首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 781 毫秒
1.
为充分识别、量化和评估绿色信贷的成本与收益,本文从银行和社会两个角度,梳理绿色信贷的直接(间接)成本和直接(间接)收益的类型和内涵,提出全面核算绿色信贷成本与收益的一般框架,以我国21家主要商业银行2013—2017年绿色信贷实施情况为例探讨了该框架的可行性。依据该核算框架对银行的直接成本和收益、社会的直接收益进行了定量核算,对银行的间接成本和收益、社会的直接和间接成本、社会间接收益进行了定性分析。结果表明:多数商业银行施行绿色信贷能带来利润;近半数银行的绿色信贷项目收益率在全行信贷项目平均收益率之上;核算期内绿色信贷节能减排的环境效益累计达1.03万亿元,平均每万元绿色信贷投放带来253元环境效益。本文为实现绿色信贷影响的综合分析、绿色信贷环境外部性内生化提供了科学的分析方法,对政府和商业银行实施绿色信贷政策具有重要意义。  相似文献   

2.
This paper sets out the legislative background to the recycling of waste materials in the UK. Relevant items in this background include: the provision of recycling credits under the 1990 Environmental Protection Act; the draft EC Packaging Waste Directive; and the German DSD scheme. We next set out the elements of a cost‐benefit analysis of waste paper recycling, including the environmental impacts of recycling. The method is then applied to a recycling scheme in central Scotland. We find that whilst on private, financial grounds the scheme is unattractive, it passes the cost‐benefit test in the base‐line case; this justifies government support for this recycling scheme, given the data used.  相似文献   

3.
Water companies have to ensure that supply and demand for water are kept in balance. This can necessitate the development of new sources of supply that may conflict with local wildlife interests. The paper reviews the policy background to this problem in the UK. It then presents an appraisal of a project to artificially recharge an aquifer with river water during the winter period, and abstract the water in the summer to augment shortages during drought conditions. The research investigates the preference trade-offs of water company customers between increasing security of supply and potential environmental impacts on local wetland sites and river flows. A cost-benefit analysis of the project is presented. The study also reveals a disparity between the site-specific valuation and that generated using the Environment Agency's approved benefit transfer guidelines.  相似文献   

4.
Water reuse is an emerging and promising non-conventional water resource. Feasibility studies are essential tools in the decision making process for the implementation of water-reuse projects. However, the methods used to assess economic feasibility tend to focus on internal costs, while external impacts are relegated to unsubstantiated statements about the advantages of water reuse. Using the concept of shadow prices for undesirable outputs of water reclamation, the current study developed a theoretical methodology to assess internal and external economic impacts. The proposed methodological approach is applied to 13 wastewater treatment plants in the Valencia region of Spain that reuse effluent for environmental purposes. Internal benefit analyses indicated that only a proportion of projects were economically viable, while when external benefits are incorporated all projects were economically viable. In conclusion, the economic feasibility assessments of water-reuse projects should quantitatively evaluate economic, environmental and resource availability.  相似文献   

5.
ABSTRACT: This paper provides a critical analysis of the Bureau of Reclamation's Auburn-Folsom South project in California. While this massive $1.5 billion project is temporarily halted for redesign for earthquake hazard, it is timely to examine its justification on economic grounds. The key finding is that several major benefit categories, irrigation and recreation, have been grossly overstated. In addition, the Bureau failed entirely to estimate the cost of use on the free-flowing American River, or a probability-weighted estimate of catastrophic loss. Revised estimates indicate that the project is not economically justified. In addition, the project has unattractive distributive effects. The implications of this case study for current revisions in U.S. water policy are explored. The Auburn study basically provides support for the U.S. Water Resource Council's draft manual of procedures for evaluating federal water resource projects.  相似文献   

6.
水电站的建设会造成坝址下游河段减水,对水环境和水生生物造成不利影响,因此电站生态流量的确定和泄放措施的可行性对于维护河流生态环境至关重要。以硕曲河去学水电站为例,基于可行性研究阶段提出的生态流量泄放措施方案,采用数学模型和理论分析方法,从生态流量取水水温、泄洪洞事故条件下生态流量保证率以及水资源的合理高效利用等方面进一步对生态流量泄放方案进行了优化比选。提出的优化方案提高了生态流量取水口的布置高程,在泄洪洞之外单独布置生态泄放系统,并增设生态流量发电机组等。对比分析表明,该优化方案在改善生态流量的下泄水温、提高生态流量泄放保证率、合理高效利用水能资源等方面具有较大优势。本研究为水电工程中生态流量泄放措施保障等方面提供了科学依据和技术参考。  相似文献   

