首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Potential health risks and cleanup costs are primary factors for measuring the effectiveness of a remediation project concerning a site contaminated with residual radioactive materials. Demanding cleanup of a contaminated site to its original condition, while eliminating any health risks after cleanup, can require prohibitive costs. However, by setting practical remediation objectives and by performing realistic but conservative risk assessments, health risks can be acceptable and cleanup costs can be reasonable. This article uses the South-Middle and Southeast Vaults Decontamination and Demolition Project at Argonne National Laboratory to demonstrate how negligible health risks can result after cleanup with minimal cleanup costs. Substantial cost savings of approximately $2 million was realized by implementing in-place decontamination and demolition (D&D) on the basis of acceptable risk, instead of requiring cleanup of the site to its original condition. By using the RESRAD computer program as a modeling tool, we show the maximum projected radiation dose (0.1 mrem per year) and the potential lifetime cancer risk (on the order of 106) to an individual from exposure to the residual radioactivities are negligibly small. In addition to aiding in the selection of a preferred remediation alternative, results of the RESRAD modeling were also used to guide the implementation of the selected alternative to reduce exposures from the dominant pathway and to ensure that exposures from all pathways would be as low as reasonably achievable.  相似文献   

2.
Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking.In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.  相似文献   

3.
Construction and demolition (C&D) wood frequently contains treated wood including wood treated with chromated copper arsenate (CCA). Many recycling options for such wood require that the product be essentially free of preservative chemicals. The objectives of this study were to document the characteristics of the wood waste stream and to evaluate the effectiveness of sorting methods for identifying treated wood. Sorting methods evaluated included visual sorting and visual sorting augmented with the use of PAN indicator stain and/or hand-held X-ray fluorescence (XRF) units. Experiments were conducted on two types of construction and demolition (C&D) wood: source separated loads containing only C&D wood and wood hand-picked from commingled loads of general C&D waste. Results showed that 77% of the treated wood was CCA-treated. For uncontaminated piles (<1% treated wood) of source separated C&D wood, visual sorting was found to effectively remove the small amounts of treated wood present. For piles of source separated wood that were contaminated (approximately 50% treated wood), visual sorts were not accurate and benefited from augmented sorting using PAN indicator stain. The handheld XRF devices were found to be effective for sorting commingled C&D wood, as PAN indicator stain was not as effective due to the excessive amount of surface dirt associated with commingled wood waste. Visual sorting of source separated wood was estimated to cost between US$21 to US$96 per metric ton. These costs depended upon the amount of treated wood and whether or not augmentation with PAN indicator was necessary. Visual sorting augmented with hand-held XRF units was estimated at US$113 per metric ton. The bulk of these costs were associated with labor. Future efforts should focus on reducing labor costs by mounting automated XRF units on conveyor systems.  相似文献   

4.
The importance of cost planning for solid waste management (SWM) in industrialising regions (IR) is not well recognised. The approaches used to estimate costs of SWM can broadly be classified into three categories - the unit cost method, benchmarking techniques and developing cost models using sub-approaches such as cost and production function analysis. These methods have been developed into computer programmes with varying functionality and utility. IR mostly use the unit cost and benchmarking approach to estimate their SWM costs. The models for cost estimation, on the other hand, are used at times in industrialised countries, but not in IR. Taken together, these approaches could be viewed as precedents that can be modified appropriately to suit waste management systems in IR. The main challenges (or problems) one might face while attempting to do so are a lack of cost data, and a lack of quality for what data do exist. There are practical benefits to planners in IR where solid waste problems are critical and budgets are limited.  相似文献   

