首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 281 毫秒
1.
When the cold war ended, the United States stopped developing,testing and building nuclear weapons at nearly all of its former nuclear weapon sites. The Department of Energy (DoE) began a massive environmental remediation programme, which includes engaging surrounding communities in a future land use planning process. Using the Savannah River site as an example, we show that this process faces large obstacles, especially a legacy of mistrust of the DoE and organizational limitations at the federal and local government scales. These hinder open dialogue about future land use. The authors suggest three planning principles for future land use planning and organizational issues that must be addressed before these can be fruitfully explored.  相似文献   

2.
This paper assesses the Bluff oyster fishery in New Zealand as a case study in common pool resource management. It discusses ways in which modern information technology, augmented by low-tech data gathering strategies and community ethnography, can be used to produce an integrated scientific and local knowledge-inspired fishery database that lends itself to fostering collaboration in resource management and planning. The specific context and state of the oyster fishery in Bluff are described. Issues regarding undocumented and ephemeral intergenerational knowledge, much of which is geospatial in nature, on the fishery, the current crisis that many see in the future of the fishery, and a lack of cohesion or common sense of purpose between the stakeholder groups are discussed. It is argued that the digital resource that results from the integration of local and scientific knowledge and the potential community building processes that can ensue from collaboration and dialogue around this centrepiece are of central importance in developing an oyster fishery management plan that is holistic in concept and sustainable in purpose.  相似文献   

3.
This article describes the collaborative modeling process and the resulting water resources planning model developed to evaluate water management scenarios in the transboundary Rio Grande basin. The Rio Grande is a severely water stressed basin that faces numerous management challenges as it crosses numerous jurisdictional boundaries. A collaborative process was undertaken to identify and model water management scenarios to improve water supply for stakeholders, the environment, and international obligations of water delivery from Mexico to the United States. A transparent and open process of data collection, model building, and scenario development was completed by a project steering committee composed of university, nongovernmental, and governmental experts from both countries. The outcome of the process was a planning model described in this article, with data and operations that were agreed on by water planning officials in each country. Water management scenarios were created from stakeholder input and were modeled and evaluated for effectiveness with the planning model.  相似文献   

4.
A review of the use of planning and design briefs by local authorities in the United Kingdom was carried out in 1982–83 to test whether the role of the brief as an instrument of local policy and as a promotional tool in the development process was being fully exploited. The paper provides a state of the art review, presents a summary of the findings and offers some comments on the results. It concludes that most authorities now use briefs as part of their normal planning procedures, but that there is potential which is not yet being exploited.  相似文献   

5.
Effective Protection of Open Space: Does Planning Matter?   总被引:2,自引:0,他引:2  
High quality plans are considered a crucial part of good land use planning and often used as a proxy measure for success in plan implementation and goal attainment. We explored the relationship of open space plan quality to the implementation of open space plans and attainment of open space protection goals in Research Triangle, North Carolina, USA. To measure plan quality, we used a standard plan evaluation matrix that we modified to focus on open space plans. We evaluated all open space plans in the region that contained a natural resource protection element. To measure plan implementation and open space protection, we developed an online survey and administered it to open space planners charged with implementing the plans. The survey elicited each planner’s perspective on aspects of open space protection in his or her organization. The empirical results (1) indicate that success in implementation and attaining goals are not related to plan quality, (2) highlight the importance of when and how stakeholders are involved in planning and implementation processes, and (3) raise questions about the relationship of planning to implementation. These results suggest that a technically excellent plan does not guarantee the long-term relationships among local landowners, political and appointed officials, and other organizations that are crucial to meeting land protection goals. A greater balance of attention to the entire decision process and building relationships might lead to more success in protecting open space.  相似文献   