7.
The paper presents a framework for the analysis of external costs of environmental burdens, namely an impact pathway analysis, often coupled with the inventory stage of life cycle assessment (LCA). The ground rule is: quantify as much as possible in terms of burdens (pollutant emissions, etc.), impacts, and their monetary equivalent, then use multi-criteria analysis (MCA) for any remaining impacts that are considered to be too uncertain or defy quantification through to monetization. Although MCA could be used directly on estimates of burdens or impacts, monetary valuation provides a mechanism for consistent weighting of impacts categories based on assessment of public preference. Further advantages of extending LCA through detailed impact assessment combined with monetary valuation are that it greatly simplifies MCA by combining a large number of different environmental impact categories, thereby avoiding an unmanageably large number of criteria, and also facilitates cost benefit analysis (CBA). The risks are noted of inappropriate use of the tools or interpretation/use of the results, and recommendations are made for improved practice. These points are illustrated with examples. The key messages are: (1) that policies should be targeted correctly to give a clear signal which source of a burden should be reduced by how much; (2) that analysts should take into account the needs of policy makers and the link between the analysis and possible policy applications; and (3) that current LCA practice gives limited guidance in both areas, largely through a lack of consideration of the relative and absolute importance of different types of impact. However, this is precisely the strength of external costs analysis, particularly when used with MCA.  相似文献   

8.
Although there is continuing debate surrounding biofuel cultivation (especially in developing nations) in relation to issues of exploitation, land grabbing, poverty alleviation and energy security, there is a lack of empirical evidence to assess how these debates are playing out in practice on the ground. Drawing on political ecology discourse, this paper examines case studies of biofuel production in Zambia and the effects they have on environmental and social sustainability. During April and May 2011, data were collected on two case study projects involving Jatrophacurcas feedstock cultivation in Zambia. Semi‐structured interviews were used to ascertain views from affected stakeholders (local farmers, local environmental, social, and agronomic experts, and investors) on the biofuel projects and their environmental and social impacts. The findings suggest that the uneven distribution of costs and benefits are brought about by imbalances in knowledge, access to resources and the allocation of social and political influence (often associated with broader discourses of development), and this provides a likely rationale for a lack of sustainability in biofuel projects. Drawing on these viewpoints, as well as on field observations, this paper outlines the barriers and opportunities linked to Jatrophacurcas project sustainability.  相似文献   

9.
浅谈企业建设项目的环境成本管理   总被引:2,自引:0,他引:2  
冯海波  于振英 《四川环境》1999,18(4):68-70,73
企业建设项目的运行应做到经济效益和环境效益的统一,所以企业在治理污染的同时,还要注重自身的环境成本管理。本文从成本管理的角度,介绍了环境成本管理的必要性和面临的困难,并陈述了作者对环境成本管理的内容的看法。  相似文献   

10.
ABSTRACT: This paper describes a method of analyzing the nonquantifiable parameters which should be considered in the evaluation of engineering alternatives. The nonquantifiable parameters can include environmental impact, feasibility of implementation, and performance. The method considers rating all the alternatives on the basis of a set of criteria which reflect these parameters. A procedure is discussed for obtaining review and guidance in the evaluation of engineering alternatives from the local elected officials or governing bodies and for obtaining the views and desires of the local communities. This is achieved through the formation of project review committees and an evaluation procedure which allows for the technical rating of alternatives by the engineer and the weighing of the evaluation criteria by the political and social groups. With the growing environmental concern and the high cost of engineering projects, the involvement of the public during the evaluation of engineering projects is becoming increasingly important to the final success of the project.  相似文献   

11.
Incorporating environmental and natural resource impacts into the benefit-cost analysis of projects in the developing world now relies on a solid body of theory and recommended techniques, but there remain concerns with how this is done in practice. One aspect arises when time and resource constraints make highly sophisticated analysis difficult or impossible. This paper discusses situations where analyses can be improved using relatively simple ‘short cut’ techniques that substitute for more formal analysis that cannot be undertaken realistically or provide an added perspective on project viability. Case studies are employed to illustrate the techniques, based upon the author's experience with appraisals at the World Bank, Food and Agriculture Organization (FAO) and the International Fund for Agricultural Development (IFAD). It is shown that short cut techniques can dramatically alter the outcome of an appraisal at relatively little cost. However, caution is advised since such techniques can be misused, so that the development of suitable protocols is desirable.  相似文献   

12.
Environmental impact assessment (EIA) procedures have been in existence in the People's Republic of China over the last decade. The impetus for China's introduction of EIA was provided by the Environmental Protection Law of the People's Republic of China, which was adopted by the Fifth National People's Congress in 1979. The EIA process, which is administrative and not statutorily mandated, has been applied primarily to construction projects. Four stages are typically involved in an EIA investigation: design of the investigation, evaluation of background environmental quality, prediction of environmental impacts, and an assessment and analysis of the environmental impacts. A variety of approaches is used for predicting and analyzing environmental impacts, ranging from ad hoc methods to fairly sophisticated mathematical models. The results of the EIA investigation are compiled in an environmental impact statement, which is used as the basis for decision making by personnel in environmental protection departments. The EIA process does not include provisions for citizen notification or involvement. Views differ concerning the effectiveness of the EIA program in protecting China's natural, social, and cultural environments. Some hold that the EIA program has brought about improvement in environmental protection, while critics contend that the program has had little effect in the prevention of pollution. However, most, if not all, observers seem to feel that the program should be continued and improved. A major avenue for improvement is to place the evaluation of a particular project in a regional context. An earlier version of this paper was distributed at a workshop on Environmental Assessment Development Planning held in conjunction with the VII Annual Meeting of the International Association for Impact Assessment, Brisbane, Australia, July 5–8, 1988.  相似文献   