5.
The U.S. Department of Energy (DOE) is beginning major environmental restoration projects of both active and inactive sites throughout the United States. The problems at the sites include contaminated soils, groundwater and surface waters, structures, and old waste disposal areas. IT Corporation, under the direction of the Office of Independent Cost Estimating (OICE) for DOE, developed a list of environmental problems at the sites and probable cleanup technologies and techniques that could be used. Estimated unit costs were then developed for these cleanup technologies, using available data and references. Some procedures developed were common to many or all cleanup projects. These included site characterization, remedial investigation (RI), feasibility studies (FS), and the closure/post-closure phase. The article will focus on cost estimating of the closure/post-closure phase of a cleanup project. The cost data provided are for budget level or check estimates. Site-specific conditions as well as items peculiar to the environmental industry, such as governmental regulations and community relations, can influence both the cost and duration of a cleanup project.  相似文献   

6.
多水源用水网络优化模型研究   总被引:1,自引:1,他引:0  
为了解决含有多类供水水源的用水网络优化设计问题,研究了过程工业用水特点,将各用水单元看成水阱,各单元的排水看成潜在水源,从而将供水问题转化为水阱和水源的匹配问题,建立用于多水源用水网络优化的配水模型,并详细阐述该模型应用步骤及其特点。  相似文献   

7.
A Microsoft Excel spreadsheet‐based design tool has been developed to assist remediation professionals in the design of injection systems for distributing soluble substrate (SS) to enhance in situ anaerobic bioremediation. The user provides site data, design parameters, and unit‐cost information to generate estimates of remediation‐system cost and steady‐state contact efficiency (CESS) for various designs. CESS is estimated from a nonlinear regression equation that includes terms for the SS injection concentration (CI), minimum substrate concentration (CMIN), groundwater travel time between rows of injection wells (TT), SS half‐life (TH), substrate reinjection time interval (TR), and pore volumes of substrate solution injected (PV). With this tool, users can quickly compare the relative costs and performance of different injection alternatives and identify the best design for their specific site conditions. The design process embodied in the tool includes: (1) entering injection‐well configuration and unit costs for well installation, injection, and substrate; (2) determining treatment‐zone dimension; (3) selecting trial injection‐well spacing, time period between substrate reinjection, and injection pore volume; and (4) estimating contact efficiency and capital and life‐cycle costs. This process is then repeated until a final design is selected. In most cases, injection costs increase with increasing CESS. However, the best (highest) ratio of CESS to injection cost typically occurs for CESS in the range of 70 to 80 percent. © 2013 Wiley Periodicals, Inc.  相似文献   

8.
Solid waste management presses for effective landfill design and operation. While planning and operating a landfill (LF) or a landraise (LR), choices need to be made regarding: (1) LF-LR morphology (base shape, side slopes, final cover thickness, LR/LF height/depth); (2) cell geometry (height, length, slopes); and (3) operation parameters (waste density, working face length, cover thicknesses). These parameters affect LF/LR capacity, operation lifespan and construction/ operation costs. In this paper, relationships are generated between capacity (C, space available for waste) and the above parameters. Incorporating real data into simulation kgamma A1.38, runs, two types of functions are developed: first, C = where A is the LF/LR base area size and kgamma a base shape-dependent coefficient; and second, C = alpha(p,gamma,A) + delta(p,gamma,A)Xp for every parameter p, where Xp is the value of p and alpha(p,gamma,A) and delta(p,gamma,A) are parameter- and base (shape/size)-specific coefficients. Moreover, the relationship between LF depth and LR height that balances excavation volume with cover material, is identified. Another result is that, for a symmetrical combination of LF/LR, with base surface area shape between square and 1:2 orthogonal, and final density between 500 and 800 kg m(-3), waste quantity placed ranges from 1.76A1.38 to 2.55A1.38 tons. The significance of such functions is obvious, as they allow the analyst to investigate alternative LF/LR schemes and make trade-off analyses.  相似文献   

