首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
ABSTRACT: The 15 federal-state interagency river basin studies (designated as Type 2 or Level B in the planning program of the Water Resources Council) of the 1960's brought together in each of the study regions, in many cases for the fist time, state and federal water resources agencies, and afforded an opportunity for coordination. Examination of the studies, however, reveals that many organizational problems remain to be solved in preparing truly comprehensive plans that effectively integrate and balance the diverse values held by study participants and concerned citizens. Burgeoning changes in state and federal laws, in planning concepts, and in public attitudes influenced the studies. Increased interest in the environment and greater emphasis on a multiple objective approach to planning for example, had significant effect. The type of organization used for carrying out these studies was a coordinating committee with one of the agencies - in most cases, the Corps of Engineers, - serving as lead agency. Some of the observed weaknesses of this arrangement were the lack of an effective mechanism for screening individual agency project proposals; unbalanced participation of agencies - for example, construction vs. non-construction, state vs. federal; agency representatives without sufficient delegated authority; insufficient control of the planning organization over individual agency participation and punctuality; and lack of emphasis on plan formulation and public participation. Suggested improvements, some of which are already being implemented in more recent studies include centralized planning staff and funding, formalized work agreements, a dynamic and continuous planning process with mechanisms for monitoring technological and social changes and evaluating planning effectiveness, planning guidelines and evaluative criteria, and a formalized training program for planners.  相似文献   

2.
ABSTRACT. Water development planning has virtually since its beginnings over one hundred fifty years ago utilized a variety of devices for involving segments of the public. But a new insistence for increased public participation, particularly at the Federal level, has stimulated re-examination of objectives and methods for relating water planning to citizen interests and preferences. Involved is partly a recommitment to democratic symbols, partly a recognition that segments of society have been overlooked, and partly a reaction to the pressures of confrontation and demonstration. The rhetoric and polemics of participation have often implied a kind of “town-meeting” process of decision, difficult at best in a nation of 200 million. In water planning more emphasis has been placed on listening to citizens, which has meant providing opportunities for influentials to express their views and preferences. A more adequate approach would seem to require identification of all who are significantly affected by plans and proposals (even though they may not perceive then-interest). But gaining greater participation does not make the planning job easier. It may increase tension and conflict; it may require difficult choices; and it can alter existing power relationships and generate changes with considerable consequences for the agency and its programs.  相似文献   

3.
ABSTRACT: The U.S. Army Corps of Engineers has broad, nationwide water resources planning and management responsibilities. In response to the needs of Corps professionals, the Hydrologic Engineering Center (HEC) has developed and supports a family of computer programs designed to aid them in their work. These programs include catchment, channel, alluvial, and statistical process models, system operation models, plan evaluation models, and data management programs. These models individually and collectively have been used throughout the Corps in a wide range of water resources planning studies.  相似文献   

4.
As freshwater resources become more scarce and water management becomes more contentious, new planning approaches are essential to maintain ecologic, economic, and social stability. One technique involves cooperative modeling in which scientists and stakeholders work together to develop a computer simulation model to assist in planning efforts. In the Middle Rio Grande region of New Mexico, where water management is hotly debated, a stakeholder team used a system dynamics approach to create a computer simulation model to facilitate producing a regional plan. While the model itself continues to be valuable, the process for creating the model was also valuable in helping stakeholders jointly develop understanding of and approaches to addressing complex issues. In this paper, the authors document results from post‐project interviews designed to identify strengths and weaknesses of cooperative modeling; to determine if and how the model facilitated the planning process; and to solicit advice for others considering model aided planning. Modeling team members revealed that cooperative modeling did facilitate water planning. Interviewees suggested that other groups try to reach consensus on a guiding vision or philosophy for their project and recognize that cooperative modeling is time intensive. The authors also note that using cooperative modeling as a tool to build bridges between science and the public requires consistent communication about both the process and the product.  相似文献   

