive optimality algorithm (POA). In MSPOA, the original problem is first decomposed into a sequence of problems with the longer time steps. Next, the problem with the longest time step is solved, and the optimal solution is used as the initial solution for the problem with the second longest time step. This process proceeds until the original problem with the shortest time step is solved. The proposed discrepant-objective method and solution technique are tested for two types of hydroelectric systems. The results show that MSPOA can give better solutions and cost less time than POA due to enlarging feasible range of decision variables and reducing the number of computational stages. Discrepant objectives among hydropower plants can express the operation characteristics of complex hydropower systems more accurately than unique objective or multiple objectives.  相似文献   

2.
ABSTRACT: A method to evaluate the effect of hydropower development on downstream dissolved oxygen (DO) is presented for a low head dam. Water, previously aerated during release over spillways and under gates, is diverted through the hydropower facility without further aeration. The oxygen transfer that occurs as a result of air entrainment at the various release points of a dam is measured. Oxygen transfer efficiencies are calculated and incorporated into an oxygen transfer model to predict average release DO concentrations. This model is used to systematically determine the effect of hydropower operation on downstream DO. Operational alternatives are investigated and a simple operational guide is developed to mitigate the effects of hydropower operation. Combinations of reduced generation and optimal releases from the dam allow the hydropower facility to operate within DO standards.  相似文献   

3.
At times, various analytical and empirical approaches used to estimate the initial sizing of a desilting basin in a hydropower project would give very different results and the designer has to take a call judiciously. The purpose of this study is to develop a monograph based on Teaching–Learning-Based Optimization and Gravitational Search algorithm for a practical range of depth of desilting basins. The parameters commonly used in hydropower projects for estimation of desilting basins sizing and its efficiency are used in this study. The outcome is further verified using a list of mega hydropower projects. This study will be useful in fixing the best optimized dimension of desilting basins.  相似文献   

4.
At any time, the phosphorus (P) concentration in surface waters is determined by a complex interaction of inputs of soluble P and sorption-desorption reactions of P with sediments. This study investigated what factors control P in solution when various soil aggregates were mixed, seen as being analogous to selective soil erosion events, transport, and mixing within river systems. Fifteen soils with widely differing properties were each separated into three aggregate size fractions (2-52 microm, 53-150 microm, and 151-2,000 microm). Resin P, water-soluble phosphorus (WSP), and the phosphorus buffer capacity (PBC = resin P/WSP) were measured for each aggregate size fraction and WSP was also measured for 11 mixes of the aggregate fractions. The smallest aggregates tended to be enriched with resin P relative to the larger aggregates and the whole soils, while the opposite was true for WSP. As the PBC was a function of resin P and WSP, the PBC was greatest in the 2- to 52-microm aggregate size fraction in most cases. When two aggregate size fractions were mixed, the measured WSP was always lower than the predicted WSP (i.e., the average of the WSP in the two individual aggregates), indicating that WSP released by one aggregate fraction could be resorbed by another aggregate fraction. This resorption of P may result in lower than expected solution P concentration in some surface waters. The strength with which an eroded aggregate can release or resorb P to or from solution is in part determined by that aggregate's PBC.  相似文献   

5.
ABSTRACT: In the western United States, hydropower and agriculture often cempete for surface waters. Since water markets are imperfect, allocations are often made through institutional arrangements and policy The purpose of this paper is to compare the gross water returns from agriculture with hydropower in terms of water use in Idaho. For the year 1986, returns from agriculture averaged $200 per acre-foot, and returns from hydropower averaged $8.00 per acre-foot.  相似文献   

6.
长期以来,我国对水电工程建设的环境管理实行环境影响评价和"三同时"制度,主抓环保审批和竣工验收两个环节,在工程施工阶段的环境管理相对薄弱,因此在水电资源开发的同时,也带来了一定程度的环境污染和生态破坏。为实现水电开发与环境保护的协调可持续发展,本文作者以某梯级电站为例,结合所参与的水电建设项目,对水电建设环境监理进行梳理和探讨,以期为水电建设项目环境监理的发展提供一定的理论及技术支持。  相似文献   

