首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 0 毫秒
1.
Use of the guild concept in environmental impact assessment   总被引:1,自引:0,他引:1  
The purpose of this paper was to clarify and expand several ideas concerning use of the guild concept in environmental impact assessment Background material on the concept and examples of its use are given. It is argued that for purposes of environmental assessment a resource-based guild approach is preferable to a taxonomic-based approach. Validity of the guild concept, problems in classifying species into guilds, implications of guild membership, and usefulness of guild analyses are discussed. I conclude that only with a thorough knowledge of both its limitations and benefits will it be possible to fully use the guild concept for understanding organizational processes in communities and ecosystems and for assessing environmental impacts.  相似文献   

2.
Guild management: an evaluation of avian guilds as a predictive tool   总被引:4,自引:0,他引:4  
The use and applicability of the guild concept to management is evaluated and questioned. Ecological problems are never as simple as implied in using one or two guild axes. A close examination of bird communities in a ponderosa pine forest reveals little relationship between guilds or guild blocks and the responses exhibited by individual bird species or bird species groups. Response guilds changed from year to year without any obvious changes in vegetation. A three-year composite analysis shows a clearer picture of the responses of ponderosa pine forest birds to the overall interactions between structure, weather, competition, and so on. The six response groups in the composite analysis are species that (1) were absent in 1973 on most or all study plots and showed no preference for any forested site; (2) had their highest densities on the medium cut and light cut plots; (3) were absent in 1973 on most or all study plots and had their highest densities on the medium cut and light cut plots; (4) had their highest densities on the untreated, light cut, and medium cut plots; (5) had their highest densities on the untreated and light cut plots and were either absent or had greatly reduced densities on all other plots; and (6) were present only on the clearcut, except for the Rock Wren which was also on the medium cut and heavy cut plots. The overall correlation between species density and guild density was significantly higher for response guilds ( <0.05) than for any of the structural or functional guilds. The whole concept of guild management needs much more research and development before it can be recommended as a management tool.  相似文献   

3.
To help determine whether plants should be grouped into guilds for environmental impact assessment, the responses of six members of a guild of deciduous forest herbs to selective tree harvesting were compared. Harvesting operations themselves (tree cutting and skidding) had little effect on five of the six species but the sixth species decreased more in cut plots than in uncut plots. Subsequent microclimatic changes, resulting from tree cutting, also affected guild members differently. In the first year after cutting, two species increased more in cut plots than in uncut plots, while three other species did not change in frequency of occurrence and the sixth species decreased more in cut plots than in uncut plots. This inconsistent response of guild members to tree harvesting suggests that caution should be exercised in using guilds to assess plant response to environmental change.  相似文献   

4.
Since environmental impact assessment (EIA) is concerned primarily withsignificant environmental impacts, the concept of impact significance deserves to be defined and applied rigorously. In this article use of the term over the past 15 years in EIA documentation is reviewed. Some recent attempts at elucidating the concept are summarized. Four perspectives on impact significance that emerged from a series of workshops on the ecological basis for EIA are presented. These perspectives include (a) statistical (related to problems of isolating project-induced changes from natural variation), (b) ecological (related to the importance of project-induced changes from a purely ecological perspective), (c) social (related to the acceptability of project-induced changes in important environmental attributes), and (d) project (related to whether project-induced changes will indeed influence project decision making). The following synthesis is proposed: Any exercise in judging the significance of an environmental impact should thoroughly consider (a) the importance of the environmental attribute in question to project decision makers, (2) the distribution of change in time and space, (c) the magnitude of change, and (d) the reliability with which change has been predicted or measured. The implications of considering these factors are discussed.  相似文献   

5.
This study was initiated to develop cause and effect relationships between Army training activities and bird populations throughout the continental United States. Installations in Kentucky, Louisiana, Texas, and Washington were selected as representative of diverse ecosystems and of extent of training. Birds were separated into 31 guilds to assist in the analysis between different ecosystems. The results showed that (1) guild theory can be useful in impact analyses within and between ecosystems, (2) tracked vehicles disturb bird populations because of habitat alteration and reduction, (3) the change in biomass ranged from 20.9to–55.3 percent and is dependent on the extent of training and ecosystem type, and (4) species replacement should be a major concern, with nine endemic species being replaced by three endemic and two introduced species. Because of similarities between tracked vehicle training and some construction activities, much of this information may be useful for analysis of civilian activities as well as military.  相似文献   