9.
In response to federal and state clean water laws, forestry best management practices (BMPs) have been developed and implemented to prevent nonpoint source water pollution. Ellefson and Miles (1985) found that estimated BMP costs in the Midwest could amount to more than half of the net returns on national forest timber sales. Henly et al. (1988) found that government costs to implement forest practice rules ranged from as little as $100,000 per year in Idaho and Nevada to more than $4 million annually in California. A review of studies in the South indicates that estimated BMP costs have increased over time. Lickwar et al. (1992) estimated Southeast average costs of $12.45 per acre, $2.34 per MBF, or 2.87% of gross stumpage values based on 1987 BMPs and prices. Woodman and Cubbage (1994) estimated Georgia average BMP costs of $24.33 per acre or $3.02 per MBF for forest industry lands and $41.65 per acre or $5.39 per MBF for NIPF lands. For Virginia, Shaffer et al. (1998) estimated median BMP costs of $18.90 per acre. These moderate cost increases could be attributed to a higher level of standards in the revision of each state BMP guidelines manual, as well as moderate price inflation. BMPs such as better road construction, water bars, culverts, and broad-based dips have been most expensive so far. To date streamside zones have not been very expensive because the rules allow most of the valuable residual tees to be harvested as long as heavy equipment does not operate near the streams. However, this limitation may become much more difficult and costly – as indicated by Kluender et al. (2000) – as fewer chainsaw fellers and cable skidders are available. Stricter BMPs, such as those already adopted to implement forest certification standards in the South or those used to protect salmon habitat in the West, could prompt more expensive southern BMPs for landowners and state agencies in the future.  相似文献   

10.
This study evaluated the microbiocidal efficacy of a cleaning and disinfection (C&D) treatment using stainless-steel coupons applied to three common types of animal mortality transport vehicles when exposed to agricultural conditions. Metal test coupons, inoculated with bacteriophage MS2, were affixed to the undercarriage of three types of animal mortality transport vehicles at various locations. Coupons were grimed by maneuvering the test vehicles down a series of wet dirt roads. Coupons were attached and extracted at various points to evaluate C&D performance with and without grime. C&D efficacy using a water-supplied pressure washing system and a dilute sodium hypochlorite (NaOCl) solution was determined by comparing the difference in recovered viable virus between positive control coupons and test coupons. The results demonstrated a relatively high surface decontamination efficacy, with all but one location showing >5 log reduction of MS2. Coupons located on the roll-off truck's inside-back bumper contained the highest level of grime and resulted in a 4 log reduction of MS2. There was no significant difference in C&D efficacy across vehicle types, but locations impacted by grime and lack of accessibility achieved lower efficacies on average. These findings suggest that common C&D protocols, when applied to farm mortality transport vehicles, are effective. Hard-to-access locations containing high levels of grime may be candidates for additional targeted treatment.  相似文献   

11.
Different methods exist for measuring soil water and solute fluxes in and below the root zone and have been critically reviewed. Besides indirect methods (e.g. water balance, tensiometer, time domain reflectometry – TDR, frequency domain reflectometry – FDR, environmental tracer) direct methods (e.g. drainage-type lysimeter, water fluxmeter) have a long tradition and have been successfully used in seepage research. A large weighable out door lysimeter is the best method for obtaining reliable data about seepage water quantity and quality, but it involves significant investment and additional expenses for maintenance. To tackle this problem new methods for the vertical collection of large volume soil monoliths (up to 6 m3) as well as for the horizontal collection (up to 6 m3) have been developed. For the placement of the lysimeter a container lysimeter unit was constructed, which is cheaper than a conventional steel or concrete cellar. Furthermore, the technical design of the newly developed lysimeter types as a weighable gravitation lysimeter, a weighable groundwater lysimeter and a lateral flow lysimeter are presented.  相似文献   

12.
Wastes from construction activities constitute nowadays the largest by quantity fraction of solid wastes in urban areas. In addition, it is widely accepted that the particular waste stream contains hazardous materials, such as insulating materials, plastic frames of doors, windows, etc. Their uncontrolled disposal result to long-term pollution costs, resource overuse and wasted energy. Within the framework of the DEWAM project, a web-based Decision Support System (DSS) application - namely DeconRCM - has been developed, aiming towards the identification of the optimal construction and demolition waste (CDW) management strategy that minimises end-of-life costs and maximises the recovery of salvaged building materials. This paper addresses both technical and functional structure of the developed web-based application. The web-based DSS provides an accurate estimation of the generated CDW quantities of twenty-one different waste streams (e.g. concrete, bricks, glass, etc.) for four different types of buildings (residential, office, commercial and industrial). With the use of mathematical programming, the DeconRCM provides also the user with the optimal end-of-life management alternative, taking into consideration both economic and environmental criteria. The DSS's capabilities are illustrated through a real world case study of a typical five floor apartment building in Thessaloniki, Greece.  相似文献   

