首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到3条相似文献,搜索用时 0 毫秒
1.
River damming provides a dominant human impact on river environments worldwide, and while local impacts of reservoir flooding are immediate, subsequent ecological impacts downstream can be extensive. In this article, we assess seven research strategies for analyzing the impacts of dams and river flow regulation on riparian ecosystems. These include spatial comparisons of (1) upstream versus downstream reaches, (2) progressive downstream patterns, or (3) the dammed river versus an adjacent free-flowing or differently regulated river(s). Temporal comparisons consider (4) pre- versus post-dam, or (5) sequential post-dam conditions. However, spatial comparisons are complicated by the fact that dams are not randomly located, and temporal comparisons are commonly limited by sparse historic information. As a result, comparative approaches are often correlative and vulnerable to confounding factors. To complement these analyses, (6) flow or sediment modifications can be implemented to test causal associations. Finally, (7) process-based modeling represents a predictive approach incorporating hydrogeomorphic processes and their biological consequences. In a case study of Hells Canyon, the upstream versus downstream comparison is confounded by a dramatic geomorphic transition. Comparison of the multiple reaches below the dams should be useful, and the comparison of Snake River with the adjacent free-flowing Salmon River may provide the strongest spatial comparison. A pre- versus post-dam comparison would provide the most direct study approach, but pre-dam information is limited to historic reports and archival photographs. We conclude that multiple study approaches are essential to provide confident interpretations of ecological impacts downstream from dams, and propose a comprehensive study for Hells Canyon that integrates multiple research strategies.  相似文献   

2.
General surveys of the benthic macroinvertebrates from Piceance Creek and the White River were conducted for nearly a decade prior to oil-shale exploitation in north central Colorado, USA. Comparison of the taxa collected in four studies on Piceance Creek and five studies on the White River shows little similarity among most studies. Studies were generally consistent in methods, site selection, and time of year for collection. Lack of agreement among the studies on what constitutes a baseline of common taxa is probably a result of taxonomic difficulties and differences in technique. More emphasis should be placed on testing possible impacts than on repeated, expensive, and inconclusive baseline inventories.  相似文献   

3.
In developing countries, large dam projects continue to be launched, primarily to secure a time-stable freshwater supply and to generate hydropower. Meanwhile, calls for environmentally sustainable development put pressure on the dam-building industry to integrate ecological concerns in project planning and decision-making. Such integration requires environmental impact statements (EISs) that can communicate the societal implications of the ecological effects in terms that are understandable and useful to planners and decision-makers. The purpose of this study is to develop a basic framework for assessing the societal implications of the river ecological effects expected of a proposed large dam project. The aim is to facilitate a comparison of desired and potential undesired effects on-site and downstream. The study involves two main tasks: to identify key river goods and services that a river system may provide, and to analyze how the implementation of a large dam project may alter the on-site capacity and downstream potentials to derive river goods and services from the river system. Three river goods and six river services are identified. River goods are defined as extractable partly man-made products and river services as naturally sustained processes. By four main types of flow manipulations, a large dam project improves the on-site capacity to derive desired river goods, but simultaneously threatens the provision of desirable river goods and services downstream. However, by adjusting the site, design, and operational schedule of the proposed dam project, undesirable effects on river goods and services can be minimized.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号