首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 34 毫秒
1.
Cross-city analysis in environmental regulation within non-democratic political systems is a neglected area. Taking policy convergence and styles of regulation as the focus, this paper has taken an initial step to compare the environmental impact assessment (EIA) regulation in Hong Kong and Shanghai. In this comparative exercise, it is identified that policy convergence occurs more explicitly in policy ideology and policy consequences, whereas divergence takes place in policy content, regulatory process and public consultation. Convergence, however, is only superficial whereas divergence is substantial. Indeed EIA systems of these two jurisdictions have displayed contrasting styles of regulation. The formal EIA system in Shanghai is dominated by the environmental agency, which regulates informal politics in the EIA process within a legal format. The informal EIA system in Hong Kong is co-ordinated by the environmental agency, which seeks active co-operation with the clients in a consultative EIA process in an informal and discretionary manner. What makes the Hong Kong system superior to the Shanghai system is the existence of institutional channels for public consultation. Within a non-democratic political setting, the EIA process in Hong Kong is more transparent and the EIA system is more accountable to the public, whereas the EIA process in Shanghai is lacking in transparency and the EIA system is under tight bureaucratic control.  相似文献   

2.
The success of research in integrated environmental and natural resource management relies on the participation and involvement of different disciplines and stakeholders. This can be difficult to achieve in practice because many initiatives fail to address the underlying social processes required for successful engagement and social learning. We used an action research approach to support a research-based group with a range of disciplinary and stakeholder expertise to critically reflect on their engagement practice and identify lessons around how to collaborate more effectively. This approach is provided here as a guide that can be used to support reflective research practice for engagement in other integration-based initiatives. This paper is set in the context of an integrated wildlife management research case study in New Zealand. We illustrate how multi-, inter- and trans-disciplinary approaches can provide a framework for considering the different conversations that need to occur in an integrated research program. We then outline rubrics that list the criteria required in inter- and trans-disciplinary collaborations, along with examples of effective engagement processes that directly support integration through such efforts. Finally, we discuss the implications of these experiences for other researchers and managers seeking to improve engagement and collaboration in integrated science, management and policy initiatives. Our experiences reaffirm the need for those involved in integrative initiatives to attend to the processes of engagement in both formal and informal settings, to provide opportunities for critical reflective practice, and to look for measures of success that acknowledge the importance of effective social process.  相似文献   

3.
Environmental impact assessment (EIA) has been promoted as an instrument for preventive environmental management in construction projects, but its performance in safeguarding the environment through influencing project decision-making is questioned. This paper probes the underlying reasons from a governance perspective as an important supplement to the regulatory and technical perspectives. A framework, with process integration, professional governance, and public engagement being its key components, is proposed to analyze the governance arrangements that enable or inhibit the effective functioning of EIA, based on which a comparative study of three infrastructure projects in China, the United States and Finland was conducted. The results reveal that, while the level of process integration and public engagement of EIA determines the degree to which EIA influences project decisions, it is the professional governance that controls the accountability of EIA. The paper has implications on institutionally where efforts should be directed to improve the performance of EIA.  相似文献   

4.
This article investigates the involvement of local stakeholders in the environmental impact assessment (EIA) processes of Ghana’s first off-shore oil fields (the Jubilee fields). Adopting key informants interviews and documentary reviews, the article argues that the public hearings and the other stakeholder engagement processes were cosmetic and rhetoric with the view to meeting legal requirements rather than a purposeful interest in eliciting inputs from local stakeholders. It further argues that the operators appear to lack the social legitimacy and social license that will make them acceptable in the project communities. A rigorous community engagement along with a commitment to actively involving local stakeholders in the corporate social responsibility (CSR) programmes of the partners may enhance the image of the partners and improve their social legitimacy. Local government agencies should be capacitated to actively engage project organisers; and government must mitigate the impact of the oil projects through well-structured social support programmes.  相似文献   

5.
It is commonly put forward that effective uptake of research in policy or practice must be built upon a foundation of active knowledge exchange and stakeholder engagement during the research. However, what is often lacking is a systematic appreciation of the specific practices of knowledge exchange and their relative merits. The paper reports on a 2009 survey of 21 research projects within the UK Research Councils' Rural Economy and Land Use Programme regarding the involvement and perceived impact of over a thousand stakeholders in the research. The survey reveals that most stakeholders were involved as research subjects or as event participants. Large numbers were also engaged in the research process itself, including involvement in shaping the direction of research. Stakeholder engagement is perceived as bringing significant benefits to the process of knowledge production. A close relationship is found between mechanisms and approaches to knowledge exchange and the spread of benefits for researchers and stakeholders. Mutual benefits are gained from exchange of staff or where stakeholders are members of research advisory groups. Different stakeholder sectors are also associated with different patterns of engagement, which lead to contrasting impact patterns. Any efforts to alter knowledge exchange processes and outcomes must overcome these differing engagement tendencies. Overall, much greater attention should be given to early processes of knowledge exchange and stakeholder engagement within the lifetime of research projects.  相似文献   

