首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Biodiversity, soil, water, air, climate, landscape and other components are typically analyzed in Environmental Impact Assessment (EIA) when looking for the effects of a given project on the biological and ecological components of the environment. Strategic Environmental Assessment (SEA) tends to follow the same general pattern, when looking for the environmental effects of plans and programs. In both cases, ecosystem services are often not explicitly considered. We developed a framework to analyze environmental assessment (EA) practice and infer about ecosystem services based on existing evidence from EIA and SEA reports and supporting information. Our framework addresses the relations between ecosystem services and the environmental factors assessed in EIA and SEA, considering the relevant conceptual frameworks such as the ES cascade model and the DPSIR framework applied to ES provision. We base our proposals on results from a preliminary meta-analysis of recent EIA and SEA reports from several types of plans and projects in Portugal, in which implicit assessments of ES were clearly predominant. We discuss the implications of those results and the opportunities to infer about ecosystem services, and conclude on the need for more dedicated and explicit efforts to ecosystem services assessment in EIA and SEA.  相似文献   

2.
Analytic–deliberative techniques have been suggested as a promising approach to ecosystem service (ES) valuation but are still at an experimental stage. This paper contributes to the development of ES valuation in the environmental impact assessment (EIA) procedure by introducing an analytic–deliberative approach to assessing restoration options for a regulated river in Finland. Multi-criteria decision analysis (MCDA) with a value-focused approach was applied and compared with a desktop application of the ES-focused MCDA approach. We found out that the concept of ES could bring added value to the assessment process by: 1) enabling the framing and valuing especially of provisioning services — final ecosystem services, such as salmon catch in a more understandable way for the stakeholders, and 2) taking into account ecosystem processes and supporting services more precisely. However, some potential dangers of using the ES-based approach could include ES's appearing as a distant mode of thinking to affected groups and other stakeholders, and neglect of the trade-offs between ES and other relevant value and impact categories. Thus, although the ES framework is promising, it should not form a rigid ‘checklist’ way of making assessments but should rather be used to widen perspectives about potential issues in linking ecosystem properties to human benefits and values. It is argued that by combining the ES framework with the interactive MCDA approach, we can form a comprehensive and integrated approach to incorporating ESs into EIA.  相似文献   

3.
Highway construction or expansion projects are among major activities of economic development especially in developing countries. However, road development consistently can lead to major damages to the environment, including habitat fragmentation and ecological instabilities and a considerable threat to fauna and flora. At this point, Environmental Impact Assessment (EIA) in road developments is needed to address and evaluate the ecological issues in decision-making. The object of this study is to strengthen the consideration of ecological issues, i.e., biodiversity in the existing EIA tools. This paper regards a network method as a means to make informed planning decisions by the lessons from a case study. The results indicate that network method is well suited to be applied in ecological impacts assessment. However, some limitations such as complexity and time consumed make casual networks unpopular. Also, impact of traffic noise on acoustic communication (wildlife and human) was performed. It has been shown that sound level for human is much higher than admissible standards. Finally, the study expresses some mitigation measures to improve the acquisition for environmental impact assessment process.  相似文献   

4.
Environmental impact assessment (EIA) is a policy tool used for evaluating a project proposal from physical and socioeconomic environmental perspectives. Its aim is to reduce the impact of development on environment, hence, ensuring environmental sustainability. It is mandatory to submit an Environmental Impact Statement before starting a mega project as required by Environmental Protection Act of 1997 and Environmental Policy of Pakistan. Public consultation plays a key role in an EIA system, identifying the likely aspects and impacts of a development activity. This aspect has been ignored in effective enactment of environmental legislation in Pakistan. Sufficient legislative instruments are there to support EIA system in the country but the agencies responsible for the enforcement of environmental regulations have failed to do so. The current research gives an insight into the actual status of EIA system in Pakistan along with the feedback of EIA specialists and university teachers of the concerned departments. A new index has been devised on the basis of questionnaire response to work out the overall performance of EIA system in Pakistan or any other country. The weaknesses and deficiencies of each EIA stage have been worked out for Pakistan and elaborated with the help of the controversial Zero point Interchange Project in the capital city of Pakistan.  相似文献   