6.
The applicability of the Habitat Evaluation Procedure (HEP) was assessed for several nongame bird species in the central Adirondack Mountains of New York. Measures for 24 avian species and 33 associated habitat variables were collected during the summers of 1985 and 1986. The accuracy of four published Habitat Suitability Index (HSI) models was examined: pileated and downy woodpeckers, black-capped chickadee, and veery. Chickadee and veery models were judged successful and were then used to predict habitat quality for respective avian foragingguild members. The HSI model/guild approach provided poor predictors of habitat quality for ubiquitous and uncommon species. Information on relative abundance within the geographic region and specific cover types must be included when designing habitat evaluations using the guild approach.  相似文献   

7.
Importance of insects in environmental impact assessment   总被引:9,自引:0,他引:9  
Insects are particularly suited for use in environmental impact assessment (e.i.a.) because of their high species diversity, ubiquitous occurrence, and importance in the functioning of natural ecosystems. Examples are given of the use of insects in the predictive phase of e.i.a., in the monitoring and assessment phase, and in the much rarer instance of an e.i.a. that includes both of these phases. The importance of working at the species level to understanding the results of e.i.a. is emphasized.  相似文献   

8.
曹和平 《四川环境》1993,12(1):53-56
近年来我们陆续承接了一些发展中国家电力工程中环境影响评价的招标,议标工作和世界银行(以下简称世行)在国内贷款项目的环境影响评价。本文就工作中所涉及的环境影响评价的深度和广度,执行标准,以及今后工作中有待加强的方面作了一些探讨。  相似文献   

9.
The premise that, strictly speaking, impact monitoring is impossible, is presented and discussed It is shown that a wide range of published objectives for environmental effects monitoring can be seen as special cases of the basic goal of reducing uncertainty in predictions. Monitoring in environmental-impact situations can only be used as a check on one of the two time series required to define impact. Four approaches to generating the other time series required in the difference calculation of impact are discussed, with the conclusion that the best approach relies on process-based simulation models. Impact analysts are encouraged to consider carefully what can and cannot actually be accomplished with environmental monitoring to assist impact detection.  相似文献   

10.
Impact scoping is the process of identifying important issues of a proposal and focusing the environmental impact assessment (EIA) on the high-priority issues. Although impact scoping in one form or another has been inherent to EIA for some time, documentation of its development and discussion of refinements to impact scoping processes have not been forthcoming. This article traces the development of impact scoping through time and highlights the need for such processes in EIA. A focused environmental assessment (FEA) approach to impact scoping that is suitable for implementation in an EIA is presented here and advantages of its use are delineated. FEA is a three-staged process that encourages impact scoping through progressive steps including impact identification, assessment and management planning. FEA combines a suite of EIA methods including: issues matrices, impact hypotheses, valued ecosystem components, and stakeholder participation sessions to effectively integrate impact scoping with EIA.  相似文献   

11.
The wetland ecosystems occurring within alluvial floodplains change rapidly. Within the ecological successions, the life span of pioneer and transient stages may be measured in several years or decades depending on the respective influences of allogenic (water dynamics, erosion, and deposition) and autogenic developmental processes (population dynamics, eutrophication, and terrestrialization). This article emphasizes the mechanisms that are responsible for the ecosystem changes and their importance to environmental management. Two case studies exemplify reversible and irreversible successional processes in reference to different spatial and temporal scales. On the scale of the former channels, the standing-water ecosystems with low homeostasis may recover their previous status after human action on the allogenic processes. On the scale of a whole reach of the floodplain, erosion and deposition appear as reversible processes that regenerate the ecological successions. The concepts of stability and reversibility are discussed in relation to different spatiotemporal referential frameworks and different levels of integration. The reversible process concept is also considered with reference to the energy inputs into the involved subsystems. To estimate the probability of ecosystem regeneration or the cost of restoration, a concept of degrees of reversibility is proposed.  相似文献   