5.
ABSTRACT: Research suggests that conflict over public participation in water resource planning is due, in part, to confusion over the nature of the policies involved. This article examines the roadblocks to citizen involvement in water resource planning in terms of two policy models: (1) the Social Feasibility Model and (2) the Political Feasibility Model. Each model posits a different role for public participation. Although the Political Feasibility Model has been widely accepted in water resource planning, changes in the nature of the policies involved in water resource management have weakened its appropriateness. Currently, social and redistributive policies involving value conflicts often dominate water planning and these policies are best chosen through the Social Feasibility Model. The article discusses the nature of the social feasibility model, the new types of policy decisions facing water resource managers, and how the social feasibility model can help overcome the roadblocks to increased public participation in water resource policy making.  相似文献   

6.
This paper describes the successful application of a multiobjective planning framework, incorporating substantial public involvement, to a major water resources decision involving intense confilcts. The study was initiated to help resolve more than a decade of controversy over a project proposed to control flooding and provide regulatory storage in the Phoenix, Arizona, area. The public was actively involved in the development of study goals and the specification of acceptable tradeoffs between multiple objectives. A wide range of structural and nonstructural alternatives was formulated and evaluated in relation to these objectives, and broad-based support was developed for a new plan. Reasons for the successful outcome are discussed, as well as implications for water resources planning under the new Federal Principles and Guidelines.  相似文献   

7.
Although planning scholars often argue that public participation improves implementation outcomes, this relationship is rarely empirically tested. This study investigates how public engagement, during planning and after plan adoption, impacts on the speed of local government sustainability plan implementation. It includes a correlation analysis of quantized in-depth interviews with sustainability planners in 36 American cities. The study finds that individual characteristics of public engagement, both during planning and after plan adoption, had statistically significant relationships to implementation speed, but in some cases this relationship was negative. The correlations imply that sustainability planners can make strategic choices to improve implementation speed through public participation in plan creation and after plan adoption. Alternatively, planners also make choices during participatory planning that slow implementation, a problematic outcome when the ultimate goal of a planning process is on-the-ground change.  相似文献   

8.
ABSTRACT: In the arid West, the development and implementation of water policy often results in disputes among water users, resource managers, and policy makers. Although significant attempts have been made to improve public involvement and dispute resolution in water resources planning, the traditional planning process has not historically played this role for a variety of reasons. Water resources planning can become a forum for proactively resolving water policy disputes by employing the principles of environmental dispute resolution. The purpose of this article is to explore the role of collaborative, consensus-building planning processes in resolving water policy disputes. The Montana State Water Plan is evaluated as an example of such a process, and a model state water planning process is outlined.  相似文献   

9.
ABSTRACT: Texas is one of the states in which limitations in water supplies could severely constrain economic growth in certain areas. The traditional planning approach for addressing this problem has involved devising schemes for large water development projects, which for many years included the importation of water from other states. Now the attitude towards water resource management is changing, and it is generally agreed that better management of existing supplies is the preferred approach. In this paper we review some of the changes that have recently occurred in Texas, including attempts to streamline the water institutions in such a way that they might be more responsive to the need for more comprehensive management of water resources statewide, with greater emphasis on social and environmental concerns.  相似文献   

10.
ABSTRACT: Computer-aided planning (CAP) for multiple-purpose reservoir operations involves use of state-of-the-art simulation and optimization methods, color graphic displays, and interactive computing interfaces. These technologies were integrated into a coherent system that has user-friendly interfaces to help the process of communicating reservoir system operations, solicit planning participant preferences and valuation judgments, and provide understandable feedback of system performance. The CAP system was imbedded in a comprehensive public involvement program that paralleled the reservoir operating policy modeling process, as part of multipurpose reservoir operations planning on the Great Plains Reservoirs in Colorado. Experience with the approach indicates the involved publics can quickly learn of reservoir system limitations and opportunities, and can indeed participate in the operations planning process.  相似文献   

