首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到15条相似文献,搜索用时 0 毫秒
1.
Summary This study is carried out to propose an appropriate treatment technology for wastewater discharged from a flavor production factory. Industrial wastewater discharged from this factory ranges between 50–70 m3/d with an average value of 60 m3/d. The major source of pollution in this factory is due to cleaning of the vessels therefore the treatment has been carried out on the end-of pipe wastewater. The wastewater is characterized by high values of COD, BOD, TSS and Oil and grease 4646, 2298, 1790 and 626 mg/l respectively. Primary sedimentation of the wastewater for four hours reduced the COD, BOD, TSS and Oil and grease by 43, 47, 80 and 74%, respectively. For the treatment of the produced wastewater, the biological treatment process such as activated sludge, rotating biological contactor (RBC), up-flow anaerobic sludge bed reactor (UASB) have been selected. The results from each treatment process proved to be efficient for the treatment of such wastewater. The treated wastewater characteristics are in compliance with the Egyptian law which regulates the discharge of industrial wastewater to the sewerage system. The RBC was selected and installed by the factory as it has the advantage of low operating and maintenance costs. The factory RBC performance was monitored; characteristics of the treated effluent in terms of oil and grease, COD, BOD and TSS were 27, 362, 139 and 95 mg/l, respectively.  相似文献   

2.
刘精今 《四川环境》1998,17(3):27-31
调查分析了当前应用于中小型锅炉湿法除尘废水循环回用治理的技术,根据除尘废水循环回用后的水质和工艺特点,提出将除尘循环水净化同燃煤烟气脱硫除尘联合进行以及利用工业碱水,炉渣处理除尘废水的技术和工艺  相似文献   

3.
本文主要对真丝染色综合废水A/O处理中所产生的污泥进行无污泥化生物处理的研究,并把技术运用在日处理900t/d的综合废水生化处理装置上,设施经四年连续运行表明:出水pH=7. 36,SS=48mg/1,CODcr=95mg/1,BOD5=38mg/1,NH3-N=18 .8mg/1,出水水质指标全部达到国家规定的排放标准,该技术不仅解决了污泥的难治理问题,而且利用生物技术彻底解决了污泥的二次污染问题,还节约了可观的运行费用和投资费用,并提高了A/O的处理效果。  相似文献   

4.
肖鸿  杨平  郭勇 《四川环境》2005,24(2):4-7,10
本实验采用新型厌氧—好氧一体化反应器处理高浓度有机废水,主要研究了系统的启动与运行性能,并对系统的NH3 N去除效果作了初步考察。实验结果表明:在16℃~24℃的自然温度下,采用递增负荷、厌氧和好氧分期启动的方式,系统可在38天内达到较好的启动效果;在系统负荷运行期内,当系统总进水COD浓度平均值为3601 8mg/L,总出水COD浓度平均值为384 0mg/L,系统容积负荷平均值为2 54kgCOD/(m3·d),系统总HRT平均值为35 1h时,系统总COD去除率平均值达90 6%。实验还发现:当进水NH3 N浓度为280 3~350 7mg/L,整个系统的NH3 N去除率在68 5%~91 7%,平均为81 0%。由此说明,本反应器具有很好的COD去除性能和NH3 N去除效果,适合于处理COD浓度高且含有中等NH3 N浓度的有机废水。  相似文献   

5.
Istanbul has experienced rapid increases in population to more than 12 million people, which has created infrastructure problems of water supply and wastewater treatment and disposal. In this article, the achievements and approaches of the Istanbul Water and Sewerage Administration (ISKI) to solve the water shortage problem and to improve services are summarized. Istanbul had a very severe water shortage problem in 1994 because of ignorance of the implementation of the needed projects. After reviewing the reasons and causes of the problem, new priority criteria adopted after 1994 are given. Following the implementation of the projects determined according to the aforementioned criteria, water supplied has exceeded the water demand. The added capacity is equal to one to three times of the capacity built up to 1994 for water treatment, service reservoirs, pumping stations, transmission lines, and the water distribution network; water quality has been improved the meet local and international potable water standards. Unaccounted for water has been reduced from 60% to 27%. The percentage of treated wastewater has been increased from 10% to 90% in 8 years, resulting in drastic improvements and rehabilitation of the Golden Horn and coastal water quality. Through improved customer services, complaints were reduced from 33% in 1994 to 0.3%. Some of the main criteria and the approaches behind this success are summarized. Published online  相似文献   

