首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 46 毫秒
1.
In 2017, Consumers Energy completed a sediment response action in the Flint River to address manufactured gas plant‐related impacts in sediments and at the groundwater‐surface water interface. The project site is located in an urban, channelized, developed reach of the river. Multiple property owners and site constraints presented unique challenges for the remedial design, including the presence of Hamilton Dam at the downstream edge of the site which was considered a high‐hazard dam in “very poor condition.” An additional consideration was the City of Flint water crisis which was initially exposed in 2014. The sediment response action was not related to the water crisis because the site is located approximately two miles downstream of the City's water intake, but design, permitting, and construction began after 2014, so the timing added a heightened sense of awareness from the public stakeholders. The successful completion of the sediment response action was the result of deliberate planning, iterative engineering, and open communication with stakeholders that enabled a careful balancing of objectives with sometimes competing interests.  相似文献   

2.
In situ chemical oxidation (ISCO) with permanganate has been widely used for soil and groundwater treatment in the saturated zone. Due to the challenges associated with achieving effective distribution and retention in the unsaturated zone, there is a great interest in developing alternative injection technologies that increase the success of vadose‐zone treatment. The subject site is an active dry cleaner located in Topeka, Kansas. A relatively small area of residual contamination adjacent to the active facility building has been identified as the source of a large sitewide groundwater contamination plume with off‐site receptors. The Kansas Department of Health and Environment (KDHE) currently manages site remedial efforts and chose to pilot‐test ISCO with permanganate for the reduction of perchloroethene (PCE) soil concentrations within the source area. KDHE subsequently contracted Burns & McDonnell to design and implement an ISCO pilot test. A treatability study was performed by Carus Corporation to determine permanganate‐soil‐oxidant‐demand (PSOD) and the required oxidant dosing for the site. The pilot‐test design included an ISCO injection approach that consisted of injecting aqueous sodium permanganate using direct‐push technology with a sealed borehole. During the pilot test, approximately 12,500 pounds of sodium permanganate were injected at a concentration of approximately 3 percent (by weight) using the methods described above. Confirmation soil sampling conducted after the injection event indicated PCE reductions ranging from approximately 79 to more than 99 percent. A follow‐up treatment, consisting of the injection of an additional 6,200 pounds of sodium permanganate, was implemented to address residual soil impacts remaining in the soil source zone. Confirmation soil sampling conducted after the treatment indicated a PCE reduction of greater than 90 percent at the most heavily impacted sample location and additional reductions in four of the six samples collected. © 2009 Wiley Periodicals, Inc.  相似文献   

3.
This article presents a case study of an accelerated cleanup conducted by EPA at the Adams Plating Company (APC) Superfund site near Lansing, Michigan. The APC site remediation was a Superfund EPA-lead project under the remedial program in Region 5. An accelerated cleanup was possible at the APC site by consistently identifying, evaluating, and implementing opportunities to streamline the remedial investigation (RI) and remedial design (RD) process. Streamlining opportunities were discovered and implemented in both the technical and administrative aspects of the project. Streamlining components used to accelerate the remedial process included: (1) extensive use of field screening techniques during the Phase II RI; (2) a focused feasibility study (FS) that evaluated only practical alternatives; (3) maintaining project momentum by initiating the RD concurrent with the issuance of the Record of Decision (ROD); (4) a highly accelerated RD with limited predesign work; (5) elimination of the transition period between RD and remedial action (RA) project phases; (6) frequent and effective communication, coordination, and cooperation between all parties involved (EPA, Michigan Department of Natural Resources (MDNR), technical contractor, PRC Environmental Management, Inc. (PRC), and the public); (7) maintaining a consistent project team throughout project duration; and (8) the setting of aggressive project goals.  相似文献   