7.
Aggregate is used in road and building construction to provide bulk, strength, support, and wear resistance. Reclaimed asphalt pavement (RAP) and reclaimed Portland cement concrete (RPCC) are abundant and available sources of recycled aggregate. In this paper, current aggregate production operations in Virginia, Maryland, and the District of Columbia are used to develop spatial association models for the recycled aggregate industry with regional transportation network and population density features.The cost of construction aggregate to the end user is strongly influenced by the cost of transporting processed aggregate from the production site to the construction site. More than 60% of operations recycling aggregate in the mid-Atlantic study area are located within 4.8 km (3 miles) of an interstate highway. Transportation corridors provide both sites of likely road construction where aggregate is used and an efficient means to move both materials and on-site processing equipment back and forth from various work sites to the recycling operations.Urban and developing areas provide a high market demand for aggregate and a ready source of construction debris that may be processed into recycled aggregate. Most aggregate recycling operators in the study area are sited in counties with population densities exceeding 77 people/km2 (200 people/mile2). No aggregate recycling operations are sited in counties with less than 19 people/km2 (50 people/mile2), reflecting the lack of sufficient long-term sources of construction debris to be used as an aggregate source, as well as the lack of a sufficient market demand for aggregate in most rural areas to locate a recycling operation there or justify the required investment in the equipment to process and produce recycled aggregate.Weights of evidence analyses (WofE), measuring correlation on an area-normalized basis, and weighted logistic regression (WLR), are used to model the distribution of RAP and RPCC operations relative to transportation network and population distribution data. The models can be used on a regional scale to quickly map the relative site suitability for a RAP or RPCC aggregate recycling operation in a particular area based on transportation network and population parameters. The results can be used to identify general areas to be further evaluated on a site-specific basis using more detailed marketplace information. As transportation or population features change due to planning or actual development, the models can be easily revised to reflect these changes.  相似文献   

8.
针对干旱生态敏感区水电站环境影响后评价的要求,设计备选指标集,采用频次分析法进行指标初选,采用专家咨询法进行指标精选,建立由4项二级指标、14项三级指标构成的干旱生态敏感区水电站环境影响后评价指标体系,采用层次分析法给每个指标赋予权重.将该评价指标体系用于某水电站建设的实例分析,结果表明,水电站运行以来总体上有利影响大...  相似文献   

9.
Environmental flows are an important consideration in licensing hydropower projects as operational flow releases can result in adverse conditions for downstream ecological communities. Flow variability assessments have typically focused on pre‐ and post‐dam conditions using metrics based on daily averaged flow values. This study used subdaily and daily flow data to assess environmental flow response to changes in hydropower operations from daily peaking to run‐of‐river. An analysis tool was developed to quantify flow variability metrics and was applied to four hydropower projects. Significant differences were observed between operations at the 99% confidence level in the median flow values using hourly averaged flow datasets. Median daily rise and fall rates decreased on average 34.5 and 27.9%, respectively, whereas median hourly rise and fall rates decreased on average 50.1 and 50.6%, respectively. Differences in operational flow regimes were more pronounced in the hourly averaged flow datasets and less pronounced or nonexistent in the daily averaged flow datasets. These outcomes have implications for the development of ecology‐flow relationships that quantify effects of flow on processes such as fish stranding and displacement, along with habitat stability. Results indicate that flow variability statistics should be quantified using subdaily datasets to accurately represent the nature of hydropower operations, especially for daily peaking facilities.  相似文献   

10.
ABSTRACT: Two case studies highlighting the institutional arrangements and decision-making processes used to attempt to allocate water on large scale river systems in two countries are presented. In both cases the implementation of river plans has been blocked by conflicts between those who wish to use water for irrigation, hydropower, or municipal purposes and those who wish to maintain instream flows for fish and wildlife. To date conflict has blocked the implementation of a large hydropower scheme on the Danube River, downstream from Vienna, Austria, and the construction of municipal and agricultural projects, as well as the relicensing of an existing hydropower facility on the Platte River in Nebraska. Analysis of the decision-making processes and institutional settings of both cases led to the identification of problem areas and development of recommendations that would support the achievement of compromise solutions for management.  相似文献   

