首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 0 毫秒
1.
ABSTRACT. Flood detention reservoir design is a common problem encountered by engineers and others involved with water resources problems. This paper presents a method by which the volume of flood storage required for a single reservoir or a series of reservoirs may be estimated without using numeric flood-routing techniques. The proposed procedure requires a minimum of computations and is most applicable to preliminary design situations where a high degree of accuracy is not required.  相似文献   

2.
ABSTRACT: Region‐of‐influence (RoI) approaches for estimating stream flow characteristics at ungaged sites were applied and evaluated in a case study of the 50‐year peak discharge in the Gulf‐Atlantic Rolling Plains of the southeastern United States. Linear regression against basin characteristics was performed for each ungaged site considered based on data from a region of influence containing the n closest gages in predictor variable (PRoI) or geographic (GRoI) space. Augmentation of this count based cutoff by a distance based cutoff also was considered. Prediction errors were evaluated for an independent (split‐sampled) dataset. For the dataset and metrics considered here: (1) for either PRoI or GRoI, optimal results were found when the simpler count based cutoff, rather than the distance augmented cutoff, was used; (2) GRoI produced lower error than PRoI when applied indiscriminately over the entire study region; (3) PRoI performance improved considerably when Rol was restricted to predefined geographic subregions.  相似文献   

3.
ABSTRACT: Although our current (1990) knowledge of hydrologic and hydraulic processes is based on many years of study, there are river environments where these processes are complex and poorly understood. One of these environments is in mountainous areas, which cover about 25 percent of the United States. Use of conventional hydrologic and hydraulic techniques in mountain-river environments may produce erroneous results and interpretations in a wide spectrum of water-resources investigations. An ongoing U.S. Geological Survey research project is being conducted to improve the understanding of hydrologic and hydraulic processes of mountainous areas and to improve the results of subsequent hydrologic investigations. Future hydrologic and hydraulic research needs in mountainous areas are identified.  相似文献   

4.
ABSTRACT: The accurate and reliable determination of floodplains, floodway boundaries, and flood water elevations are integral requirements of Flood Insurance Studies. These studies are intended to be used for determining the flood insurance rates. Therefore, the accuracy of the water surface profiles are important. To ensure the high degree of accuracy, the HUD Flood Insurance Administration has developed standards which must be met in the analysis of water surface profiles. A somewhat less accurate study is required for the preparation of Flood Emergency Plans. As part of the flood insurance studies of eight locations in the State of North Dakota, various flood hazard and floodplain information reports were reviewed. The hydrologic and hydraulic analyses, especially the computation of the 100-year water surface profiles, were completed using both simplified and complex hydraulic computation methods. Significant differences were found (1 to 3 feet) between the profiles computed by the SCS simplified method and those computed by HEC-2 computer program. However, the floodplain boundaries determined by both methods were found to be similar. Approximate methods are recommended for rapid determination of the floodplain, floodway boundaries, and inundation area mapping, while sophisticated computer programs (HEC-2) are recommended to be used for developing areas where the 100-year flood elevation has a significant impact on the cost of land development.  相似文献   

5.
ABSTRACT: Winter Creek is a tributary of the Washita River in south-western Oklahoma. The Soil Conservation Service installed floodwater retarding structures which controlled runoff from 56 percent of a 33-square-mile (8550-hectare) gaged drainage area. Application of a hydrologic model to the flood peaks indicated that the structural treatment reduced the flood peaks an average of 61 percent. The Winter Creek channel has narrowed and deepened since the structural treatment was applied. The severe bank erosion occurring before treatment has been arrested and sediment yield from the watershed has been reduced 50 to 60 percent. In some reaches of the channel there has been a dense growth of trees in recent years.  相似文献   

6.
ABSTRACT: Floodwater-retarding impoundments, controlling 68 percent of the drainage area of Tonkawa Creek, a Washita River tributary in southwestern Oklahoma, have reduced the total flow volume about 36 percent over a 5-year period. Analyses showed the reduction occurred primarily in the less-than-2.5-cfs flow range, indicating the base flow regime has been altered. However, channelizing the downstream, mild-sloped, 3.6 miles of Tonkawa Creek that flows across a Washita River terrace increased the flow volume fourfold at the outlet. A double-masscurve analysis of water yield from a 1,127-square-mile Washita basin segment versus an untreated tributary showed the yield has not changed after 25 percent of the tributary area had been treated. Therefore, the flow reduction caused by structures is being offset by increased yields from channelization.  相似文献   

7.
ABSTRACT: Methods of computing probabilities of extreme events that affect the design of major engineering structures have been developed for most failure causes, but not for design floods such as the probable maximum flood (PMF). Probabilities for PMF estimates would be useful for economic studies and risk assessments. Reasons for the reluctance of some hydrologists to assign a probability to a PMF are discussed, and alternative methods of assigning a probability are reviewed. Currently, the extrapolation of a frequency curve appears to be the most practical alternative. Using 46 stations in the Mid-Atlantic region, the log-gamma, log-normal, and log-Gumbel distributions were used to estimate PMF probabilities. A 600,000-year return period appears to be a reasonable probability to use for PMFs in the Mid-Atlantic region. The coefficient of skew accounts for much of the variation in computed probabilities.  相似文献   