12.
How does knowledge management (KM) by a government agency responsible for environmental impact assessment (EIA) potentially contribute to better environmental assessment and management practice? Staff members at government agencies in charge of the EIA process are knowledge workers who perform judgement-oriented tasks highly reliant on individual expertise, but also grounded on the agency’s knowledge accumulated over the years. Part of an agency’s knowledge can be codified and stored in an organizational memory, but is subject to decay or loss if not properly managed. The EIA agency operating in Western Australia was used as a case study. Its KM initiatives were reviewed, knowledge repositories were identified and staff surveyed to gauge the utilisation and effectiveness of such repositories in enabling them to perform EIA tasks.  相似文献   

13.
Carbon cycling analysis is presented as a means for assessing anthropogenic perturbations in an ecosystem. Data from oligotrophic, eutrophic, and dystrophic (bog) lakes are used to show general trends in the lacustrine carbon cycle. The oligotrophic lake is an unstressed system and the eutrophic lake is under nutrient enrichment with high algal standing crops and productivity. The bog lake is a pH-stressed environment that is primarily a grazing ecosystem. It is hoped that a more effective environmental impact assessment will result from the use of carbon cycling as a unifying concept in ecosystem analysis.  相似文献   

14.
我国环境影响评价公众参与工作存在的问题及解决对策   总被引:1,自引:0,他引:1  
黄庆  高燕 《四川环境》2013,(5):61-66
本文通过对我国环境影响评价公众参与发展历程的回顾和采用对比法分析各省市出台的相关公众参与的实施办法或条例的基础上,分析我国环评公众参与具体操作过程中存在公众参与作用边界被无限放大、参与对象缺乏代表性和形式单一等问题,从信息公开制度、公众参与对象的选择、公众参与形式、公示内容、公众反馈意见等方面提出提高公众参与有效性的对策和建议.  相似文献   

15.
A large body of literature addresses the role of science in environmental impact assessment (EIA) but less attention has been given to the views of practitioners themselves. In this research a survey of 31 EIA practitioners in Western Australia was undertaken to determine their perceptions of the quality and importance of science in EIA. The survey results are compared with previous theoretical, empirical, and survey studies of the role of science in EIA. Interview questions addressed the role of science in impact prediction, monitoring activities, mitigation and management, and EIA decision-making. It was clear from the interviews that many practitioners are satisfied with the quality of science currently used in EIA, but do not believe that it is given sufficient importance in the process. The quality and importance of science in the predecision stages of EIA was rated higher than in the postdecision stages. While science was perceived to provide the basis for baseline data collection, impact prediction, and mitigation design, it was seen to be less important during decision-making and ongoing project management. Science was seen to be just one input to decision-makers along with other factors such as sociopolitical and economic considerations. While time and budget constraints were seen to limit the scientific integrity of EIA activities, pressure from the public and regulatory authorities increased it. Improving the scientific component of EIA will require consideration of all these factors, not just the technical issues.  相似文献   

16.
关于建设项目对自然保护区生态影响专题评价的思考   总被引:1,自引:0,他引:1  
建立自然保护区对保护生物圈及生物多样性具有十分重要的作用。我国已建立各种类型、不同级别的自然保护区2000多处。随着我国社会经济的发展,全国各地各类开发建设项目涌现,一些开发建设项目与自然保护区的保护要求发生矛盾。使开发建设项目避免或最大程度地减少对自然保护区的不利影响,做到保护与建设的双赢,是编写开发建设项目环境影响评价文件的一个重要内容。涉及自然保护区的开发建设项目一般要求编制对自然保护区影响的专题报告,本文根据工作实践,提出编制该类专题报告的主要内容及应注意的问题。  相似文献   