5.
6.
Considerable attention has been given to the effectiveness of environmental impact assessment (EIA) since the 1970s. Relatively few research studies, however, have approached EIA as an instrument of environmental governance, and have explored the mechanisms through which EIA influences the behaviour of actors involved in planning processes. Consequently, theory in this area is underspecified. In this paper we contribute to theory-building by analysing the effectiveness of a unique EIA system: the Danish system. In this system the competent authority, instead of the project proponent, undertakes EIA reporting. Additionally, the public, rather than experts, play a central role in quality control and the Danish EIA community is relatively small which influences community dynamics in particular ways. A nation-wide survey and expert interviews were undertaken in order to examine the views of actors involved in EIA on the effectiveness of this anomalous system. The empirical data are compared with similar studies on governance mechanisms in other countries, especially the United Kingdom and the Netherlands, as well as with earlier evaluations of EIA effectiveness in Denmark. The results indicate that the more extensive role attributed to the competent authority may lead to higher EIA effectiveness when this aligns with their interests; the influence of the public is amplified by a powerful complaints system; and, the size of the EIA community appears to have no substantial influence on EIA effectiveness. We discuss how the research findings might enhance our theoretical understanding of the operation and effectiveness of governance mechanisms in EIA.  相似文献   

7.
The Environmental Impact Assessment (EIA) System, which embodies the ??prevention principle?? of the environmental law, is an important tool for environmental protection. This tool has a private importance for Turkey since it is a developing country, and it entered the Turkish law in 1983 with the Environmental Law. Besides, the EIA Regulation, which shows the application principles, became effective in 1993. Because Turkey is a candidate for European Union (EU), the EIA Regulation has been changed due to the EU compliance procedure, and its latest version became valid in 2008. This study aims to emphasize The EIA system in Turkey to supervise the efficiency of this procedure and point the success level. In the introduction part, general EIA concept, its importance, and some notations are mentioned. Following that, the legislation, which builds the EIA system, has been analyzed starting from the 1982 Turkish Constitution. Then, the legislation rules are explained due to the basic steps of the EIA procedure. In order to shed light upon the application, the EIA final decisions given until today, the results, and their distributions to the industries are assessed. In the final part of the study, a SWOT analysis is made to mention the weaknesses, strengths, opportunities, and threats of the EIA system in Turkey.  相似文献   

8.
Follow-up is a vital component of Environmental Impact Assessment (EIA), being essential for understanding assessment outcomes. Long-standing international best practice principles for EIA follow-up are reviewed, and revisions proposed, based on workshops with academics and practitioners, literature review and self-reflection. The proposed revision of EIA follow-up principles will feature an introduction with a simple definition and explanation of objectives for follow-up, and 15 principles. The revised principles address: objective; context; early establishment; project life-cycle; transparency; accessibility; accountability; performance criteria provision; enforcement; learning; adaptive environmental management; flexible or adaptive approach; tiering; cumulative effects and overall performance evaluation. Through publishing this proposal, it is hoped to simultaneously inform or inspire EIA practitioners to enhance their own follow-up knowledge and practices, and to seek input for further refinements that might lead to a revised set of international best practice principles for EIA follow-up.  相似文献   

9.
Environmental impact assessment (EIA) serves as a gatekeeper to prevent environmental pollution, and public participation is a legal requirement in the EIA process that ensures people's awareness of activities that may jeopardize the environment. Recently, with the elevated awareness of environmental protection and increasing environmental sensitivity, EIA has evolved as a means for the public to show their attitudes towards environmental issues. More frequently, public protests against not-in-my-backyard (NIMBY) facilities have become a significant challenge in the government's decision-making process. Government officials and EIA practitioners continue to look for a more effective way of public participation and aim to establish a platform that can involve related stakeholders. However, current research on public participation is limited to individual case studies or lacks a systematic approach to analysing diversified modes of public participation, which may differentiate levels of acceptance by the government in the EIA process and consequently lead to different effects. Therefore, from the perspectives of the participation extent and conflict level, this paper aims to establish an integrated framework to categorize different public participation patterns in EIA practices and to analyse their characteristics, such as preferences and the action logic arising from different stakeholders, including the government and public. The paper concludes that collaborative public participation is a possible way to strengthen the effectiveness of public involvement within the Chinese context.  相似文献   

10.
More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.  相似文献   

11.
12.
In this paper, we first review the development of China’s Environmental Impact Assessment (EIA) system in the past 30 years. Then we compare the framework and operational procedures of China’s new EIA law with those of the EU EIA Directive. We also compare public participation, as well as sanctions and control in the two EIA systems. In addition, we identify where the processes in both EIA systems are similar or different from one another. By comparison, we noted that there are at least three obvious weaknesses in China’s EIA system: (1) the application of new models for EIA legislation; (2) the improvement of EIA guidance and education; and (3) the enhancement of public participation in EIA process. Our study indicates that these three major shortcomings should be overcome and improved in China’s EIA system, when compared with the EU EIA system.  相似文献   