6.
本文阐述了工业废水达标排放的重要意义,分析了工业废水达标排放的可能性,并提出改革污水处理运作模式的几点建议,对实现“一控双达标”月标具有一定的指导意义。  相似文献   

7.
基于工作过程的《二级污水处理厂运行、维护与管理》课程设计采用情境教学模式,以工作过程为导向将各教学情境对应工作岗位,以人为本,以实践为主导,以培养能力为本位,采用多种方法和手段进行教学,多种考核形式相结合进行知识学习成果评价。  相似文献   

8.
Integrated water resource management (IWRM) requires accounting for many interrelated facets of water systems, water uses and stakeholders, and water management activities. The consequence is that project analysis must account for the nonseparability among the component parts of IWRM plans. This article presents a benefit‐cost (B‐C) analysis of a set of projects included in the Yakima Basin Integrated Plan proposed for the Yakima Basin in south‐central Washington State. The analysis accounts for interdependence among proposed water storage projects and between water storage and water market development in the context of historical and more adverse projected future climate scenarios. Focusing on irrigation benefits from storage, we show that the value of a given proposed storage project is lower when other proposed storage projects in the basin are implemented, and when water markets are functioning effectively. We find that none of the water storage projects satisfy a B‐C criterion, and that assuring proposed instream flow augmentation is less expensive by purchasing senior diversion rights than relying on new storage to provide it.  相似文献   

9.
Integrated watershed management (IWM) is a priority, especially in semiarid regions that are concurrently affected by population growth, land use change, soil erosion, and poor governance. In developing countries, IWM is often done without any support tool, scientific data, or deep knowledge of territory characteristics. The aim of this study was to present a case study to apply a decision support tool to prioritize areas for territory management. A simple, quantitative multi‐criteria analysis was applied in a semiarid basin of the Ecuadorian Andes to identify the zones of greatest concern for implementation of resource conservation and management practices at a local and regional scale. In addition to describing the current state of the conditions of this basin, our results suggest scenarios of change in relation to official population projections based on spatial analysis of land use change. Analysis resulted in a scattered distribution of priority values within the watershed, so a hierarchical rule was incorporated to define priorities at the subwatershed (SW) scale. Our analysis identified four SW of very high priority and urgent need to implement management practices. Based on projections of future change due to population growth and land cover change, the number of subbasins that require more attention was doubled. Finally, this study includes zones for management or conservation of the land, according to the Sustainable Development Goals.  相似文献   

10.
Best management practices (BMPs) are widely used to mitigate impacts of increased impervious surfaces on stormwater runoff. However, there is limited detailed and up‐to‐date information available on the cost of designing, constructing, and maintaining BMPs over their lifetime. The objective of this study is to analyze BMPs recently constructed by the Virginia Department of Transportation (VDOT) to quantify their total cost per pound of phosphorus removed annually. A motivating factor for the study is recent changes to regulatory guidelines in Virginia which allow for full or partial substitution of purchased nutrient credits in lieu of constructing onsite BMPs to achieve compliance with stormwater quality regulations. Results of the analysis of nine BMPs found their cost ranged from $20,100 to $74,900, in 2014 dollars, per pound ($44,313‐$165,126 per kg) of phosphorus removed. Based on these results and assuming current credit prices procured by VDOT, purchasing nutrient credits is a cost‐effective option for the agency, especially when factoring in the cost of additional right of way for the BMP. Based on this finding, we expect compliance with stormwater quality regulations through credit purchases to become more widely used in Virginia. Moving forward, we suggest more direct tracking of BMP costs to support comparisons between BMP costs across a range of types and conditions to credit purchases for meeting stormwater regulations.  相似文献   

