首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 265 毫秒
1.
The Environmental Impact Assessment (EIA) was first entered into force in the United States of America in 1969 through the National Environmental Policy Act. Since then, the EIA was implemented in many other countries. In Ethiopia, EIA was formally introduced in 2002 by Proclamation No. 299/2002 after the establishment of the Environmental Protection Authority (EPA) in 1995 and the formulation of the Environmental Policy of Ethiopia (EPE) in 1997. This study, which is based on a document review, interviews, and the application of a survey questionnaire, analyzes the procedures and practices of the Ethiopian EIA system, seeks to clarify fundamental information regarding the EIA system and characteristics of the key elements of EIA processes, and finally, offers suggestions that could improve EIA practices in the country. The overall result of this study shows that Ethiopia adopted EIA procedures that are similar to western models; however, despite approximately 15 years of experience, its implementation is still poor to the point that the use of EIA as an instrument of environmental management could be questioned. The challenges identified by this study include institutional, organizational, and professional capacity gaps, which, in turn, have resulted in constraints ranging from improper screening, scoping, and production of EIA reports to ineffective review, monitoring, and post‐project evaluation. Additional challenges to the system include poor governance and corruption, rapid economic growth, and the mushrooming of micro‐ and small‐scale enterprises that cause pollution and environmental degradation. This article also provides comprehensive suggestions to improve EIA practices in Ethiopia.  相似文献   

2.
A large body of literature addresses the role of science in environmental impact assessment (EIA) but less attention has been given to the views of practitioners themselves. In this research a survey of 31 EIA practitioners in Western Australia was undertaken to determine their perceptions of the quality and importance of science in EIA. The survey results are compared with previous theoretical, empirical, and survey studies of the role of science in EIA. Interview questions addressed the role of science in impact prediction, monitoring activities, mitigation and management, and EIA decision-making. It was clear from the interviews that many practitioners are satisfied with the quality of science currently used in EIA, but do not believe that it is given sufficient importance in the process. The quality and importance of science in the predecision stages of EIA was rated higher than in the postdecision stages. While science was perceived to provide the basis for baseline data collection, impact prediction, and mitigation design, it was seen to be less important during decision-making and ongoing project management. Science was seen to be just one input to decision-makers along with other factors such as sociopolitical and economic considerations. While time and budget constraints were seen to limit the scientific integrity of EIA activities, pressure from the public and regulatory authorities increased it. Improving the scientific component of EIA will require consideration of all these factors, not just the technical issues.  相似文献   

3.
In this paper the existing body of theory is reviewed to highlight the need for further attention to be paid to the EIA/management relationship. In particular it is shown that the majority of the literature to date has concentrated on the influence of EIA leading up to and including the decision to proceed or not with the proposed action. Less attention has been paid to the extension of the influence of EIA beyond this point to inform the process of ongoing environmental management. This relationship is then explored by reference to the Western Australian EIA system. One of the strengths of this system is its focus upon the implementation and management of proposed developments. The outcome of EIA is generally an approval to proceed with the development subject to meeting a suite of environmental design and management objectives.  相似文献   

4.
田明远 《四川环境》1997,16(3):7-10
我国经济发展必须符合可持续发展的战略方针,可持续发展是传统发展方式的一种新变革,它在保证经济增长的同时,要求与生态环境保护相适应,以达到提高人民生活质量和健康水平的目的。我国在过去20多年来,环境影响评价在协调环境与发展的关系中起了重要作用。本文则着重论述可持续发展的战略观点对环境影响评价在思想、内容和方法上所赋予的新的任务和要求,环境影响评价必须适应这一变革、以迎接人类社会面临的严重挑战。  相似文献   

5.
我国现行环境影响评价制度面临的问题与对策   总被引:1,自引:0,他引:1  
陈雷  殷建平  刘珩  黄庆  杜建伟 《四川环境》2010,29(3):121-126
环境影响评价制度在我国经过近30年的发展与完善,在有效加强环境管理,从源头上防止环境污染和生态环境破坏方面起到了重要作用。但从现实看,其并未能从根本上遏制我国生态环境的恶化,各级政府的发展观、环境职能部门的独立性和公正性、评价机构的中立性、环境报告编制的技术性缺失和环境影响评价制度的缺憾等问题都严重制约着环境影响评价的作用发挥,只有解决这些问题,通过完善制度、科学评价,公正审批和有效监督才能让环境影响评价真正成为环境的守护神,实现经济社会发展与自然的和谐。  相似文献   