13.
Environmental Impact Assessment (EIA) agencies worldwide face multiple challenges that compromise their performance and in turn EIA procedural effectiveness. The current study aimed to evaluate the performance of the Environmental Protection Agency (EPA) of Punjab, Pakistan and the problems it faces whilst implementing EIA and ensuring EIA effectiveness. Semi-structured interviews were used to collect data for the study. EPA performance and procedural effectiveness were evaluated using the formal and informal roles of EPA and EIA good practices respectively. They were also linked to regulatory framework, capacities of actors and contextual factors. Study found that EPA and EIA system performance is weak. Consequently, procedural effectiveness is compromised. The main causes include limited capacities of EPA, consultants and proponents; lack of political will; political interference and outdated regulations. A strong political will of the government is required to enhance the capacity of EPA and other actors in terms of motivation or “the will to” and means or “the ability to”. Measures taken by international EIA agencies to improve performance and effectiveness have also been discussed. Based on this study, lessons can be learnt by not only EPA Punjab but also other agencies in Pakistan and international agencies facing similar challenges.  相似文献   

14.
Increasing concerns over climate change have prompted rapid growth of renewable energy over the past few decades, particularly wind energy. However, as the installation of wind farms rises, so will the need for decommissioning and analysis of the environmental impacts associated with decommissioning. This paper investigates how Environmental Impacts Assessments (EIA) identify, estimate and manage potential impacts of decommissioning. EIAs from 12 onshore and offshore windfarms consented between 2009 and 2014 in England and Scotland were analysed and compared. Attributes of these windfarms' Environmental Statements (ES) were scored under six categories: decommissioning in EIA stages, definitions of decommissioning, amount of analysis, depth of analysis, impacts identified, and proactive planning. Onshore windfarms generally tended to investigate the impacts of decommissioning less than offshore windfarms, even those which gained consent in the same year. The investigation of the impact of decommissioning improved for windfarms consented in the latter years of the study period. Across the ESs there was a lack of analysis of potential impacts from decommissioning in their own right: not simply as a reversal of the construction process. The impacts of different end of life scenarios were not analysed in any of the ESs studied. There is evidence to suggest the presence of windfarms, especially offshore, could in some cases be environmentally beneficial for certain species. However, the ecological impact of removing offshore structures at the end of life is unknown and is currently not investigated nor predicted in EIAs. Understanding the potential implications of full or partial removal of marine structures, or alternatives to decommissioning, could ensure that appropriate mitigation is considered at an early stage by both developer and consenting authority. That being said, it is also important to update the assessment of potential impacts over the life of the project as more information on the environment is gathered and end of life plans develop.  相似文献   

15.
Land take is emerging as a global environmental concern, and is particularly critical in intensively developed and land-scarce regions. This paper seeks to understand the effectiveness of the screening stage of Environmental Impact Assessment (EIA) in addressing land take. Screening is the stage where a decision is made as to whether an EIA is required for a project. In many jurisdictions, screening results in three pathways: full EIA directly, preliminary EIA only, or preliminary EIA followed by full EIA. We compared the land take of 217 projects triggering the different pathways in a study region in Italy over a 15-year time interval. Land take was quantified by overlaying the footprint of the projects with a land cover map.The results show that while more attention was given to projects with larger land take impacts overall, the cumulative land take from smaller projects not triggering full EIA was considerable (40% of overall land take). The case-by-case examination conducted through the preliminary EIA was found to work better for some project types (ski areas and small urban development), than for others (quarries). Our findings lead us to advocate improvements in current screening procedures to ensure that the land take impacts are quantified and made explicit in preliminary EIA reports. Our evidence-based approach to determining land take in EIA provides a compelling basis for understanding ways to improve EIA policies, guidance and practice.  相似文献   

16.
The integration of knowledge from stakeholders and the public at large is seen as one of the biggest process-related barriers during the scoping phase of EIA application in transport planning. While the academic literature offers abundant analyses, discussions and suggestions how to overcome this problem, the proposed solutions are yet to be adequately tested in practice. In order to address this gap, we test the effectiveness of a set of interventions and trigger mechanisms for improving different aspects of knowledge integration. The interventions are tested in an experiential study with two sequential cases, representing “close-to-real-life” conditions, in the context of two cities in Andalusia, Spain. In general terms, the participants perceived that the integration of knowledge improved during the simulation of the EIA scoping phase. Certain shortcomings were also discussed, fundamentally related to how the time spent during the scoping phase was crucial to lead an effective learning process between the involved people. The study concludes with a reflection on the effectiveness of the tested interventions according to similarities and differences obtained from the two experiential case studies, as well as with a discussion of the potential to generate new knowledge through the use of experiential studies in EIA practice.  相似文献   