6.
Impact scoping is the process of identifying important issues of a proposal and focusing the environmental impact assessment (EIA) on the high-priority issues. Although impact scoping in one form or another has been inherent to EIA for some time, documentation of its development and discussion of refinements to impact scoping processes have not been forthcoming. This article traces the development of impact scoping through time and highlights the need for such processes in EIA. A focused environmental assessment (FEA) approach to impact scoping that is suitable for implementation in an EIA is presented here and advantages of its use are delineated. FEA is a three-staged process that encourages impact scoping through progressive steps including impact identification, assessment and management planning. FEA combines a suite of EIA methods including: issues matrices, impact hypotheses, valued ecosystem components, and stakeholder participation sessions to effectively integrate impact scoping with EIA.  相似文献   

7.
海洋油气开发工程环评中公众参与探讨   总被引:2,自引:2,他引:0  
根据我国环境影响评价公众参与现状和海洋油气开发工程公众参与实践,对海洋油气开发工程环评中公众参与进行初步探讨。目前海洋油气开发工程公众参与存在的问题主要有:相关公众界定较难、公众主要是在环评机构主导下的被动参与、信息不对称使公众难以正确表达意见、相关公众中个人的环境素养和法制意识不高。根据存在的问题,建议通过以下方法提高海洋油气开发工程环评公众参与水平:研究制定海洋工程公众参与技术方法规范;掌握好公众参与时机,尽早启动,调动公众主动参与;科学确定公众范围,选择好公众参与对象;结合实际选择公众参与方式。  相似文献   

8.
A set of process-related barriers negatively determines the effectiveness of Environmental Impact Assessment (EIA) in transport planning. Recent research highlights the unstructured stakeholder involvement and inefficient public participation in earlier phases of EIA as key bottlenecks. While the academic literature has produced promising theories for addressing these barriers, they have rarely been translated into solutions applicable and testable in practice. In order to bridge this theory–practice gap, we present a systematic literature review of interventions and mechanisms aimed at facilitating the integration of different sources and types of knowledge during the scoping phase of EIA. This review explores if and how interventions and mechanisms have been conducted in practice; if and why they worked or did not work and how relevant they are for EIA in transport planning. Based on this review, we distil a set of three specific interventions and trigger mechanisms applicable in the context of EIA in transport planning.  相似文献   

9.
The importance of stakeholder engagement for the success of natural resources management processes is widely acknowledged, yet evaluation frameworks employed by administrators of environmental programmes continue to provide limited recognition of or insistence upon engagement processes. This paper presents a framework for monitoring and evaluation of engagement that aims to better incorporate community engagement into mainstream environmental programmes, in particular in remote regions such as arid and desert regions of the world. It is argued that successful monitoring of engagement should not only comprise a generic set of indicators but rather, in addition to the principles of good monitoring practice, should take into account a variety of the stakeholder interests as well as key regional drivers, addressing them at right geographic, institutional and time scale.  相似文献   

10.
How does knowledge management (KM) by a government agency responsible for environmental impact assessment (EIA) potentially contribute to better environmental assessment and management practice? Staff members at government agencies in charge of the EIA process are knowledge workers who perform judgement-oriented tasks highly reliant on individual expertise, but also grounded on the agency’s knowledge accumulated over the years. Part of an agency’s knowledge can be codified and stored in an organizational memory, but is subject to decay or loss if not properly managed. The EIA agency operating in Western Australia was used as a case study. Its KM initiatives were reviewed, knowledge repositories were identified and staff surveyed to gauge the utilisation and effectiveness of such repositories in enabling them to perform EIA tasks.  相似文献   

11.
中国环评制度的发展历程及展望   总被引:5,自引:3,他引:2       下载免费PDF全文
环评制度作为中国知名度最高的环境管理手段之一,在环保工作中发挥了重要作用,但近年来也暴露出众多问题,广为社会关注。特别是十八大以来,关于环评改革的呼声日益高涨。本文系统回顾了环境影响评价制度在中国的发展历程,以环评重大事件为分水岭,首次将环评发展历程划分为成长期、发展期、壮大期和问题高发期。以此为基础,总结了当前环评制度的主要问题,并剖析了其深层次原因,包括制度设计失当、体系运行失效、公众意识觉醒等,最后针对这些问题为环评制度的优化与发展提出了建议。  相似文献   

