共查询到17条相似文献,搜索用时 31 毫秒
1.
2.
3.
4.
5.
王新同 《资源节约和综合利用》2011,(5):40-41
在人们的印象中,包工头往往是指那些和沙子、水泥打交道的工程承包商。但如今,随着互联网的蓬勃发展,一种名叫“网络包工头”的新职业悄然而生。 相似文献
6.
《资源节约和综合利用》2011,(8):56-56
埃文斯将自己的家作为网速提高的一个例子。自1990年以来,互联网性能提高了17万倍,1990年时只有一个telnet连接。现在,埃文斯拥有38个始终在线的连接和超过50M的带宽,足以同时进行远程呈现、在线观看影片和玩游戏。他认为未来10年的家庭网络速度将提高300万倍。 相似文献
7.
顾波 《安全.健康和环境》2011,11(3):38-39
13年中,齐鲁石化橡胶厂厚厚的动火证上都签有王春芬的名字,这三个字对负责掌管安全的她来说,是至高的荣誉和信任,也是她对于生命、对于爱的一种诠释。"爱"要勇敢说出口"我对他大声喊,你现在必须停下来,如果再这样干下去,我是不会走的!只见他从5米高的脚手架上哧溜就下来了,一下子站在我的面前,比我足足高了快两头,满脸怒火的瞪着我,我们就那样大概僵持了有5秒钟……"王春芬说。 相似文献
8.
9.
11.
12.
13.
14.
《Journal of Cleaner Production》2007,15(2):203-217
Sustainable development is literally fuelled by the energy sector. In Uganda, the electricity sector has experienced dramatic market liberation in recent years. This reform was centred around the unbundling of the main government utility, Uganda Electricity Board (UEB), a monopoly divided into three companies created to introduce competition into the market. Market reform has also led to the creation of a regulatory body and a rural electrification fund with the aim of subsidising rural electricity investments. Through a multi-sectoral programme financed by the World Bank and the Global Environment Facility (GEF), the Ministry of Energy is developing a Rural Electrification Master Plan to provide a more systematic tool for rural electricity investments. Unlike previous approaches, this plan is demand driven. This paper discusses the use of Geographic Information Systems (GIS) in the planning process for rural electrification. The aim is to identify patterns of demand and priority areas for investment. By creating a demand-side scenario, electricity can then be supplied to targeted areas. A cross-sectoral view is taken to examine the energy demand patterns using physical data and available country statistics, incorporated into a GIS master database. Based on geo-referenced data of population and existing infrastructure, the initial priority demand-side sectors targeted are education and health. An energy benefit point system is then applied to each sector based on local conditions and needs assessments. Their aggregated points then provide an indicator of energy demand distribution for electricity planning at district level. As a result of this preliminary work, specific areas could then be targeted for investment and optimised supply systems could be designed, which include off-grid renewable energy plants such as small-scale hydropower schemes. 相似文献
15.
郑义 《环境与可持续发展》2008,(5)
日常生活中使用的卫生间低水箱普遍用水量多,一次使用造成浪费水的现象非常严重.本文着重对直冲式低水箱进行改造,建立水箱排水的数学模型,对影响使用效果的各变量逐一进行分析.最终找出一组模型的最佳设计参数,在满足使用功能的要求下,减少用水量节约了用水. 相似文献
16.
17.
解决节能问题又添新途径.一种被称为"能效电厂"的节电概念已在国内进行了实质性的推广.2005年,能效电厂项目的倡导者亚洲开发银行分别为江苏、上海设计了能效电厂方案.其中,江苏项目已进入预可行的阶段. 相似文献