17.
In this study, we carried out a comparative analysis of the Chilean Environmental Impact Assessment (EIA) system using evaluation criteria compared against three countries to allow for an objective evaluation within the growing demand of society for a more creditable and trustable EIA system.A total of 18 evaluation criteria were selected from the literature, and four new criteria for comparing EIA systems were proposed. The Chilean EIA system was compared to that of Brazil, Spain, and Canada using the following four evaluation criteria categories: EIA Legislation (four criteria), EIA Administration (four criteria), EIA Process (eleven criteria), and After EIA (three criteria). A Hierarchical Agglomerative Cluster Analysis for assessing similarity among the EIA systems of Chile, Canada, and Spain was performed: the similarity being 88%. A Principal Component Analysis shows that only 13 of the selected 22 criteria contribute to the variability of the selected EIA systems. The main strengths of the Chilean EIA system are the existence of Specialized Environmental Courts for the resolution of disputes and Appeal options before execution. The identified weaknesses are an EIA system with high centralization at the national level, the absence of consideration of project alternatives, no requirement for scoping, and that the process of Strategic Environmental Assessment is not binding.Modifications to the Environmental Impact Assessment System Regulation are proposed by authors as feasible improvements particularly in relation to, Decentralization of the EIA system, Alternatives for design, Scoping incorporation, Register of reviewers of baseline information, and the public information process and post-evaluation.The method used seeks out to serve as guidance for countries with similar environmental and social contexts, as well as environmental legislation improvement needs.  相似文献   

18.
The Environmental Impact Assessment Directive (EIA Directive) has created a reference framework for the implementation of the system of Environmental Impact Assessment (EIA) into the legal systems of the Member States of the European Union, including the countries belonging to the Visegrad Group (V4): Poland, Slovakia, the Czech Republic and Hungary. The Directive was the basis for the introduction of compulsory stages of the EIA process in the V4. The stages were then adapted to national requirements, including thresholds of the qualifying criteria of projects at the screening and scoping stages. The EIA system in the analysed countries has been growing, changing and being modified together with the political and economic changes of the last 30 years. Although all Visegrad Group countries are members of the EU and should harmonize the provisions of the EIA Directive and its amendments, there still exist singularities in each country's national EIA legislation, in terms of complementarities among the V4 countries, access to information resources, protection of natural resources, mitigation of socio-environmental impacts, or transboundary impact assessment. The article compares and evaluates the EIA systems in the four countries, specifies similarities and differences in the implementation of administrative proceedings and points out opportunities to strengthen the system. It presents selected results of a study conducted in 2013 within the framework of the international project “Assessment of the quality of the environment in the V4 Countries” (AQE V4). This paper indicates examples of good practice in the EIA systems and the obtained results are compared regarding the amendments to the current European Union EIA Directive.  相似文献   

19.
基于关系数据库的环境监测知识库的建立   总被引:5,自引:0,他引:5  
“环境监测专家系统”可有效监控环境污染状况 ,对环境污染作分析、评价、分级、预警等 ,促进环境的管理和改善。环境监测知识库是该专家系统的核心 ,通过知识库 ,专家系统可以自我学习 ,自我诊断 ,自我发展。本文通过对知识库和数据库的分析比较 ,指出在关系数据库平台上建立环境监测知识库的可行性 ,给出了在关系数据库系统中建立环境监测知识库的方法 ,即如何在关系数据库环境中实现环境监测知识获取、表示和管理  相似文献   

20.
This research is an attempt to verify the notion postulated by Robert Bartlett and Lynton Caldwell that the full benefits of environmental impact assessment (EIA) would take decades to be realized. While EIA is intended to directly influence decision-making regarding new development proposals, the process is also expected to lead to organisational learning and transformation over time. Our aim was to examine the influence of EIA on a single Western Australian proponent with sustained experience in the process to understand how EIA is used within the organisation and to seek evidence of transformation of the organisation's purpose and mission. The research reviewed literature in order to identify key influences of EIA on organisations, along with semi-structured staff interviews and document analysis for the case study organisation. Ascertaining causality that involvement in EIA processes influences or effects organisational learning and transformation is a challenge in the face of other societal events. Document analysis and interviewee data indicates that the action-forcing nature of EIA did influence proponent behavior through the creation of internal processes seeking to ensure robust design of new projects that would satisfy environmental protection expectations, without the need to trigger formal EIA. Evidence of EIA values and thinking were apparent within internal documentation, including the evolving mission statement. Our research indicates that participation in the EIA process can positively influence organisational learning and transformation by guiding internal change for decision-making.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号