4.
Under the purview of EPA's Remedial Engineering Management (REM III) Superfund contract, a CERCLA RI/FS was performed at the Pinettes Salvage Yard site located in Washburn, Maine (EPA Region I). The purpose of the RI/FS was to fully characterize the nature, extent, and fate and transport of PCB contamination resulting from an alleged surface spill of transformer dielectric fluid containing Arochlor 1260 (a polychlorinated biphenyl) and various volatile and semivolatile organic constituents. The RI/FS was performed subsequent to both an immediate removal action (IRA) and a deletion remedial investigation (DRI) performed by EPA contractors. Results of both efforts indicated that the site was unsuitable for deletion from the National Priorities List (NPL) because the site soils contained elevated levels of PCBs. This article presents a case history of the extensive field investigations performed to characterize the contaminant source and evaluate the fate and transport of PCBs in site soils. These investigations included on-site mobile laboratory gas chromatograph (GC) analytical techniques for PCBs and targeted volatile and semivolatile organic compounds; confirmatory Contact Laboratory Program (CLP) laboratory analyses of soils, sediments, surface water, and groundwater samples; statistical analyses and correlation of field mobile laboratory GC data with CLP laboratory analytical results; and an evaluation of the potential effects of cosolvency in the fate and transport of PCBs in subsurface soils.  相似文献   

5.
Redevelopment and reuse plans are often based upon an expedited delineation and remediation life cycle, since delayed reuse usually has economic consequences. It has also become increasingly important to utilize sustainable practices to achieve investigation and remediation goals. In this article, the Triad approach is used to expedite the delineation of a source area within a municipal landfill to complete the remedial effort prior to construction of an urban civic center. The Triad approach uses the three elements of systematic project planning, dynamic work strategy, and real‐time measurement to expedite site characterization (Interstate Technology and Regulatory Council, 2003). In this article, the Triad sampling strategy consisted of two phases. The first phase included in situ screening of soil and groundwater using the membrane interface probe (MIP), and the second phase included confirmatory sampling via vertical profiles in the soil and groundwater. This study found that, using the MIP in a dynamic sampling strategy, a critical element of the Triad approach, combined with the proper placement of confirmatory samples, significantly reduced overall project cost and will expedite the site redevelopment. The use of the Triad approach also contributed to the integration of green and sustainable practices into the project. © 2010 Wiley Periodicals, Inc.  相似文献   

6.
Historic mineral ore processing operations at the former Cyprus Foote Mineral Site located in East Whiteland Township, Pennsylvania, have resulted in the creation of an approximately 10,000‐foot‐long off‐site groundwater plume impacted with lithium and bromate. The plume emanating from the site is impacting the groundwater quality of downgradient private residences. As an early part of the remedial implementation, the private residences were provided with public water connections while the source control efforts were being designed and implemented. Bromate and lithium have recently emerged as groundwater contaminants subjected to increased regulatory scrutiny. This is evidenced in a recently lowered Federal Maximum Contaminant Level (MCL) for bromate of 0.010 milligrams per liter and a Medium‐Specific Concentration (MSC) of 0.005 mg/L for lithium recently proposed by the Pennsylvania Department of Environmental Protection (PADEP) for all groundwater within the Commonwealth. Elevated concentrations for bromate and lithium were detected above the Proposed Remediation Goals (PRGs) for the site, MCLs, and MSCs at a distance of 7,300 feet and 9,200 feet from the source area, respectively. To reduce the contaminant concentrations within the groundwater plume, which will ultimately result in a regressing plume, and to enable the Brownfield redevelopment of this Superfund site, auger‐based, in situ soil stabilization (ISS) with depths of up to 75 feet below ground surface (bgs) was selected as the remedy. The remedial implementation required the temporary removal and relocation of over 100,000 cubic yards of overburden to expose the lithium‐bearing tailings prior to treatment. Using customized 90‐foot‐long, 9‐foot‐diameter augers attached to cranes and drilling platforms, ancillary support excavators, and approximately 21,000 tons of reagent; 2,019 ISS columns were advanced to depths ranging from 10 to 74 feet bgs. This resulted in the creation of an in situ low‐permeablity 117,045‐yd3 “quasi‐monolith,” which encompasses a lateral extent of approximately three acres. The integration of a comprehensive ISS design with a comprehensive long‐term groundwater‐monitoring plan ensured the success of the ISS implementation and will enable a continued evaluation of the off‐site groundwater quality. © 2009 Wiley Periodicals, Inc.  相似文献   