13.
This article examines specific systematic planning steps that can be used for designing and controlling Triad projects. Triad work strategies act to limit decision uncertainty, expedite schedules to meet project milestones, and reduce costs associated with cleanup activities. As a result, the Triad approach is rapidly increasing in popularity. Good project planning has always been seen as the cornerstone of successful Triad projects. However, the specific steps in the systematic planning process have not been extensively published. Demands of Triad projects, which attempt to make maximum use of innovative technologies and sequencing of activities in a learn‐ as‐you‐go framework, put new demands on regulators and project managers alike. Specific activities and relationships are identified to assist project managers with dynamic work strategies and real‐time measurements to support improved decision making. These include: assembly of stakeholders, a core technical team, and key decisions; development and refinement of a site model; use of demonstrations of methods applicability; development of dynamic work strategies and project sequencing; real‐time data management assessment and presentation; and unitized procurement of technologies and services. © 2004 Wiley Periodicals, Inc.  相似文献   

14.
To tackle nonlinear economies-of-scale (EOS) effects in interval-parameter constraints for a representative waste management problem, an inexact piecewise-linearization-based fuzzy flexible programming (IPFP) model is developed. In IPFP, interval parameters for waste amounts and transportation/operation costs can be quantified; aspiration levels for net system costs, as well as tolerance intervals for both capacities of waste treatment facilities and waste generation rates can be reflected; and the nonlinear EOS effects transformed from objective function to constraints can be approximated. An interactive algorithm is proposed for solving the IPFP model, which in nature is an interval-parameter mixed-integer quadratically constrained programming model. To demonstrate the IPFP's advantages, two alternative models are developed to compare their performances. One is a conventional linear-regression-based inexact fuzzy programming model (IPFP2) and the other is an IPFP model with all right-hand-sides of fussy constraints being the corresponding interval numbers (IPFP3). The comparison results between IPFP and IPFP2 indicate that the optimized waste amounts would have the similar patterns in both models. However, when dealing with EOS effects in constraints, the IPFP2 may underestimate the net system costs while the IPFP can estimate the costs more accurately. The comparison results between IPFP and IPFP3 indicate that their solutions would be significantly different. The decreased system uncertainties in IPFP's solutions demonstrate its effectiveness for providing more satisfactory interval solutions than IPFP3. Following its first application to waste management, the IPFP can be potentially applied to other environmental problems under multiple complexities.  相似文献   

15.
Managing environmental issues and setting priorities requires an environmental costing procedure. The present study developed a "Model for Environmental Costs" (MEC) using five cost categories. The testing of the model in a furniture manufacturing plant showed that 35.2% of the total environmental costs were in effect mitigating correction costs, while 20.5% were prevention costs. Total environmental costs were 2.13% of the added value. The total amount of waste material amounted to 28% of the total material input. The MEC can be used as an internal management tool for priority setting and resource allocation, or for comparative analysis of industrial categories.  相似文献   

16.
Waste taxes, such as landfill and incineration taxes, have emerged as a popular option in developed countries to promote the 3Rs (reduce, reuse, and recycle). However, few studies have examined the effectiveness of waste taxes. In addition, quite a few studies have considered both dynamic relationships among dependent variables and unobserved individual heterogeneity among the jurisdictions. If dependent variables are persistent, omitted variables cause a bias, or common characteristics exist across the jurisdictions that have introduced waste taxes, the standard fixed effects model may lead to biased estimation results and misunderstood causal relationships. In addition, most existing studies have examined waste in terms of total amounts rather than by categories. Even if significant reductions in total waste amounts are not observed, some reduction within each category may, nevertheless, become evident.Therefore, this study analyzes the effects of industrial waste taxation on quantities of waste in landfill in Japan by applying the bias-corrected least-squares dummy variable (LSDVC) estimators; the general method of moments (difference GMM); and the system GMM. In addition, the study investigates effect differences attributable to industrial waste categories and taxation types. This paper shows that industrial waste taxes in Japan have minimal, significant effects on the reduction of final disposal amounts thus far, considering dynamic relationships and waste categories.  相似文献   