11.
While collaborative governance has many benefits for environmental planning and management, those benefits are not politically feasible if they impact on process efficiency. This study assesses collaboration's effect on the duration of water permitting processes, specifically the United States’ Federal Energy Regulatory Commission's hydropower relicensing process. Collaboration was measured using a survey of participants in 24 recent hydropower relicensing processes. A Cox proportional hazards model with mixed effects assessed the relationship between collaboration, regulatory framework, hydropower facility characteristics, and relicensing process duration. Collaboration was not associated with time to license. Instead, process duration depended on the regulatory framework (especially the switch to the Integrated Licensing Process and presence of endangered species) and facility characteristics (generating capacity and facility type). The results suggest that agencies should consider engaging collaboratively during planning and permitting, given that collaboration's benefits to decision quality do not incur a cost on overall process time.  相似文献   

12.
ABSTRACT: The indexed sequential hydrologic modeling (ISM) methodology is utilized by the Western Area Power Administration as the basis for risk-based estimation of project-dependable hydropower capacity for several federally owned/operated projects. ISM is a technique based on synthetic generation of a series of overlapping short-term inflow sequences obtained directly from the historical record. The validity of ISM is assessed through application to the complex multireservoir hydropower system of the Colorado River basin for providing risk estimates associated with determination of reliable hydrogeneration capacity. Performance of ISM is compared with results from stochastically generated streamflow input data to the Colorado River Simulation System (CRSS). Statistical analysis and comparison of results are based on monthly power capacity, energy generation, and downstream water deliveries. Results indicate that outputs generated from ISM synthetically generated sequences display an acceptable correspondence with those obtained from stochastically generated hydrologic data for the Colorado River Basin.  相似文献   

13.
ABSTRACT: This paper describes a mathematical model, an algorithm and a computer program that were specially developed to study the problem of a water quality management system undergoing a rapidly increasing environmental stress. The model output will determine the locations, sizes and the timing of construction of new treatment plants plus an overall treatment plant operating policy so that environmental standards are maintained at a minimum cost. The model, as formulated, is a 0-1 mixed integer programming problem which is solved by decomposing it into a capital budgeting problem (solved by Little's branch and bound algorithm) and an operational policy problem (solved by linear programming). The coded algorithm (in FORTRAN 10) has been tested with a semi-realistic example.  相似文献   

14.
小水电站环境影响评价内容探讨   总被引:1,自引:0,他引:1  
吕庆华  蔡瑢 《四川环境》2003,22(4):67-68,82
小水电站工程环境影响评价按有关规范规定为报告表,但其大纲内容不适合山区小水电站环评。通过总结30余座小水电站环评实践,探讨了小水电站环评基本内容应包括:环境影响分析与预测评价、涉及生态影响因子范围、环境保护措施、公众参与等,从技术角度能满足环保管理部门的审批要求。  相似文献   

15.
Hydropower,adaptive management,and Biodiversity   总被引:2,自引:0,他引:2  
Adaptive management is a policy framework within which an iterative process of decision making is followed based on the observed responses to and effectiveness of previous decisions. The use of adaptive management allows science-based research and monitoring of natural resource and ecological community responses, in conjunction with societal values and goals, to guide decisions concerning man's activities. The adaptive management process has been proposed for application to hydropower operations at Glen Canyon Dam on the Colorado River, a situation that requires complex balancing of natural resources requirements and competing human uses. This example is representative of the general increase in public interest in the operation of hydropower facilities and possible effects on downstream natural resources and of the growing conflicts between uses and users of river-based resources. This paper describes the adaptive management process, using the Glen Canyon Dam example, and discusses ways to make the process work effectively in managing downstream natural resources and biodiversity.  相似文献   