7.
In the early 1990s, a soil removal action was completed at a former disposal pit site located in southern Michigan. This action removed waste oil, cutting oil, and chlorinated solvents from the unsaturated zone. To contain groundwater contaminant migration at the site, a groundwater pump‐and‐treat system comprised of two extraction wells operating at a combined flow of 50 gallons per minute, carbon treatment, and a permitted effluent discharge was designed, installed, and operated for over 10 years. Groundwater monitoring for natural attenuation parameters and contaminant attenuation modeling demonstrated natural attenuation of the contaminant plume was adequate to attain site closure. As a result of incomplete contaminant source removal, a rebound of contaminants above the levels established in the remedial action plan (RAP) has occurred in the years following system shutdown and site closure. Groundwater concentrations have raised concerns regarding potential indoor air quality at adjacent residential properties constructed in the past 9 to 10 years. The only remedial option available in the original RAP is to resume groundwater pump‐and‐treat. To remediate the source area, an alternate remediation strategy using an ozone sparge system was developed. The ozone sparge remediation strategy addresses the residual saturated zone contaminants beneath the former disposal pit and reestablishes site closure requirements without resumption of the pump‐and‐treat system. A pilot study was completed successfully; and the final system design was subsequently approved by the Michigan Department of Environmental Quality. The system was installed and began operations in July 2010. As of the January 2011 monitoring event, the system has shown dramatic improvement in site contaminant concentrations. The system will continue to operate until monitoring results indicate that complete treatment has been obtained. The site will have achieved the RAP objectives when the system has been shut down and meets groundwater residential criteria for four consecutive quarters. © 2011 Wiley Periodicals, Inc.  相似文献   

8.
Twenty years of waste disposal operations at the Conservation Chemical Company (CCC) site in Kansas City, Missouri, led to contamination of soils and groundwater on a six-acre site. As a result of this contamination, the site was listed on the federal government's National Priorities List. Following extensive litigation initiated in 1982, more than 200 contributors to the site (Potentially Responsive Parties or PRPs), CCC's insurance companies, and the government ultimately reached a settlement to fund the remedial action. The remedy that was agreed upon included: (1) a permeable cap to allow water intrusion to assist groundwater cleanup; (2) a with drawal well system to achieve an inward groundwater gradient; and (3) a groundwater treatment system employing several unit operations. Containment of the contaminated plume relied on hydraulic, rather than structural, containment to prevent mitigation of contaminants from the site. ABB Environmental Services, Inc. (ABB-ES) was retained to perform treatability tests and to design, construct, and start up the groundwater treatment plant after the installation of the permeable cap by others.  相似文献   

9.
The U.S. Army Corps of Engineers (US ACE) is responsible for conducting the cleanup of radiological contaminated properties as part of the Formerly Utilized Sites Remedial Action Program. One property is the Rattlesnake Creek (RSC) portion of the Ashland sites. The RSC stream sediments are contaminated with thorium‐230, radium‐226, and uranium. The US ACE is closing RSC using protocols contained within the Multi‐Agency Radiation Survey and Site Investigation Manual (MARSSIM). At RSC, the US ACE developed site‐specific derived concentration guideline level (DCGL) cleanup requirements consistent with the MARSSIM guidance. Because of uncertainty about the distribution of contamination within the creek, the US ACE used the Triad approach to collect data and design remedial actions. Systematic planning helped target the areas of concern, develop a conceptual site model, and identify data gaps to be addressed before remediation plans were finalized. Preremediation sampling and analysis plans were designed to be explicitly consistent with final status survey requirements, allowing data sets to support both excavation planning needs and closure requirements in areas where contamination was not encountered above DCGL standards. Judicious use of real‐ time technologies such as X‐ray fluorescence and gamma walkover surveys minimized expensive off‐ site alpha spectrometry analyses, and at the same time provided the ability to respond to unexpected field conditions. © 2004 Wiley Periodicals, Inc.  相似文献   