12.
13.
This article reviews the application of environmental impact assessment (EIA) procedures and practices to three watershed modification projects situaled in western Canada. These ventures were justified for accelerating regional economic development, and cover the period during which public concerns for protecting the environment rapidly made their way into the national political agenda. An historical account and analysis of the situation, therefore, seems desirable in order to understand the development of EIA processes, practices, and methodologies since the start of construction of the first project in 1961. This study concludes that there has been good progress in predicting and evaluating environmental and related social impacts of watershed modification proposals. However, a number of obstacles need to be overcome before EIA can firmly establish itself as an effective planning tool. These difficulties include jurisdictional confusions and conflicts, division of authority and responsibility in designing and implementing appropriate mitigative and monitoring measures, lack of tested EIA methodologies, and limited availability of qualified human resources. A number of conclusions and suggestions are offered so that future watershed modification proposals may be planned and implemented in a more environmentally sustainable fashion. These include: (1) EIA processes must be completed before irrevocable decisions are made. (2) Any major intrusion into a watershed is likely to impact on some major components of the ecosystem(s). (3) Mitigation costs must form part of the benefit-cost analysis of any project proposal. (4) Interjurisdictional cooperation is imperative where watersheds cross political boundaries. (5) The EIA process is a public process, hence public concerns must be dealt with fairly. (6) The role of science in the EIA process must be at arms length from project proponents and regulators, and allowed to function in the interest of the protection of the environment and public health and safety. The views expressed here are the authors’ own and do not necessarily reflect those of FEARO and/or other government agencies and officials involved in the review of these projects.  相似文献   

14.
Summary The Commission of the European Communities' directive on environmental impact assessment (EIA) finally came into force in July 1988. The main provisions of the Directive are described, together with the objectives it is intended to achieve and the key areas where member state legislation will need to be effective if the principal requirements of the Directive are to be properly implemented. These include adequate coverage of projects, sufficient information in EIA studies, and effective consultation and public participation. Most European countries have some experience with EIA but, as illustrated by the UK Channel Fixed Link reports, the quality of the studies undertaken is very variable. Recommendations are made for improvements in practice through more effective diffusion of best practice, better provision and use of EIA guidance, more focused EIA research, more effective consultation and closer collaboration between the different parties involved in the EIA process, and both quantitative and qualitative improvements in EIA training. The results of a recent survey of European EIA training activity indicate growing interest, but further progress in improving the provision of EIA training is needed before the Directive can be effectively implemented.Drs Christopher Wood and Norman Lee have both been involved on various Environmental Impact Assessment (EIA) studies for the European Commission and have written widely on EIA and related topics. Both are Senior Lecturers at the University of Manchester and they are co-Directors of its EIA Centre. Christopher Wood teaches mainly in the Department of Town and County Planning, Norman Lee in the Department of Economics.  相似文献   

15.
ABSTRACT

The Norwegian urban growth agreement (UGA) is a governance platform combining transport-infrastructure development with land-use and transport policy. It is a policy package of measures involving network cooperation between national, regional and local government levels established to coordinate transport and land-use development. Shared responsibility for goal achievement, autonomy and learning and adaptation as new knowledge and experience arise are clear prerequisites for the UGAs. This makes it relevant to investigate the conditions for the UGAs to work as an adaptive governance strategy because their central features are in line with the attributes of adaptive governance. Further, adaptive governance is an approach to handle complex problems like transport development issues. The study shows that UGAs have several strengths in terms of autonomy and learning. However, the multi-level cooperation in the UGAs is framed by complex underlying structures of roles and powers, which challenge the working and legitimacy of the governance structures. Multi-level adaptive governance processes like the UGAs require attention to issues of power and legitimacy. Securing transparency and democratic anchorage is paramount in bringing such processes in line with the intended benefits of adaptive governance.  相似文献   

16.
China's EIA Law came into effect in 2003 and formally requires road transport infrastructure development actions to be subject to Environmental Impact Assessment (EIA). EIAs (including project EIA and plan EIA, or strategic environmental impact assessment, SEA) have been being widely applied in the expressway infrastructure planning field. Among those applications, SEA is applied to provincial level expressway network (PLEI) plans, and project EIA is applied to expressway infrastructure development 'projects' under PLEI plans. Three case studies (one expressway project EIA and two PLEI plan SEAs) were examined to understand currently how EIAs are applied to expressway infrastructure development planning. Through the studies, a number of problems that significantly influence the quality of EIA application in the field were identified. The reasons causing those problems are analyzed and possible solutions are suggested aimed at enhancing EIA practice, helping deliver better decision-making and ultimately improving the environmental performance of expressway infrastructure.  相似文献   