16.
Incorporation of environmental flow releases from reservoirs has proven to be challenging due to fear of losses to existing water uses. Moreover environmental flow requirements (EFR) have not often been operationalized. This study compares the possibility of implementing dynamic EFR based on natural flows lagged against an upstream unregulated gauging point with static EFR. It simulates different scenarios with a high flow release in the wet season and analyses its impacts on hydropower production. This method accounts fully for the natural variability of environmental flows, implying less pressure on existing water uses during relatively dry years. Joint operation of two cascading dams vs. individual operation for EFR was also explored. These approaches were tested for the Zambezi River basin in Southern Africa using a water resources model, WAFLEX. Historic data on reservoir water levels, releases and power generation of the hydropower schemes were synthesized. Combining these yielded a validated series of monthly flow data for a 28 year period (1982‐2010). The results show that Kariba and Cahora Bassa reservoirs face a reduction in power produced when they would annually release an environmental flow. However, the dynamic EFR method entails smaller hydropower losses. Joint environmental flow operations will reduce overall basin power production more than if Cahora Bassa alone would release an environmental flow. However, such joint operation would be more beneficial to the ecosystem.  相似文献   

17.
乌江干流梯级电站生态调度现状分析   总被引:2,自引:0,他引:2  
乌江是我国十三大水电基地之一,主要的开发任务为发电,其次为航运,兼顾防洪及其他。本研究在乌江干流上选取了4个具有代表性的断面,运用修正的Tennant法和综合法计算了维持乌江干流各代表性河段基本健康所需的生态需水量。研究表明,目前乌江干流梯级电站采取的调度措施能够满足各代表性河段所需的最小生态需水量。但目前的调度措施仍是建立在发电效益最大化基础上的,未能从干流生态环境系统的特殊要求进行调度,给干流生态环境造成了一定影响。本文最后提出了从多方面开展乌江干流梯级电站生态调度研究工作的建议。  相似文献   

18.
ABSTRACT: The potential for hydroelectric power development at existing dams is great in oil dependent New England where there are over 10,000 dams presently in existence. Over 400 developments have been proposed in the region, the majority of which are small scale, and do not have major environmental impacts. Nevertheless, a variety of constraints may hinder development. A study of three efforts by municipalities in unique positions to develop hydropower reveals that organizational and political considerations are significant factors affecting development. Successful hydropower development requires: (1) the cooperation and interaction of citizens, government, and the private sector; (2) community interest and education; and (3) strong resolve.  相似文献   

19.
ABSTRACT: The Montana Department of Natural Resources and Conservation developed a hydrologic model to help analyze the effects of allocating water for consumptive and instream uses in the upper Missouri River basin of Montana. The model, a PC-based FORTRAN program, uses a mass-balance approach to compute monthly streamflows, reservoir operations, hydropower production, and irrigation and municipal water uses throughout the 54,000 square mile basin for a 59-year base period. Simulation results are presented as monthly mean and percentile-exceedence values. The model was run for baseline conditions and six hypothetical water-allocation alternatives. Results were used by staff resource area specialists to assess potential impacts to water quantity and distribution, water rights, water quality, stream channel form, fisheries, wildlife, recreation, hydropower production, and economics. These analyses were presented to the public and the decision-making board in an environmental impact statement (EIS). Though, in many instances, the model did not allow for detailed, site-specific analyses, the model was an important tool and its simulation results formed the hydrologic basis for the EIS.  相似文献   

20.
随着一系列梯级水电站的建成运行,因上游电站泄水引起下游河道型水库水体中总溶解气体(TDG)过饱和,导致库区鱼类患气泡病甚至死亡的风险增加。针对河道型水库过饱和TDG释放预测问题,建立河道型水库的纵向一维过饱和TDG释放预测模型,研究不同洪水条件下河道型水库在变水位运行条件下的水动力学和过饱和TDG释放特性,分析了过饱和TDG沿程释放和代表性断面的TDG过程,探讨了横断面滩地区域的水深变化和鱼类补偿水深的满足性。结果表明降低来流的TDG水平是减小其不利影响的重要手段,在来流TDG饱和度一定时,河道型水库适当以高水位运行能够为滩地区域鱼类提供足够的躲避水深。本文结果对梯级电站优化调度以减缓TDG影响的研究和方案实施提供了技术支撑,在梯级水电开发河流的水生态保护方面具有重要意义。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号