首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到4条相似文献,搜索用时 0 毫秒
1.
The US Army Corps of Engineers often requires wetland creation or restoration as compensation for wetlands damaged during development. These wetlands are typically monitored postconstruction to determine the level of compliance with respect to site-specific performance standards. However, defining appropriate goals and measuring success of restorations has proven difficult. We reviewed monitoring information for 76 wetlands constructed between 1992 and 2002 to summarize the performance criteria used to measure progress, assess compliance with those criteria, and, finally, to evaluate the appropriateness of those criteria. Goals were overwhelmingly focused on plant communities. Attributes used to assess the quality of restored plant communities, including percent native species and the Floristic Quality Index, increased over time but were apparently unrelated to the number of species planted. Compliance frequencies varied depending on site goals; sites often failed to comply with criteria related to survival of planted vegetation or requirements that dominant plant species should not be exotic or weedy, whereas criteria related to the establishment of cover by vegetation or by wetland-dependent plants were often met. Judgment of a site’s success or failure was largely a function of the goals set for the site. Some performance criteria were too lenient to be of value in distinguishing failed from successful sites, whereas other criteria were unachievable without more intensive site management. More appropriate goals could be devised for restored wetlands by basing performance standards on past performance of similar restorations, identifying consistent temporal trends in attributes of restored sites, and using natural wetlands as references.  相似文献   

2.
To test the effectiveness of the 404 permit program in preventing a net loss of wetland resources, 75 Section 404 projects permitted in the years 1987–1989 and located in a portion of southern California were evaluated. From this group of projects, 80.47 ha of wetlands were affected by Section 404 permits and the Army Corps of Engineers required 111.62 ha of wetland mitigation. To verify the successful completion of each mitigation project, all 75 project sites were visited and evaluated based on the amount of dead vegetation, growth and coverage, and the number of invasive species. Based on the field verification results, the actual amount of completed mitigation area was 77.33 ha, resulting in a net loss of 3.14 ha of wetland resources in the years 1987–1989. By comparing the types of wetlands lost to the types of wetlands mitigated, it is apparent that, in particular, freshwater wetlands are experiencing a disproportionately greater loss of area and that riparian woodland wetlands are most often used in mitigation efforts. The net result of these accumulated actions is an overall substitution of wetland types throughout the region. Results also indicate that, typically, large-scale mitigation projects are more successful compared to smaller projects and that successful compliance efforts are not evenly distributed throughout the region. We recommend that better monitoring, mitigation in-kind, mitigation banking, and planning on a regional or watershed scale could greatly improve the effectiveness of the Section 404 permitting program.  相似文献   

3.
Development projects that impact wetlands commonly require compensatory mitigation, usually through creation or restoration of wetlands on or off the project site. Over the last decade, federal support has increased for third-party off-site mitigation methods. At the same time, regulators have lowered the minimum impact size that triggers the requirement for compensatory mitigation. Few studies have examined the aggregate impact of individual wetland mitigation projects. No previous study has compared the choice of mitigation method by regulatory agency or development size. We analyze 1058 locally and federally permitted wetland mitigation transactions in the Chicago region between 1993 and 2004. We show that decreasing mitigation thresholds have had striking effects on the methods and spatial distribution of wetland mitigation. In particular, the observed increase in mitigation bank use is driven largely by the needs of the smallest impacts. Conversely, throughout the time period studied, large developments have rarely used mitigation banking, and have been relatively unaffected by changing regulatory focus and banking industry growth. We surmise that small developments lack the scale economies necessary for feasible permittee responsible mitigation. Finally, we compare the rates at which compensation required by both county and federal regulators is performed across major watershed boundaries. We show that local regulations prohibiting cross-county mitigation lead to higher levels of cross- watershed mitigation than federal regulations without cross-county prohibitions. Our data suggest that local control over wetland mitigation may prioritize administrative boundaries over hydrologic function in the matter of selecting compensation sites.  相似文献   

4.
Both permit requirements and ecological assessments have been used to evaluate mitigation success. This analysis combines these two approaches to evaluate mitigation required under Section 404 of the United States Clean Water Act (CWA) and Section 10 of the Rivers and Harbors Act, which allow developers to provide compensatory mitigation for unavoidable impacts to wetlands. This study reviewed permit files and conducted field assessments of mitigation sites to evaluate the effectiveness of mitigation required by the US Army Corps of Engineers for all permits issued in Orange County, California from 1979 through 1993. The 535 permit actions approved during this period allowed 157 ha of impacts. Mitigation was required on 70 of these actions, with 152 ha of enhanced, restored, and created habitat required for 136 ha of impacts. In 15 permit actions, no mitigation project was constructed, but in only two cases was the originally permitted project built; the two cases resulted in an unmitigated loss of 1.6 ha. Of the remaining 55 sites, 55% were successful at meeting the permit conditions while 11% failed to do so. Based on a qualitative assessment of habitat quality, only 16% of the sites could be considered successful and 26% were considered failures. Thus, of the 126 ha of habitat lost due to the 55 projects, only 26 ha of mitigation was considered successful. The low success rate was not due to poor enforcement, although nearly half of the projects did not comply with all permit conditions. Mitigation success could best be improved by requiring mitigation plans to have performance standards based on habitat functions.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号