11.
海岸带地区是陆海交互作用区,是陆海统筹中需要重点关注的区域,党的十九大报告里提出要坚持陆海统筹,《深化党和国家机构改革方案》中提出整合原环境保护部等部委的相关污染防治和生态保护执法及国家海洋局的海洋环境保护职责,组建生态环境部。本研究通过对厦门市陆海统筹政策现状系统梳理分析,厘清生态环境建设中陆海统筹的关键问题,总结出陆海统筹工作的对策建议,包括构建生态环境陆海统筹管理新模式、蓝色经济与生态文明协同发展新模式、基于绿色发展的弹性海岸新模式、"三个一"智慧海岸带大数据信息系统技术新体系等。这些对策对于我国海岸带城市区域生态环境建设的陆海统筹和海岸带综合管理工作具有借鉴意义。  相似文献   

12.
While planning resource management systems in rural areas, it is important to consider criteria that are specific to the local social conditions. Such criteria might change from one region to another and are hence best identified using a participatory approach. In this work, we propose a participatory framework to identify such criteria and derive their weights. These identified criteria and their weights are used as parameters to develop a quantitative model for evaluating efficiency of each system. Such a model can serve as a support tool for stakeholders to simulate and analyze “what‐if” scenarios, evaluate alternatives, and select one which best satisfies their requirements. We use existing systems to test the model by comparing efficiencies evaluated by the model to efficiencies perceived by the stakeholders. The model is calibrated by repeating the process until statistically significant correlation is achieved between evaluated and perceived efficiencies. The novelty of the proposed framework lies in treating efficiencies perceived by the stakeholders as the ground truth since they know these systems well and are their ultimate users. The framework is successfully demonstrated using case study of rainwater harvesting (RWH) systems in an Indian village. The resulting calibrated model can be used to plan new RWH systems in this region and similar regions elsewhere. The framework can be used to plan other resource management systems in various regions.  相似文献   

13.
The paper gives an account of the development and implementation of a stakeholder management framework at Ream National Park, Cambodia. Firstly, the concept of stakeholder is reviewed in management and in conservation literatures. Secondly, the context in which the stakeholder framework was implemented is described. Thirdly, a five-step methodological framework is suggested: (1) stakeholder analysis, (2) stakeholder mapping, (3) development of generic strategies and workplan, (4) presentation of the workplan to stakeholders, and (5) implementation of the workplan. This framework classifies stakeholders according to their level of influence on the project and their potential for the conservation of natural resources. In a situation characterized by conflicting claims on natural resources, park authorities were able to successfully develop specific strategies for the management of stakeholders. The conclusion discusses the implications of the Ream experience and the generalization of the framework to other protected areas.  相似文献   

14.
The assessment of management effectiveness in protected areas, i.e., the evaluation of whether management strategies are actually helping to achieve stated goals, is becoming a priority. In any such evaluation, accurate information concerning the dynamics of the managed system is required—information that is gathered through monitoring. Few protected areas, however, have well-developed monitoring plans, and reserve managers are faced with a shortage of protocols for their design. This paper proposes a methodology, applicable to a wide range of situations, for designing such plans. The process begins with the precise definition of the aims of the monitoring plan, followed by the identification of key ecological processes and management objectives for the area, and finally the selection of a reduced set of indicators. These indicators are represented at three levels of growing complexity, allowing the plan to be followed in a modular fashion and in agreement with available resources.  相似文献   

15.
Strategic environmental assessment (SEA) is gaining widespread recognition as a tool for integrating environmental considerations in policy, plan, and program development and decision-making. Notwithstanding the potential of SEA to improve higher-order decision processes, there has been very little attention given to integrating SEA with industry planning practices. As a result, the benefits of SEA have yet to be fully realized among industrial proponents. That said, SEA practice is ongoing, albeit informally and often under a different label, and is proving to be a valuable tool for industry planning and decision-making. Based on a case study of the Pasquai-Porcupine forest management plan in Saskatchewan, Canada, this paper illustrates how an integrated approach to SEA can contribute to industry environmental decision-making and can enhance the quality and deliverability of industry plans.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号