6.
In 1998 the Washington State Legislature enacted the Watershed Planning Act, which encourages local governments to develop watershed plans using collaborative processes. Objectives of the statute are to address water resource and water quality issues, salmon habitat needs and to establish instream flows. This exploratory study sought to examine two aspects of how local governments are implementing the Act: challenges and benefits associated with collaborative watershed planning and the capacity of local governments to conduct collaborative watershed planning. Using documents and interview data from four cases, it was found that all planning groups experience similar challenges, although newer planning groups experienced more challenges than groups with previous planning experience. Challenges include issues surrounding the collaborative process, interagency co-ordination and trust. Local governments struggle with building capacity to plan, particularly in the areas of funding, technical expertise, incentives for participation, adequate time to conduct planning and questions regarding appropriate scale and scope of their planning efforts. Despite the challenges, collaborative watershed planning is well underway, with more than 37 planning units conducting planning under the Act.  相似文献   

7.
This paper considers the contribution of computing to the implementation of a policy of partnership between public environmental agencies and local voluntary groups. The present policy commitment to partnerships of this kind is reviewed. Particular information needs arise when public agencies seek to give co‐ordinated support to the environmental action undertaken by local groups. These stem from the disaggregated nature of the structure and functions of the voluntary sector. Computer‐based information systems are identified as a bridge between the regional organisation of public agencies and the local activities of voluntary groups. A computer system devised to aid the forward planning of public support for voluntary action is described. It is considered that this technique has value as part of a wider strategy of interaction between the public and voluntary sectors.  相似文献   

8.
This paper suggests a number of benefits in identifying urban and regional planners as a public in public participation programs of water resources planning studies. A perspective on public participation is presented. Recent trends and developing concepts are identified: emphasis on the need to coordinate urban and regional planning activities with water resources planning, increasing system complexity, the goals and objectives orientation of planning, planning for multi-objectives, the evaluation of a broader range of alternatives, and the consideration of water alternatives as only one set of measures to further society's aspirations. One way to assist in capitalizing on these trends is to seek out participation of those in other planning efforts who are involved in planning but on a different level. Because of their intimate knowledge of an areas history, growth and development, political climate, local perceptions of needs and desires, and major problems and issues they are able to contribute a great deal of insight in making the water resources planning effort more responsive at the local level. The paper describes one of the first major efforts at working-level public-planner contact which was carried out as part of the Susquehanna River Basin Study. A regional survey team comprised of an engineer and an economist from a federal agency and a state water resources planner met informally with planners, city managers, and local planning commissions to discuss issues related to water resources and the growth and development of local areas. This effort while only part of the overall public participation program yielded a number of benefits and if expanded and refined would be a very useful experience in other studies.  相似文献   

9.
This article is the third in a series prepared to explain the Teller County growth management planning process. Once it was determined by local decision-makers that Teller County, Colorado, would pursue a policy of directed growth, concepts based on this policy were developed. These concepts presented visions and options for the future. Landscape plans then were developed for Teller County and the City of Woodland Park planning area so that these options could be visualized by local leaders and the public. The landscape plans were used as part of the ongoing citizen involvement process to inform the public about the options for growth management. To provide even more information, detailed designs were developed for specific areas in the county. From the landscape plan, public involvement effort, and detailed designs, specific implementation measures were identified, discussed, and adopted. These measures included guidelines for administration, so that county and city goals could be linked to the actual day-to-day management of development proposals. Paper 3 in a series of 3.  相似文献   

10.
The paper outlines the emerging effects of the Information Technological revolution and examines the likely consequences for planning in Britain. A number of possible scenarios are described as a basis for thinking about the design of a new planning system for the future.  相似文献   

11.
哈密地区在未来优势资源转换战略,社会经济跨越式发展过程中,将如何面对脆弱的生态环境,日益突出的工业污染以及局部区域环境质量恶化的状况。文章对加快地区生态规划建设,寻求解决生态建设中存在的问题以及完成"十二五"期间生态建设目标和任务的对策做了阐述。并就加强生态保护监督与管理、生态基础建设和加强农村生态建设与保护等方面进行了分析探讨。  相似文献   