10.
As the remediation industry rapidly matures, a greater emphasis is placed on providing on-site remedies involving in-situ soil and groundwater technologies. Selecting and implementing cost-effective technologies requires a defined working process focused on integrating the relationship between the design engineer/scientist and the remedial contractor. This article briefly explores various contractual vehicles and their effect on the designer/contractor relationship and identifies preconstruction documents needed to initiate a remedial construction program. A detailed discussion is presented that describes the transition from remedial design to remedial construction and offers practical application of preconstruction, construction, and postconstruction techniques. Preconstruction techniques involve communication processes and procedures designed to reduce installation uncertainty, address constructability issues, promote value engineering alternatives, and reaffirm the project objectives. Construction techniques focus on effective ways to communicate and document problems and solutions encountered during construction activities. Postconstruction techniques describe ways to provide useful information that may have a continued effect on system performance or used to document the achievement of project goals.  相似文献   

11.
12.
The US Sustainable Remediation Forum (SURF) created a compilation of metrics (Metrics Toolbox) in response to a need for a broad set of metrics that could be used to assess and monitor the effectiveness of remedies in achieving sustainability goals. Metrics are the key impacts, outcomes, or burdens that are to be assessed or balanced to determine the influences and impacts of a remedial action. Metrics can reflect any of the three aspects of sustainability (i.e., environmental, social, or economic) or a combination of these aspects. Regardless, metrics represent the most critical sustainable outcomes from the perspective of the key stakeholders. The Metrics Toolbox is hosted online at www.sustainableremediation.org/library/guidance‐tools‐and‐other‐resources . By selecting metrics from the Metrics Toolbox as a starting point and considering a potentially wider suite of metrics in remedial program decisions, appropriate assessments can be made. Qualitative and quantitative metrics are tabulated for each remedial phase: remedial investigation, remedy selection, remedial design, remedial construction, operation and maintenance, and closure. Attributes for each metric are described so that remediation practitioners and key stakeholders can view the universe of metrics available and select the most relevant, site‐specific metrics for a particular site. For this reason, SURF recommends that remediation practitioners consider the metrics compiled in the Metrics Toolbox as a companion to the sustainable remediation framework published elsewhere in this journal and other sustainability evaluations. © 2011 Wiley Periodicals, Inc.  相似文献   

13.
A former natural gas processing station is impacted with total petroleum hydrocarbons (TPH) and benzene. Remedial process optimization (RPO) was conducted to evaluate the effectiveness of the historical air sparging/soil vapor extraction (AS/SVE) system and the current groundwater extraction and treatment system. The RPO indicated that both remedial activities offered no further benefit in meeting remediation goals. Instead, an in situ chemical oxidation (ISCO) system was recommended. Ozone was selected, and the results of a bench test indicated that the ozone demand was 8 to 12 mg ozone/mg TPH and that secondary by‐products would include hexavalent chromium and bromate. A capture zone analysis was conducted through groundwater flow modeling (MODFLOW) to ensure containment of the injected oxidant using the existing groundwater extraction system. Results of a pilot study indicated that the optimum frequency of ozone sparging is 60 minutes in order to reach a maximum radius of influence of 20 feet. TPH concentrations within the treatment zone decreased by 97 percent over two months of ozone sparging. Concentrations of hexavalent chromium and bromate increased from nondetect to 44 and 110 mg/L, respectively, during the ozone sparging but attenuated to nondetectable concentrations within three months of system shut down. ©2016 Wiley Periodicals, Inc.  相似文献   