6.
Higher economic growth in developing countries has caused higher amounts of wastes. Local government authorities in these countries usually fail to provide adequate services to dispose the increasing amounts of waste, resulting in threats for both the population and environment health. There is therefore an urgent need for recycling as a form of waste management in order to stop the devastating effects of solid waste in developing countries. Using a qualitative method of analysis, this study presents a model to measure and rank the sustainability of recycling programs in India and Tanzania. The model consists of six main constructs including “production, economic, governmental, social, technological, and international factors”. The results showed that India outperforms Tanzania in sustainable recycling programs: per capita waste generated per day in Delhi is higher than in Dar es Salaam; the government of India focuses more on developing recycling plans and techniques as compared to the government of Tanzania where the country is not actively involved in the recycling process; and the solid waste management planning in India is being performed better than Tanzania.  相似文献   

7.
In the past few decades, the demand for construction grade sand is increasing in many parts of the world due to rapid economic development and subsequent growth of building activities. This, in many of the occasions, has resulted in indiscriminate mining of sand from instream and floodplain areas leading to severe damages to the river basin environment. The case is rather alarming in the small catchment rivers like those draining the southwestern coast of India due to limited sand resources in their alluvial reaches. Moreover, lack of adequate information on the environmental impact of river sand mining is a major lacuna challenging regulatory efforts in many developing countries. Therefore, a scientific assessment is a pre-requisite in formulating management strategies in the sand mining-hit areas. In this context, a study has been made as a case to address the environmental impact of sand mining from the instream and floodplain areas of three important rivers in the southwestern coast of India namely the Chalakudy, Periyar and Muvattupuzha rivers, whose lowlands host one of the fast developing urban-cum-industrial centre, the Kochi city. The study reveals that an amount of 11.527 million ty−1 of sand (8.764 million ty−1 of instream sand and 2.763 million ty−1 of floodplain sand) is being mined from the midland and lowland reaches of these rivers for construction of buildings and other infrastructural facilities in Kochi city and its satellite townships. Environmental Impact Assessment (EIA) carried out as a part of this investigation shows that the activities associated with mining and processing of sands have not only affected the health of the river ecosystems but also degraded its overbank areas to a large extent. Considering the degree of degradation caused by sand mining from these rivers, no mining scenario may be opted in the deeper zones of the river channels. Also, a set of suggestions are made for the overall improvement of the rivers and its biophysical environment.  相似文献   

8.
Using Dynamic Modeling to Scope Environmental Problems and Build Consensus   总被引:22,自引:0,他引:22  
/ This paper assesses the changing role of dynamic modeling for understanding and managing complex ecological economic systems. It discusses new modeling tools for problem scoping and consensus building among a broad range of stakeholders and describes four case studies in which dynamic modeling has been used to collect and organize data, synthesize knowledge, and build consensus about the management of complex systems. The case studies range from industrial systems (mining, smelting, and refining of iron and steel in the United States) to ecosystems (Louisiana coastal wetlands, and Fynbos ecosystems in South Africa) to linked ecological economic systems (Maryland's Patuxent River basin in the United States). They illustrate uses of dynamic modeling to include stakeholders in all stages of consensus building, ranging from initial problem scoping to model development. The resultant models are the first stage in a three-stage modeling process that includes research and management models as the later stages.KEY WORDS: Dynamic modeling; Scoping; Consensus building; Environmental management; Ecosystem management; Policy making; Graphical programming languages  相似文献   

9.
This article reviews the present status of environmental impact analysis (EIA) with special reference to India. In India, legislation already exists that makes EIA mandatory for every new project proposal. Critically analyzing the shortcomings of the present EIA practices, this article proposes a new framework to conduct an EIA, emphasizing that it should be part of the environmental management of the area or region. Among other things, we suggest the following important points: (1) that a comprehensive database of the region be developed for use for conducting an EIA; (2) that emission standards for the proposed industry be set and the existing standards for old industries be reviewed; (3) that a directory of experts be developed; and (4) that the Department of Environment should take responsibility for conducting EIA studies by forming a study team and an evaluation team for every EIA study with members drawn from the directory of experts.  相似文献   