17.
Methodology for the accounting, generation, and composition of building-related construction and demolition (C&D) at a regional level was explored. Six specific categories of debris were examined: residential construction, nonresidential construction, residential demolition, nonresidential demolition, residential renovation, and nonresidential renovation. Debris produced from each activity was calculated as the product of the total area of activity and waste generated per unit area of activity. Similarly, composition was estimated as the product of the total area of activity and the amount of each waste component generated per unit area. The area of activity was calculated using statistical data, and individual site studies were used to assess the average amount of waste generated per unit area. The application of the methodology was illustrated using Florida, US approximately 3,750,000 metric tons of building-related C&D debris were estimated as generated in Florida in 2000. Of that amount, concrete represented 56%, wood 13%, drywall 11%, miscellaneous debris 8%, asphalt roofing materials 7%, metal 3%, cardboard 1%, and plastic 1%. This model differs from others because it accommodates regional construction styles and available data. The resulting generation amount per capita is less than the US estimate - attributable to the high construction, low demolition activity seen in Florida.  相似文献   

18.
The new EU challenge is to recover 70% by weight of C&D waste in 2020. Literature reveals that one major barrier is the lack of data. Therefore, this paper presents a model which allows technicians to estimate C&D waste during the design stage in order to promote prevention and recovery. The types and quantities of CW are estimated and managed according to EU guidelines, by building elements and specifically for each project. The model would allow detection of the source of the waste and to adopt other alternative procedures which delete hazardous waste and reduce CW. Likewise, it develops a systematic structure of the construction process, a waste classification system and some analytical expressions which are based on factors. These factors depend on technology and represent a standard on site. It would allow to develop a database of waste anywhere. A Spanish case study is covered. Factors were obtained by studying over 20 dwellings. The source and types of packaging waste, remains, soil and hazardous waste were estimated in detail and were compared with other studies. Results reveal that the model can be implemented in projects and the chances of reducing and recovery C&D waste could be increased, well above the EU challenge.  相似文献   

19.
This study compares the social costs and environmental benefits of collecting single use drink containers through the Danish deposit system with the social costs and benefits of treating the containers as part of the municipal waste-disposal system. It focuses on single use polyethylene terphthalate and glass bottles, and steel and aluminium cans. The social costs of handling these containers in the deposit system includes the costs of collection, sorting, and transportation, adjusted against the profit from selling the collected material for recycling. The social cost of incinerating these containers as municipal waste consists of the expenses for the collection, incineration of the containers and disposal of ashes. If there is any income from energy generation accompanying incineration, this is adjusted against costs. The main environmental effects related to both strategies are quantified, valuated and included in the assessment. The results of the analysis show that there are significant social costs compared to the benefits connected with the new deposit system. This is true for all four types of single use drink containers examined. All in all, Denmark bears a net social cost of 6.7 to 8.1 million Euros per year compared to a baseline of incineration with energy recovery.  相似文献   

20.
This article presents an analysis of the prospective costs of RCRA corrective action for private, nonfederal facilities. Two data bases developed by Research Triangle Institute and a remedial action cost model developed by CH2M Hill provide the foundation for this work. The methodology has two components, a remedial action knowledge base and a discrete-state Monte Carlo analysis. Under base case assumptions, it is estimated that the total costs of RCRA corrective action will be $240 billion, with a 5 percent chance the costs will be less than $170 billion and a 5 percent chance the costs will be more than $377 billion.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号