14.
In response to an oxygenated gasoline release at a gas station site in New Hampshire, a temporary treatment system consisting of a single bedrock extraction well, a product recovery pump, an air stripper, and carbon polishing units was installed. However, this system was ineffective at removing tertiary butyl alcohol from groundwater. The subsequent remedial system design featured multiple bedrock extraction wells and an ex situ treatment system that included an air stripper, a fluidized bed bioreactor, and carbon polishing units. Treated effluent was initially discharged to surface water. Periodic evaluation of the remediation system performance led to system modifications, which included installing an additional extraction well to draw contaminated groundwater away from an on‐site water supply well, adding an iron and manganese pretreatment system, and discharge of treated effluent to an on‐site drywell. Later, the air stripper and carbon units were eliminated, and an infiltration gallery was installed to receive treated, oxygenated effluent in order to promote flushing of the smear zone and in situ bioremediation in the source area. This article discusses the design, operation, performance, and modifications to the remediation system over time, and provides recommendations for similar sites. © 2007 Wiley Periodicals, Inc.  相似文献   

15.
A new technique has been developed to immobilize organic chemicals at a Superfund site. In the course of predesign studies in preparing the Remedial Design for the Pioneer Sand Superfund site in Pensacola, Florida, a light, nonaqueous phase liquid (LNAPL) was discovered floating on the groundwater within the on-site landfill. The liquid, with a viscosity similar to SAE 20 motor oil, was made up of heavy organic chemicals and volatile organic chemicals (VOCs), but no pesticides or polychlorinated biphenyls (PCBs). The volatiles present included toluene, ethylbenzene, and xylenes. Regulatory agencies expressed concern over the possibility of LNAPL migration and asked that a method of LNAPL immobilization be devised.  相似文献   

16.
The soil and two aquifers under an active lumber mill in Libby, Montana, had been contaminated from 1946 to 1969 by uncontrolled releases of creosote and pentachlorophenol (PCP). In 1983, because the contaminated surface soil and the shallower aquifer posed immediate risks to human health and the natural environment, the U.S. Environmental Protection Agency placed the site on its National Priorities List. Feasibility studies in 1987 and 1988 determined that in situ bioremediation would help clean up this aquifer and that biological treatment would help clean up the contaminated soils. This article outlines the studies that led to a 1988 EPA record of decision and details the EPA-approved remedial plan implemented starting in 1989; EPA estimates a total cost of about $15 million (in 1988 dollars). The plan involves extensive excavation and biological treatment of shallow contaminated soils in two lined and bermed land treatment units, extraction of heavily contaminated groundwater, an aboveground bioreactor treatment system, and injection of oxygenated water to the contaminant source area, as well as to other on-site areas affected by the shallower aquifer's contaminant plume.  相似文献   

17.
Expert software-based decision support is speeding the process of defining environmental hazards and identifying remedial responses for the U.S. Department of Energy's (DOE) hazardous waste cleanup projects throughout the United States. Pacific Northwest Laboratories' (PNL) Remedial Action Assessment System (RAAS), and associated Technology Information System (TIS), written for Macintosh computers (soon for PC-compatible computers), sort through an encyclopedic data base to help environmental engineers prepare the most appropriate remedial strategy. The system has been available to DOE and other U.S. government engineers since last year and will soon be commercially available.  相似文献   