10.
11.
Screening is a critical decision-stage in the Environmental Impact Assessment (EIA) process and involves the determination of whether or not a development proposal will require EIA. This decision requires a discretionary judgement on whether the development has the potential to cause ‘significant environmental effects’, and consequently there is potential for diversity to exist in formal requests for EIA. Drawing upon a comprehensive survey of Local Planning Authorities (LPAs) in England and Wales, this paper explores the characteristics of LPA screening decision making since the introduction of revised EIA regulations in March 1999. The paper starts with a theoretical overview of rationality, decision making and planning theory, followed by a brief review of the regulatory context of EIA screening. The research approach is then outlined and the survey findings are presented, including a detailed consideration of organizational and individual level analyses set within the context of planning theory judgement debates. Comparisons with other European countries are briefly made, before drawing conclusions and recommendations.  相似文献   

12.
Although conservation is an inherently transdisciplinary issue, there is much to be gained from examining the problem through an economics lens. Three benefits of such an approach are laid out in this paper. First, many of the drivers of environmental degradation are economic in origin, and the better we understand them, the better we can conserve ecosystems by reducing degradation. Second, economics offers us a when-to-stop rule, which is equivalent to a when-to-conserve rule. All economic production is based on the transformation of raw materials provided by nature. As the economic system grows in physical size, it necessarily displaces and degrades ecosystems. The marginal benefits of economic growth are diminishing, and the marginal costs of ecological degradation are increasing. Conceptually, we should stop economic growth and focus on conservation when the two are equal. Third, economics can help us understand how to efficiently and justly allocate resources toward conservation, and this paper lays out some basic principles for doing so. Unfortunately, the field of economics is dominated by neoclassical economics, which builds an analytical framework based on questionable assumptions and takes an excessively disciplinary and formalistic approach. Conservation is a complex problem, and analysis from individual disciplinary lenses can make important contributions to conservation only when the resulting insights are synthesized into a coherent vision of the whole. Fortunately, there are a number of emerging transdisciplines, such as ecological economics and environmental management, that are dedicated to this task.  相似文献   

13.
Victoria enacted EIA legislation in 1978, before any other state in Australia. The current EIA system, which is administered by the state government, is based upon non-mandatory guidelines which are far more comprehensive than the provisions of the law they elaborate. As it has matured, Victoria's EIA system has developed requirements for the consideration of alternatives, screening, scoping (with project-specific outlines), EIA report-quality checks, proponent response to public comment and the preparation of a ministerial assessment report containing recommendations. The use of consultative committees to advise on scoping and EIA report preparation is one of several public participation provisions. EIA system evaluation criteria are advanced and used to help in reviewing the largely discretionary Victorian system, elements of which could serve as an example to other jurisdictions with incomplete EIA legislative requirements, such as the U.K.  相似文献   

14.
区域政策对一个区域的环境与发展的影响是持久的项目背后驱动力,引导和决定着该区域内的一切经济行为。对区域政策进行环境影响评价,以判定区域政策在特定时空范围内的宏观影响是实现区域综合决策的科学化、从政策源头落实环境保护基本国策、实施区域可持续发展战略的要求。本文论述了开展区域政策环境影响评价(以下简称EIA)的意义和基础以及评价的原则、程序和指标体系。  相似文献   

15.
Environmental impact assessment (EIA) has been promoted as an instrument for preventive environmental management in construction projects, but its performance in safeguarding the environment through influencing project decision-making is questioned. This paper probes the underlying reasons from a governance perspective as an important supplement to the regulatory and technical perspectives. A framework, with process integration, professional governance, and public engagement being its key components, is proposed to analyze the governance arrangements that enable or inhibit the effective functioning of EIA, based on which a comparative study of three infrastructure projects in China, the United States and Finland was conducted. The results reveal that, while the level of process integration and public engagement of EIA determines the degree to which EIA influences project decisions, it is the professional governance that controls the accountability of EIA. The paper has implications on institutionally where efforts should be directed to improve the performance of EIA.  相似文献   