8.
ABSTRACT: Hydrologic and economic information must be integrated in flood plain management. This study describes an integrated approach which includes consideration of the hydrologic, hydrodynamic, physical, and economic components of the total system. On the basis of these components, a theoretical model is proposed which provides a rational procedure for estimating flood damages from projections of economic development within an area. The utility of the model is demonstrated by applying it to a flood-prone region in Southern Quebec, Canada.  相似文献   

9.
ABSTRACT: A regression analysis using a generalized least squares approach on flow data from the driftless area of Wisconsin indicates that the ratio of drainage area to time-to-peak is a good predictor of flood quantiles. The estimation of time-to-peak (or some other measure of basin response time) requires direct measurement of river stage and possibly rainfall at the site of which the quantiles are to be estimated. The cost-effectiveness of such an approach must yet be determined.  相似文献   

10.
ABSTRACT: Various techniques, one of which is zoning, are used to control the extent of flood damage. The benefit-cost analysis of zoning programs must take into account the random nature of flooding. This paper outlines a method for determining not only the expected value of the benefit-cost ratio, but also the probability of such a zoning program being profitable. It also presents an application of the method to the assessment of the Outaouais Regional Community zoning program.  相似文献   

11.
Regional procedures to estimate flood magnitudes for ungaged watersheds typically ignore available site-specific historic flood information such as high water marks and the corresponding flow estimates, otherwise referred to as limited site-specific historic (LSSH) flood data. A procedure to construct flood frequency curves on the basis of LSSH flood observations is presented. Simple inverse variance weighting is employed to systematically combine flood estimates obtained from the LSSH data base with those from a regional procedure to obtain improved estimtes of flood peaks on the ungaged watershed. For the region studied, the variance weighted estimates of flow had a lower logarithmic standard error than either the regional or the LSSH flow estimates, when compared to the estimates determined by three standard distributions for gaged watersheds investigated in the development of the methodology. Use of the simple inverse variance weighting procedure is recommended when “reliable” estimates of LSSH floods for the ungaged site are available.  相似文献   

12.
ABSTRACT: We analyzed the type of hydrologic adjustments resulting from flow regulation across a range of dam types, distributed throughout the Connecticut River watershed, using two approaches: (1) the Index of Hydrologic Alteration (IHA) and (2) log‐Pearson Type III flood frequency analysis. We applied these analyses to seven rivers that have extensive pre‐and post‐disturbance flow records and to six rivers that have only long post‐regulation flow records. Lastly, we analyzed six unregulated streams to establish the regional natural flow regime and to test whether it has changed significantly over time in the context of an increase in forest cover from less than 20 percent historically to greater than 80 percent at present. We found significant hydrologic adjustments associated with both impoundments and land use change. On average, maximum peak flows decrease by 32 percent in impounded rivers, but the effect decreases with increasing flow duration. One‐day minimum low flows increase following regulation, except for the hydro‐electric facility on the mainstem. Hydrograph reversals occur more commonly now on the mainstem, but the tributary flood control structures experience diminished reversals. Major shifts in flood frequency occur with the largest effect occurring downstream of tributary flood control impoundments and less so downstream of the mainstem's hydroelectric facility. These overall results indicate that the hydrologic impacts of dams in humid environments can be as significant as those for large, multiple‐purpose reservoirs in more arid environments.  相似文献   

13.
ABSTRACT: Hydrologic Transport Assessment System (HYTRAS) is a software package that models contaminant transport in rivers and streams, including volatilization, adsorption/desorption, sedimentation, settling, and resuspension. Biodegradation, photolysis, and any other process that can be modeled using a first‐order decay constant can be included as well. HYTRAS originally modeled the transport of radionuclides and has recently been expanded to include transport of chemicals. The transport of chemicals has been validated using data from an accidental release of the chemicals disulfoton and thiometon into the Rhine River in 1986. For these chemicals, sorption is not an important process. For the range of measured flow velocities, HYTRAS was found to bound the peak arrival times. For the range of measured degradation rates, HYTRAS was found to bound the peak concentrations within 400 km of the source and bound the peak concentrations within a factor of two out to 700 km.  相似文献   

14.
ABSTRACT: The frequent high water levels in Chisago Chain of Lakes, located in east-central Minnesota, have caused extensive flood damages. Recent floods raised the concern of the local property owners and they pressured the Chisago County Board of Managers to initiate a study of alternative lake control levels. A study was carried out to identify potential flood control alternatives, screen out the most promising feasible alternatives, and recommend the most cost-effective flood control measure. Several flood control alternatives were considered - eight of them were analyzed and evaluated in detail. A statistical method was used to estimate the expected annual flood damages under existing and future conditions. The effect of all proposed control measures on the annual flood damage reductions (benefits) were determined. Detailed benefit/cost analyses were carried out to evaluate the economic feasibility of alternatives. The effect of potential flood control measures on the environment was also studied. The economic analysis of the most cost-effective alternative did not strongly support artificial lake level control, therefore the decision-making authorities were even more firm in their position to maintain the present condition and chose the Null Alternative as the most suitable alternative.  相似文献   