12.
During the second half of the 1990s the combination of ecological and economic targets in industrial land‐use planning became an official part of spatial‐economic policy in the Netherlands. A growing number of business locations are now being developed or re‐developed as ‘sustainable business sites’. At the same time, ‘parkmanagement’ came into existence as a new tool for development and control of business sites for industry and services. Parkmanagement is now regarded as one of the obvious instruments to realize sustainable (or ‘careful’) land use on business parks. However, there is now a question about whether it is wrong for local governments (which in the Dutch case are responsible for most land development schemes) to have so much participation in parkmanagement initiatives. There is a threat that local governments are welcoming parkmanagement as a fashionable way to impose new regulations on business establishments, and ignore the evidence from practice. Such evidence shows that parkmanagement is most successful when organized with the involvement of private enterprises. This would also be more in line with the modern interaction‐oriented planning theory (consensus planning). The paper describes the principal dilemmas facing local governments in business site development, the theoretical options for influencing the development process of the sites, and the set of actions that could be part of a parkmanagement strategy. These can be arranged on a ‘ladder’ or range of activities, from rather simple facilities serving individual companies' needs, such as maintenance and security, to more complex co‐operation projects in combined transport or energy supply, and ultimately lead to schemes for connecting material flows of production processes. The successive stages of the ladder of business site facilities can be combined with different forms and stages of process organization.  相似文献   

13.
A warmer climate leads to rising sea levels. Despite uncertainties about how rapid and substantial future sea-level rise (SLR) will be, society needs to prepare and adapt. This study examines the state of planning for future SLR in Sweden by surveying 33 coastal municipalities in southern Sweden and interviewing local, regional and national authorities with relevant accountability. The results reveal that there are considerable gaps in current planning for SLR. Almost one-third of municipalities lack guiding planning documents for SLR, and more than two-thirds do not discuss SLR beyond 2100. We argue that the prevailing uncertainty and ambiguity in assessments of future SLR is problematic within a traditional “predict-then-act” paradigm, and that robust approaches, such as scenario planning, can reduce many of these problems.  相似文献   

14.
The need for enhanced environmental planning and management for highland aquatic resources is described and a rationale for integrated action planning is presented. Past action planning initiatives for biodiversity conservation and wetland management are reviewed. A reflective account is given of integrated action planning from five sites in China, India and Vietnam. Eight planning phases are described encompassing: stakeholder assessment and partner selection; rapport building and agreement on collaboration; integrated biodiversity, ecosystem services, livelihoods and policy assessment; problem analysis and target setting; strategic planning; planning and organisation of activities; coordinated implementation and monitoring; evaluation and revised target setting. The scope and targeting of actions are evaluated using the Driving forces, Pressures, State, Impacts and Responses framework and compatibility with biodiversity conservation and socio-economic development objectives are assessed. Criteria to evaluate the quality of planning processes are proposed. Principles for integrated action planning elaborated here should enable stakeholders to formulate plans to reconcile biodiversity conservation with the wise use of wetlands.  相似文献   

15.
ABSTRACT: This paper draws on interviews with Washington State Watershed Planning Leads (Planning Leads) and interactions with local watershed planning units to identify factors that may influence the inclusion of climate change in watershed planning efforts in Washington State. These factors include the interest of individual planning unit members in climate change; Planning Lead familiarity with climate impacts; the influence of trust, leadership, and “genetic knowledge” on planning units; and perceptions of strategic gain. The research also identifies aspects of the planning process that may create opportunities for addressing climate impacts in future planning. These aspects include continuation of watershed planning units after plans are developed; commitment to updating watershed plans; recognition of climate impacts in planning documentation; dedicated incentive funding; and the availability of hydrologic modeling tools for assessing hydrologic impacts. Additional types of technical assistance that could support integration of climate impacts are also identified. It is hoped that the insight provided by this analysis will help individuals involved in stakeholder‐based watershed planning recognize the various dynamics potentially affecting the inclusion of climate change in watershed planning and in doing so, contribute to the development of planning approaches and tools that will support local efforts to adapt to climate impacts.  相似文献   

16.
ABSTRACT: A process for planning at the field offices of Federal water resources agencies is described. The process involve s both planners and publics in the following four planning activities: problem definition, formulation of alternatives, impact analysis and evaluation (or plan ranking). Evaluative factors are defied as the goals, concerns, constraints, etc. that affected publics and other decision makers consider in ranking alternative actions. These factors serve to drive the entire process and glue the four planning activities together. In contrast to other “models” of the planning process, the four activities are considered to be carried out simultaneously and continually from the beginning of the process. As the planning process proceeds, each activity is repeated a number of times at increasing levels of detail. Various aspects of the process are illustrated by means of an example involving water resources development in Carmel Valley, California.  相似文献   