13.
杨军  张弛 《四川环境》2003,22(2):74-76
经济效益分析是污染治理工程很重要的一个环节,污染治理工程成功与否关健在经济上是否有效益。本文对铜山县宏发造纸厂的污水治理工程的经济效益进行分析,得知该厂投资治理污染的成本一年内可收回。企业废水治理后达标排放,减少了对周边环境的污染,井取得显著的经济效益和社会效益。  相似文献   

14.
This paper presents an empirical approach to select and prioritize sewerage projects within set budgetary limitations. The methodology includes a model which quantifies benefits of a sewerage project as an index or dimensionless number. The index considers need and urgency of sewerage and other project goals. Benefit is defined as the difference in anticipated impact between the current condition (without the project) and the expected condition with the project. Anticipated benefits primarily include reduction in environmental pollution, reduction of human diseases and morbidity, and other tangible and intangible improvement. This approach is a powerful decision tool for sewerage prioritization and an effective alternative to conventional cost-benefit analysis. Unlike conventional analysis, this approach makes no attempt to convert project benefits and other impacts into a monetary measure. This work recognizes that the decision to provide sewerage based solely on net benefits is not practical. Instead, benefit-cost ratios (B/C) are calculated utilizing cost-effectiveness approach. Using these ratios, 16 unserviced areas of Ensenada, Mexico are ranked. The prioritization rankings produced by this method must be further scrutinized and carefully reviewed for logic, accuracy of input data, and practicality of implementation. A similar framework may also be useful for prioritizing other public works projects.  相似文献   

15.
16.
This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.  相似文献   

17.
Summary The Yellow River is renowned for its life-endangering floods, a problem augmented by the continuous heavy siltation of its lower flood plain. Major dam and reservoir projects have both positive and negative environmental impacts, and their construction requires careful environmental consideration. This paper outlines the key findings of environmental impact assessment reports related to the Xiaolangdi Yellow River dam/reservoir project. The authors conclude that the project, as planned, should provide an optimal mix of both economic and environmental benefits.This paper is modified from a presentation given to the 1993 Annual Meeting of the International Association for Impact Assessment (IAIA) in Shanghai, China.  相似文献   

18.
ABSTRACT: An integral part of evaluating the net benefits generated by an existing or proposed irrigation project is the assessment of the associated impacts in commodity markets. Traditionally, these impacts have been measured by either assuming no change in commodity prices and calculating net returns to project farmers, or by allowing commodity prices to fall in accordance with a given elasticity of demand and subtracting commodity production costs from the associated area under the commodity demand curve. In either case, it is implicitly assumed that supply is perfectly inelastic. This article establishes that traditional approaches to measuring direct benefits are biased. Formulae are presented for calculating the maximum absolute and relative error which may result from using these techniques as a function of project size. Direct benefit estimates are then evaluated for three irrigation projects in Nebraska, illustrating how these results can be used to improve project evaluation procedures.  相似文献   

19.
The proposed Cotingo Dam in Brazil's far northern state of Roraima is examined with the objective of drawing lessons for Brazil's system of evaluating environmental, social, and financial consequences of development decisions. The Cotingo Dam illustrates the difficulty of translating into practice the principles of economic and environmental assessment. Examination of the financial arguments for the Cotingo Dam indicates that justifications in this sphere are insufficient to explain why the project is favored over other alternatives and points to political factors as the best explanation of the project's high priority. Strong pressure from political and entrepreneurial interest groups almost invariably dominates decision making in Amazonia. The analysis indicates the inherent tendency of the present system to produce decisions in favor of large construction projects at the expense of the environment and local peoples. The requirements intended to assure proper weight for these concerns, such as the report on environmental impacts (RIMA) and the public hearing, fail to serve this role. Cotingo also provides a test case for constitutional protections restricting construction of dams in indigenous lands.  相似文献   

20.
ABSTRACT: The deliberate underwatering of a larger land area, as practiced in Southern Asia, has provided impetus for a systematic investigation into the effects of designing projects for crop water deficits on Benefit-Cost performance. The study began with the derivation, from published experimental results, of functions relating ultimate crop yield to the magnitude and timing of water deficits, i.e., of the productivity of irrigation water. To obtain the net benefit of the project, the relation between the harvested area and output and the on-farm production costs was then suggested. The cost of supplying the irrigation water to the proposed area and of distributing and applying it to the field was determined, thus completing the Benefit-Cost equation. A computer simulation model was then established to search for the irrigation project design capacity and area to maximize the net present value in the Benefit-Cost analysis for the development proposed.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号