15.
ABSTRACT: Flash flooding is the rapid flooding of low lying areas caused by the stormwater of intense rainfall associated with thunderstorms. Flash flooding occurs in many urban areas with relatively flat terrain and can result in severe property damage as well as the loss of lives. In this paper, an integrated one‐dimensional (1‐D) and two‐dimensional (2‐D) hydraulic simulation model has been established to simulate stormwater flooding processes in urban areas. With rainfall input, the model simulates 2‐D overland flow and 1‐D flow in underground stormwater pipes and drainage channels. Drainage channels are treated as special flow paths and arranged along one or more sides of a 2‐D computational grid. By using irregular computation grids, the model simulates unsteady flooding and drying processes over urban areas with complex drainage systems. The model results can provide spatial flood risk information (e.g., water depth, inundation time and flow velocity during flooding). The model was applied to the City of Beaumont, Texas, and validated with the recorded rainfall and runoff data from Tropical Storm Allison with good agreement.  相似文献   

16.
ABSTRACT: Panchromatic black and white, color, and color infrared photographs and thermal infrared imagery are compared for a capability to show flood boundaries. In open agricultural and urban areas, these boundaries are easily delineated on all types of am. Boundaries are more difficult to see in wooded areas. In March, hardwood trees are dormant, but black and white photographs and color photographs show only the tops of these trees. Color infrared photographs in January and March have a distinctive color or tone in inundated woods; the limit of this tone is the flood boundary. Daytime thermal infrared imagery in March shows that inundated woods are cooler than dry land but warmer than open water. After about April 1, both color infrared photography and thermal infrared imagery show only the top of the tree canopy and do not reflect underlying flood water. Inundated areas can be delineated easily on ERTS satellite imagery from December through March. On imagery from May 4–5, 1973, however, most inundation boundaries had to be drawn as dashed lines; the tree canopy obscures flood waters in wooded areas. Despite this problem, the results of mapping flood boundaries on May imagery are believed to be reasonable for the scale of the imagery.  相似文献   

17.
ABSTRACT: This paper presents evidence that currently published flood insurance premiums may be insufficient to cover expected losses in coastal areas subject to hurricane. The problems of developing flood premiums in coastal zones are discussed and Federal Insurance Administration (FIA) reaction to these problems analyzed. Flood losses in the coastal zone of Bay County, Florida due to hurricane Eloise are compared with losses which would be predicted by the FIA. This comparison raises important questions concerning the adequacy of flood premiums in coastal zones and the undesirable indirect effects that underpricing flood risk will have on location decisions in the coastal floodplain.  相似文献   

18.
ABSTRACT: A large storm in December 1990 allowed the evaluation of flood predictions from a hydrologic model (TOPMODEL) that had been previously calibrated on the West Fork of Walker Branch Watershed, a gauged 37.5 ha catchment near Oak Ridge, Tennessee. The model predicts both hydrograph dynamics and the spatial distribution of overland flow using an index based on topography. Maximum extent of overland flow during the storm was determined from patterns of leaf litter removal from valley bottoms. Both the flood hydrograph and the extent of overland flow were accurately predicted using model parameters obtained from a three-month period of normal flow conditions during 1983.  相似文献   

19.
ABSTRACT: The Hydrologic Engineering Center, Corps of Engineers, has been engaged in research, training, and project assistance in non-structural flood control planning for Corps offices across the United States since 1975. Lessons learned from this experience deal with the role of nonstructural measures in flood plain management, the role of creativity in analysis, the role of analysis, and tools for analysis. The role of nonstructural measures in flood control planning depends upon the scale of the problem, the nature of the measure, the degree of protection desired, and whether damage is to existing or future property. An earnest seeking for nonstructural opportunities, a field presence for their formulation, and compatbility with local infrastructure plans are prerequisite to creative use of nonstructural measures. Analysis is a necessary complement of creativity. Several tools for nonstructural analysis have been developed and applied to flood problems involving several hundred and several thousand structures.  相似文献   

20.
ABSTRACT: A semi-distributed deterministic model for real-time flood forecasting in large basins is proposed. Variability of rainfall and losses in space is preserved and the effective rainfall-direct runoff model segment based on the Clark procedure is incorporated. The distribution of losses in space is assumed proportional to rainfall intensity and their evolution in time is represented by the φ-index; furthermore, an initial period without production of effective rainfall is considered. The first estimation of losses and the associated forecasts of flow are performed at the time corresponding to the first rise observed in the hydrograph. Then the forecasts of flow are corrected at each subsequent time step through the updating of the φ-index. The model was tested by using rainfall-runoff events observed on two Italian basins and the predictions of flow for lead times up to six hours agree reasonably well with the observations in each event. For example, for the coefficient of persistence, which compares the model forecasts with those generated by the no-model assumption, appreciable positive values were computed. In particular, for the larger basin with an area of 4,147 km2, the mean values were 0.4, 0.4 and 0.5 for forecast lead times of two hours, four hours and six hours, respectively. Good performance of the model is also shown by a comparison of its flow predictions with those derived from a unit hydrograph based model  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号