16.
Impact scoping is the process of identifying important issues of a proposal and focusing the environmental impact assessment (EIA) on the high-priority issues. Although impact scoping in one form or another has been inherent to EIA for some time, documentation of its development and discussion of refinements to impact scoping processes have not been forthcoming. This article traces the development of impact scoping through time and highlights the need for such processes in EIA. A focused environmental assessment (FEA) approach to impact scoping that is suitable for implementation in an EIA is presented here and advantages of its use are delineated. FEA is a three-staged process that encourages impact scoping through progressive steps including impact identification, assessment and management planning. FEA combines a suite of EIA methods including: issues matrices, impact hypotheses, valued ecosystem components, and stakeholder participation sessions to effectively integrate impact scoping with EIA.  相似文献   

17.
This study aims to investigate the impact of eco-friendly technology on environmental degradation indicated using the load capacity factor (LCF) with the framework of the Load Capacity Curve (LCC) hypothesis. In this regard, an environmental degradation function is formed and analyzed using the Augmented Autoregressive Distributed Lag (AARDL) approach during the period spanning from 1975 to 2021 for India. The outcome indicates that eco-friendly technology reduces the LCF, thereby fostering environmental degradation in the long run, but the relationship is not significant in the short run. Further, an N-shaped LCC hypothesis has been observed in both long and short runs. Besides, energy consumption exhibits a LCF reducing or environmental degradation boosting role in the short run and long run. These findings are consistent with other models that are used to check the robustness of AARDL-based results. Thus, the study recommends policies for promoting eco-friendly technology, judicious economic growth, and cautious energy consumption to attain sustainable development by increasing the LCF in India.  相似文献   

18.
Summary Environmental management is a most critical input for achieving ecologically sound and balanced economic growth. It is essential that policy-makers and administrators accept the significance, principles and practices of environmental management, otherwise implementation of projects will not include the environmental protection measures. Environmental management training programmes for decision-makers are, therefore, essential. In India, The Department of Environment has initiated workshop for top level managers for sensitizing them to environmental management concepts. The experience in organizing and conducting such programmes may be of value to organizations in other developing countries, and is summarised in this paper.  相似文献   

19.
The benefits of strategic environmental considerations in the process of siting a repository for low- and intermediate-level radioactive waste (LILW) are presented. The benefits have been explored by analyzing differences between the two site selection processes. One is a so-called official site selection process, which is implemented by the Agency for radwaste management (ARAO); the other is an optimization process suggested by experts working in the area of environmental impact assessment (EIA) and land-use (spatial) planning. The criteria on which the comparison of the results of the two site selection processes has been based are spatial organization, environmental impact, safety in terms of potential exposure of the population to radioactivity released from the repository, and feasibility of the repository from the technical, financial/economic and social point of view (the latter relates to consent by the local community for siting the repository). The site selection processes have been compared with the support of the decision expert system named DEX. The results of the comparison indicate that the sites selected by ARAO meet fewer suitability criteria than those identified by applying strategic environmental considerations in the framework of the optimization process. This result stands when taking into account spatial, environmental, safety and technical feasibility points of view. Acceptability of a site by a local community could not have been tested, since the formal site selection process has not yet been concluded; this remains as an uncertain and open point of the comparison.  相似文献   

20.
This paper reports on the participation of the International Council for Local Initiatives (ICLEI) in EIA training in sub-Saharan Africa. It draws from the experiences of an EIA training project in which 365 participants from 17 African cities in six sub-Saharan African countries participated. A total of 27 resource persons from six African countries were hired and gained experience as EIA trainers for local authorities. A number of participating local authorities are already implementing and competently evaluating EIAs as a result of the training workshops. The successful implementation of EIA at the local level greatly depends on the awareness and understanding, by all the stakeholders, of the relevant legislative framework in which the EIA programme is applied. The participants were asked to identify impacts of specific projects, determine mitigation measures and recommend a suitable monitoring programme. The field exercises proved extremely valuable in that they provided a practical opportunity for workshop participants to build essential EIA skills while at the same time providing input into the actual development process in some cases. After the training workshop, participants opined that they were able to understand the value of EIA and the need for its incorporation into the decision-making process.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号