11.
ABSTRACT. The purpose of this paper is to present and discuss a procedure for finding an optimal staging plan for implementing a multi-basin water resource system-a system that must meet, with tolerable shortages, pre-specified but highly variable demands for water that increase over time-a system such as the proposed Texas Water System. The paper stresses that, in the past, planners have paid little attention to quantifying explicitly the impact that uncertainty has on the decision process, and in that context, presents a means for explicitly evaluating the impact that uncertainty has on finding and evaluating the performance of the optimal and several alternate staging plans. The procedure presented evaluates the impact that uncertainty, in both the hydrologic and the economic variables, has on the decisions that need to be made. The decisions requiring resolution are (1) which of an over-specified set of facilities should be constructed, (2) how large each of the facilities should be at various points in time, and (3) how should the system be operated so as to minimize the capital plus operational costs over the planning period.  相似文献   

12.
Public participation in decision making is a central component of the planning process; however, implementing effective engagement initiatives to resolve complex planning and policy problems, such as climate change, is challenging for planners. These challenges are particularly acute in coastal communities throughout Australia, where many settlements are at risk of future climate perturbations. Using the International Association for Public Participation framework for public participation, we analyse three local government led public participation initiatives in New South Wales, Victoria and Tasmania, Australia. Our analysis suggests there are three critical factors that can influence the level of public participation in the context of climate change adaptation: the technocratic approach to decision making; absent high order government support; and the lack of evaluation mechanisms for public participation.  相似文献   

13.
ABSTRACT: In the environmental and agricultural conservation planning process, more efficient and effective tools are needed for planners to assist private landowners with making wiser land use decisions. Current methods are slow, inefficient, and costly. Scientific techniques have not been fully implemented within the planning process, yet such plans are increasingly needed to meet water quality and Total Maximum Daily Load (TMDL) requirements. The objectives of this study are to (a) utilize the web for accessing an integrated science‐based land use decision support system; (b) link decision tools, models, and databases to the user via the web; (c) link distributed models and databases for enhanced planning efficiency; and (d) integrate the above into an easily usable and readily accessible system. The procedures resulting in the initial design involved planning expertise and focus groups' input. The system was developed in partnership with the Natural Resources Conservation Service of the U.S. Department of Agriculture and several state agencies. A survey of 150 certified conservation planners, the end users, was conducted to identify the data sets and planning tools needed. Data, tools, and models then were selected and integrated into a web accessible system. Specifically, the first generation used a web interactive Geographic Information System (GIS) that overlaid onto digital orthoquads and/or soils polygons field boundaries, transportation, hydrologic features (such as drains, rivers, lakes, etc.), and high pesticide risk runoff or infiltration areas. Conservation planners found they could save time with the system. Clients could access the system quickly to help them prepare for meeting with their planner. Previously acquiring GIS maps in some cases had been a lengthy process that limited use of the information in land use decisions.  相似文献   

14.
ABSTRACT: Although droughts are a frequent occurrence over much of the United States, response by state and federal government has been ineffective and poorly coordinated. Recently, several states have recognized the value of drought emergency planning and have developed plans to assist them in responding more effectively to prolonged periods of water shortage. These states have created an organizational structure to coordinate the assessment and response activities of state and federal agencies. Each state's drought response plan is unique since each state's water supply and management problems, and their consequent impacts, are unique. The drought response plans developed by Colorado, South Dakota and New York are reviewed here in detail. We recommend that other states affected by frequent and severe water shortages also develop drought emergency plans. These plans will enhance state government's ability to implement effective measures in a timely manner and, ultimately, may provide added incentive for the federal government to develop the national drought response plan called for by the General Accounting Office in 1979.  相似文献   

15.
ABSTRACT: The growing demands by the public for a more active role in planning have recently generated considerable interest among researchers and planners in the subject of public involvement techniques. Numerous surveys have found that standard public participation techniques (e.g., public hearings) by themselves are considered inadequate. Several techniques that have potential for overcoming some of the limitations of standard public involvement techniques have recently been developed. This paper describes several of these new techniques and analyzes each of them in terms of their potential utility in water resources planning.  相似文献   