18.
The Bog Creek Farm CERCLA (Superfund) site in Howell Township, New Jersey, was extensively contaminated, allegedly with wastes from paint manufacturing. The site contained two types of incinerable wastes: contaminated soils and sediments. A remedial investigation and feasibility study (RI/FS) was conducted, leading to a recommendation to treat the most contaminated areas by incineration. This recommendation was converted into the selected approach through the Record of Decision (ROD) mechanism. Contaminants at the Bog Creek Farm site included a wide range of volatiles, semivolatiles, and heavy metals. The incineration approach chosen, therefore, had to remove the organics from the soil without creating additional problems associated with heavy metals emissions. In order to evaluate the incineration problem and develop an advisory conceptual design for its solution, Ebasco Services Incorporated performed extensive characterizations of the material. Such characterizations included performing proximate and ultimate analyses and determining other key physical, chemical, and thermodynamic properties of the soils and sludges. Energy and Environmental Research Corporation (EER) then performed treatability studies in its rotary kiln test incinerator. These treatability studies focused upon the rotary kiln, and the environment required for cleaning the soil. They assumed that contaminants in the vapor phase could be destroyed in the afterburner. Tests were conducted at bed temperatures of 1,000°F, 1,460°F, and 1,800°F. Samples were drawn from the kiln at intermediate times. Combustion regimes were therefore constructed for the treatment of Bog Creek Farm wastes, maximizing organic removal while managing the heavy metals problem. Ebasco then converted the results of the incinerability or treatability studies into an advisory conceptual design. This advisory conceptual design called for a kiln temperature of 1,600°F (bed temperature of 1,200°F) and a solids residence time in the kiln of 40 minutes. Additional data indicated that the afterburner could operate at 1,800°F in order to ensure destruction of the POHCs. Combustion chemistry fundamentals demonstrated that the minimum afterburner temperature required was 1,650°F. Ebasco converted this conceptual design into a performance specification to be used in the bid process, under the management of the U.S. Army Corps of Engineers. The remediation was then put out to bid. Chemical Waste Management was the successful bidder. The incineration was successfully completed by August 1990; the system was then demobilized, as the site was remediated.  相似文献   

19.
The use and performance of soil vapor extraction (SVE) as an in-situ remedial technology has been limited at numerous sites because of both geologic and chemical factors. SVE systems are not well suited to sites containing low permeability soils or sites contaminated with recalcitrant compounds. Six-phase soil heating (SPSH) has been developed by the Battelle Pacific Northwest Laboratories (Battelle) to enhance SVE systems. The technology utilizes resistive soil heating to increase the vapor pressure of subsurface contaminants and to generate an in-situ source of steam. The steam strips contaminants sorbed onto soil surfaces and acts as a carrier gas, providing an enhanced mechanism by which the contaminants can reach an extraction well. Full-scale applications of SPSH have been performed at the U.S. Department of Energy's Savannah River Site in Aiken, South Carolina; at a former fire training site in Niagara Falls, New York; and at Fort Richardson near Anchorage, Alaska. At each site, chlorinated solvents were present in low permeability soils and SPSH was applied in conjunction with SVE. The results of the three applications showed that SPSH is a cost-effective technology that can reduce the time required to remediate a site using only conventional SVE.  相似文献   

20.
A common industrial solvent additive is 1,4‐dioxane. Contamination of dissolved 1,4‐dioxane in groundwater has been found to be recalcitrant to removal by conventional, low‐cost remedial technologies. Only costly labor and energy‐intensive pump‐and‐treat remedial options have been shown to be effective remedies. However, the capital and extended operation and maintenance costs render pump‐and‐treat technologies economically unfeasible at many sites. Furthermore, pump‐and‐treat approaches at remediation sites have frequently been proven over time to merely achieve containment rather than site closure. A major manufacturer in North Carolina was faced with the challenge of cleaning up 1,4‐dioxane and volatile organic compound–impacted soil and groundwater at its site. Significant costs associated with the application of conventional approaches to treating 1,4‐dioxane in groundwater led to an alternative analysis of emerging technologies. As a result of the success of the Accelerated Remediation Technologies, LLC (ART) In‐Well Technology at other sites impacted with recalcitrant compounds such as methyl tertiarybutyl ether, and the demonstrated success of efficient mass removal, an ART pilot test was conducted. The ART Technology combines in situ air stripping, air sparging, soil vapor extraction, enhanced bioremediation/oxidation, and dynamic subsurface groundwater circulation. Monitoring results from the pilot test show that 1,4‐dioxane concentrations were reduced by up to 90 percent in monitoring wells within 90 days. The removal rate of chlorinated compounds from one ART well exceeded the removal achieved by the multipoint soil vapor extraction/air sparging system by more than 80 times. © 2005 Wiley Periodicals, Inc.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号