17.
本文结合重庆市空气质量限期达标规划编制案例,介绍了城市空气质量达标规划编制中的几个关键技术及其具体应用,包括本地化污染源排放清单编制、污染物来源解析、污染物排放形势预测与减排潜力分析以及大气环境容量核算等。本地化污染源排放清单是城市空气质量达标规划编制的基础,针对现有污染源制定科学合理的减排方案是达标规划的核心内容。分析不同区域的污染物组分浓度特征、污染源贡献以及未来污染排放形势预测,有助于识别出制约未来空气质量达标的关键因素及污染源。基于污染源减排潜力和污染传输矩阵制定的污染源减排方案更具合理性和可行性,应用空气质量模型估算大气环境容量可为规划目标可达性提供依据。  相似文献   

18.
There is a growing concern about integrating biodiversity into urban planning, yet, discussions are concentrated on science-informed planning in general. Few have explored the integration of biodiversity in specific planning instruments, especially in African cities. This paper examines how and what components of biodiversity are integrated into master plans, medium-term plans, building codes, zoning codes and permits in Kumasi City, Ghana. There is limited integration of biodiversity in most planning instruments as they were mostly designed on the basis of health, safety and economy. Allied to lack of funding and public participation, biodiversity in Kumasi is under significant threat from rapid urban development. Creating an opportunity for popular participation and decentralizing the planning system could set the preconditions for local integration and revision of instruments. Simplifying the definition of biodiversity could increase local planners’ appreciation, understanding and their ability to make use of biodiversity data.  相似文献   

19.
Wildlife managers are increasingly faced with planning and implementing wildlife management programs in collaboration with local governments, user groups, businesses and citizens. The planning process is inherently political as each group attempts to advance its interests. Current scholarship on the theory and practice of planning for wildlife management falls short of accounting for the politics of these processes. It is hoped that this paper will contribute to a theory of planning that both addresses the actual practices of wildlife planners and serves as a guide for future action. To this end, the dominant conceptualization of wildlife planning will be outlined and the study will draw on empirical and theoretical advances in the fields of adult education, organizational analysis and regional planning to construct a more politically-informed theoretical framework for understanding wildlife planning. This framework asserts that planning involves two types of negotiation of power and interests: (1) substantive negotiations which address procedural aspects of planning and (2) meta-negotiations which address political dynamics of planning. An earlier study will then be re-analyzed to illustrate how substantive and meta-negotiations occurred in a case of suburban deer management in the Northeast United States. It is concluded that accounting for issues of power and interests in wildlife planning theory provides a more complete representation of what wildlife managers actually do when planning programs and provides a guide for future wildlife planning practice. Future analyses of planning processes in wildlife management, or natural resources management more broadly, may reveal new insights if the concepts used to guide the analysis reported here provide an understanding of the politics involved.  相似文献   

20.
Managing carbon emissions in China through building energy efficiency   总被引:1,自引:0,他引:1  
This paper attempts to analyse the role of building energy efficiency (BEE) in China in addressing climate change mitigation. It provides an analysis of the current situation and future prospects for the adoption of BEE technologies in Chinese cities. It outlines the economic and institutional barriers to large-scale deployment of the sustainable, low-carbon, and even carbon-free construction techniques. Based on a comprehensive overview of energy demand characteristics and development trends driven by economic and demographic growth, different policy tools for cost-effective CO2 emission reduction in the Chinese construction sector are described. We propose a comprehensive approach combining building design and construction, and the urban planning and building material industries, in order to drastically improve BEE during this period of rapid urban development. A coherent institutional framework needs to be established to ensure the implementation of efficiency policies. Regulatory and incentive options should be integrated into the policy portfolios of BEE to minimise the efficiency gap and to realise sizeable carbon emissions cuts in the next decades. We analyse in detail several policies and instruments, and formulate relevant policy proposals fostering low-carbon construction technology in China. Specifically, Our analysis shows that improving building energy efficiency can generate considerable carbon emissions reduction credits with competitive price under the CDM framework.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号