16.
ABSTRACT: Individuals involved in state water resource planning generally have avoided any development of a comprehensive public water planning investment model that would set the stage for quantitative recommendations of a “what ought to be” tone for future water strategies. Three New Hampshire towns were selected to illustrate the usefulness of a mixed integer multiperiod programming model that utilizes hydrologic and economic data for identifying the discounted least cost of water supply, distribution, and scheduling. Comparisons are made regarding the feasibility of a regional water system approach versus independent “town by town” water supplies that presently prevail. To analyze the sensitivity of optimal water planning solutions to projected water demands, variations in these demands are made.  相似文献   

17.
ABSTRACT: Proper planning of water resource management programs is the essential ingredient for effective decision-making. Increasing demands on our finite water resources make it more vital that programs get off the shelf and are acted upon. There is a gap between our intentions for and OUI results from the planning process. We should examine our failures, identify causes, and learn from them. One of the primary causes is failure to identify the potentials of the implementing agencies early in the planning process. These agencies constitute a hierarchy of governmental units at national, state, regional and local levels. Each of these levels has its own interests, point of view, capabilities and constraints. A plan which is technically and functionally sound can fail as a program if these conflicting interests are not accounted for. The implementation mechanisms must be identified as an initial phase of the planning process. All levels of the governmental hierarchy must be involved throughout the planning process. The successful plan must also provide for suitable assignment of responsibilities which are accepted by the executing agency and monitored for satisfactory fulfillment. Consistency and continuity of the advocate agency are further essential elements to the success of the plan. Experience in water resource management planning has shown that these strategies will produce programs which are accepted, implemented and accomplish the goals and objectives of the planning process.  相似文献   

18.
ABSTRACT: Drought has been a prevalent feature of the American landscape during the latter part of the 1980s, producing serious socioeconomic and environmental consequences. These recent experiences with drought have renewed concern about the inadequacy of federal and state contingency planning efforts and the lack of coordination for assessment and response efforts between these levels of government. This paper presents the results of research aimed at facilitating the preparation of drought contingency plans by state government in conjunction with a state's overall water management planning activity. The ten-step drought plan development process reported is intended to improve mitigation efforts through more timely, effective, and efficient assessment and response activities. Officials in appropriate state agencies should examine the proposed framework and alter it to best address drought-related concerns, adding or deleting elements as necessary.  相似文献   

19.
Historically, the main objective of water resources development has been economic efficiency, and the technique for its evaluation has been benefit-cost analysis. Gradually other objectives have emerged, and these in order of their emergence are regional income redistribution, environmental quality and social well-being. These multi-objectives have given rise to multifarious problems, and have made the planning process much more complex than ever before. The different objectives are not mutually exclusive, and, hence, contributions to one can only be made at the expense of others. Trade-off studies between different objectives are difficult to make. It is suggested that one way to overcome this difficulty could be to design a system to perform optimally in terms of one objective, subject to a specified level of performance of the other, which in effect becomes a constraint. The paper also discusses the pros and cons of the desirability of public participation in our decision-making processes, and the necessity of developing social sciences models to aid water planning and management.  相似文献   

20.
Participatory planning applied to water resources has sparked significant interest and debate during the last decade. Recognition that models play a significant role in the formulation and implementation of design and management strategies has encouraged the profession to consider how such models can be best implemented. Shared Vision Planning (SVP) is a disciplined planning approach that combines traditional water resources planning methodologies with innovations such as structured public participation and the use of collaborative modeling, resulting in a more complete understanding and an integrative decision support tool. This study reviews these three basic components of SVP and explains how they are incorporated into a unified planning approach. The successful application of SVP is explored in three studies involving planning challenges: the National Drought Study, the Lake Ontario‐St. Lawrence River Study, and the Apalachicola‐Chattahoochee‐Flint/Alabama‐Coosa‐Tallapoosa River Basin Study. The article concludes by summarizing the advantages and limitations of this planning approach.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号