17.
/ Environmental impact assessment (EIA) has been identified as an important instrument for facilitating sustainability. However, to do so requires the integration of sustainability into EIA theory and practice. The sustainability concept is a valid and important environmental management perspective. However, many issues and obstacles need to be addressed further if the concept is to be translated into practical strategies. Sustainability can potentially infuse EIA with a clearer sense of direction, an ethical foundation, a mechanism for establishing priorities and assessing choices, and a means of linking EIA to other environmental management instruments. Conceptually, EIA and sustainability can be integrated, but frameworks should be refined, adpated to context, and linked to related initiatives. Sustainability should be explicitly incorporated into EIA legislation, guidelines, and institutional arrangements. An experimental approach to testing, assessing, and sharing experiences is suggested.A framework is first presented that defines and characterizes the sustainability concept. A further framework is then described for integrating sustainability into EIA at the conceptual level. The integration of sustainability and EIA at the regulatory level is next addressed through an overview of sustainability initiatives in EIA requirements in Canada. The Canadian examples include many promising initiatives but these and other experiences will need to be monitored, shared, and integrated into comprehensive environmental management strategies. Finally, means of incorporating sustainability into each activity in the EIA planning process are identified.KEY WORDS: Sustainability; Environmental impact assessment  相似文献   

18.
ABSTRACT

Transparency in environmental governance is no longer an uncontroversial answer to problems of accountability and effectiveness. How to design effective transparency systems and in what policy contexts they are effective remain contested issues. This special section, consisting of this introduction and four research articles, interrogates complex and potentially conflicting links between transparency, accountability, empowerment and effectiveness in environmental governance. Building on existing literature and the four contributions, we discuss persisting diversity in varieties of transparency, the evolving dynamics of commodity chain transparency, and the consequences of emerging novel forms of digitalized transparency. As we show, the contributions to this special section interrogate in novel ways the transformative potential of transparency, through shedding light on the performative effects of transparency in ever more complex environmental governance contexts. These contexts may include, inter alia, the growing ubiquity of traceability in transnational commodity chains, the need for ever more anticipatory (ex-ante) forms of environmental governance, and an ever-broadening quest for digitally monitored environments. In particular, the impacts of the real-time ‘radical’ transparency engendered by use of novel digital technologies remain under-analyzed in the sustainability domain. We conclude by raising several critical concerns that deserve further scientific research and policy debate.  相似文献   

19.
The Environmental Impact Assessment (EIA) was first entered into force in the United States of America in 1969 through the National Environmental Policy Act. Since then, the EIA was implemented in many other countries. In Ethiopia, EIA was formally introduced in 2002 by Proclamation No. 299/2002 after the establishment of the Environmental Protection Authority (EPA) in 1995 and the formulation of the Environmental Policy of Ethiopia (EPE) in 1997. This study, which is based on a document review, interviews, and the application of a survey questionnaire, analyzes the procedures and practices of the Ethiopian EIA system, seeks to clarify fundamental information regarding the EIA system and characteristics of the key elements of EIA processes, and finally, offers suggestions that could improve EIA practices in the country. The overall result of this study shows that Ethiopia adopted EIA procedures that are similar to western models; however, despite approximately 15 years of experience, its implementation is still poor to the point that the use of EIA as an instrument of environmental management could be questioned. The challenges identified by this study include institutional, organizational, and professional capacity gaps, which, in turn, have resulted in constraints ranging from improper screening, scoping, and production of EIA reports to ineffective review, monitoring, and post‐project evaluation. Additional challenges to the system include poor governance and corruption, rapid economic growth, and the mushrooming of micro‐ and small‐scale enterprises that cause pollution and environmental degradation. This article also provides comprehensive suggestions to improve EIA practices in Ethiopia.  相似文献   

20.
鱼红霞 《四川环境》2008,27(6):63-67
衔接土地利用规划和建设项目的土地一级开发伴随着土地政策的改革而出现。目前土地一级开发环境影响评价处于起步阶段,缺乏对这项工作系统的研究。本文结合工作中的实践经验,从土地一级开发环境影响评价实施的意义、作用和评价目的等方面对土地一级开发的环境影响评价进行了论述,分析了其环境影响评价存在的问题,总结了土地一级开发环境影响评价的技术要点,并对完善土地一级开发环境影响评价制度提出建议。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号