17.
This article reviews the application of environmental impact assessment (EIA) procedures and practices to three watershed modification projects situaled in western Canada. These ventures were justified for accelerating regional economic development, and cover the period during which public concerns for protecting the environment rapidly made their way into the national political agenda. An historical account and analysis of the situation, therefore, seems desirable in order to understand the development of EIA processes, practices, and methodologies since the start of construction of the first project in 1961. This study concludes that there has been good progress in predicting and evaluating environmental and related social impacts of watershed modification proposals. However, a number of obstacles need to be overcome before EIA can firmly establish itself as an effective planning tool. These difficulties include jurisdictional confusions and conflicts, division of authority and responsibility in designing and implementing appropriate mitigative and monitoring measures, lack of tested EIA methodologies, and limited availability of qualified human resources. A number of conclusions and suggestions are offered so that future watershed modification proposals may be planned and implemented in a more environmentally sustainable fashion. These include: (1) EIA processes must be completed before irrevocable decisions are made. (2) Any major intrusion into a watershed is likely to impact on some major components of the ecosystem(s). (3) Mitigation costs must form part of the benefit-cost analysis of any project proposal. (4) Interjurisdictional cooperation is imperative where watersheds cross political boundaries. (5) The EIA process is a public process, hence public concerns must be dealt with fairly. (6) The role of science in the EIA process must be at arms length from project proponents and regulators, and allowed to function in the interest of the protection of the environment and public health and safety. The views expressed here are the authors’ own and do not necessarily reflect those of FEARO and/or other government agencies and officials involved in the review of these projects.  相似文献   

18.
Integrated catchment management (ICM) was introduced as state policy in 1988 to overcome land and water degradation in Western Australia (WA). Key elements of ICM are cooperation among state and local governments and landholders; involvement of landholders and local communities in identification of issues and solutions; and, agreement on common objectives. This study identifies the issues that led to the adoption of integrated catchment management in Western Australia, outlines its main characteristics, and reviews the progress and problems encountered during its initial implementation. ICM has generally been accepted and endorsed in WA. However, differences of opinion have emerged regarding exactly what it means and how it should be applied. Designing ideal organizational structures for ICM is not sufficient for it to be effective. Ultimately, people have to make ICM function, and therefore it is essential that priority be given to cultivating the good will and trust necessary for ICM to work well. ICM also requires a long-term perspective and appreciation that it requires many people and agencies to move out of current “comfort zones.” As a result, initial implementation of ICM usually will encounter turbulence and debate.  相似文献   

19.
Life cycle impact assessment (LCIA) is performed to quantitatively evaluate all environmental impacts from products, systems, processes and services. However, LCIA does not always provide valuable information for choosing among alternatives with different specifications, functionalities and lifetimes. The objectives of this study are (1) to propose environmental indicators to evaluate environmental efficiency and value qualitatively and quantitatively on the basis of analogies to financial and economic indicators, and (2) to present the application of the indicators. Incremental evaluation using a reference is employed to obtain the environmental indicators. The environmental efficiency indicators are conceptually based on the ratios of reduced environmental burdens returned to environmental burdens required: environmental return on investment, environmental payback period and environmental internal rate of return. The environmental value indicator is the sum of all reduced and required environmental burdens: i.e., environmental net present value. All the environmental indicators can be used to compare and rank the environmental efficiencies or values of alternatives. The environmental efficiency indicators can be applied to a new environmental labeling. The concept of eco-efficiency labeling is developed by combining the environmental efficiency indicators with financial indicators. A case study is performed to illustrate the necessity and importance of the environmental indicators. These environmental indicators can help easily communicate LCIA results in the field of environmental management.  相似文献   

20.
In the management of conflicting dual-resource systems such as continental shelf hydrocarbon extraction and commercial fishing operations, it is necessary to consider the possibility of repeated impact events. The potential magnitude of impacts on Georges Bank fisheries of single oil spill events has been addressed in detail elsewhere (Reed and Spaulding 1979, Reed and others 1980, Spaulding and others 1982). An oil spill-fishery impact estimation model, implemented for the Georges Bank cod fishery (Reed and others 1980), has been used to investigate the potential for nonlinear biological responses to periodic and nonperiodic repetitive spill events. Prerecruit mortality equations incorporating young-of-the-year as well as adult-juvenile interactions, perform acceptably vis-à-vis the historical catch record, but show highly variable behavior under recruitment reductions induced by periodic simulated spills. The results demonstrate the importance of selecting mathematical representations of biological and physical processes underlying population dynamics such that characteristic system behavior is adequately represented in both the time and frequency domains.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号