首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 78 毫秒
1.
Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the definition of shift schedules for both personnel and vehicles. This activity has a great incidence on the tactical and operational cost for companies. In this paper, we propose an integer programming model to find an optimal solution to the integrated problem. The aim is to determine optimal schedules at minimum cost. Moreover, we design a fast and effective heuristic to face large-size problems. Both approaches are tested on data from a real-world case in Southern Italy and compared to the current practice utilized by the company managing the service, showing that simultaneously solving these problems can lead to significant monetary savings.  相似文献   

2.
The location of multi-compartment sorted waste containers for recycling purposes in cities is an important problem in the context of urban waste management. The costs associated with those facilities and the impacts placed on populations are important concerns. This paper introduces a mixed-integer, multiobjective programming approach to identify the locations and capacities of such facilities. The approach incorporates an optimization model in a Geographical Information System (GIS)-based interactive decision support system that includes four objectives. The first objective minimizes the total investment cost; the second one minimizes the average distance from dwellings to the respective multi-compartment container; the last two objectives address the “pull” and “push” characteristics of the decision problem, one by minimizing the number of individuals too close to any container, and the other by minimizing the number of dwellings too far from the respective multi-compartment container. The model determines the number of facilities to be opened, the respective container capacities, their locations, their respective shares of the total waste of each type to be collected, and the dwellings assigned to each facility. The approach proposed was tested with a case study for the historical center of Coimbra city, Portugal, where a large urban renovation project, addressing about 800 buildings, is being undertaken. This paper demonstrates that the models and techniques incorporated in the interactive decision support system (IDSS) can be used to assist a decision maker (DM) in analyzing this complex problem in a realistically sized urban application. Ten solutions consisting of different combinations of underground containers for the disposal of four types of sorted waste in 12 candidate sites, were generated. These solutions and tradeoffs among the objectives are presented to the DM via tables, graphs, color-coded maps and other graphics. The DM can then use this information to “guide” the IDSS in identifying additional solutions of potential interest. Nevertheless, this research showed that a particular solution with a better objective balance can be identified. The actual sequence of additional solutions generated will depend upon the objectives and preferences of the DM in a specific application.  相似文献   

3.
This study aimed to address the issues involved in the planning and design of a computer waste management system in an integrated manner. A decision-support tool is presented for selecting an optimum configuration of computer waste management facilities (segregation, storage, treatment/processing, reuse/recycle and disposal) and allocation of waste to these facilities. The model is based on an integer linear programming method with the objectives of minimizing environmental risk as well as cost. The issue of uncertainty in the estimated waste quantities from multiple sources is addressed using the Monte Carlo simulation technique. An illustrated example of computer waste management in Delhi, India is presented to demonstrate the usefulness of the proposed model and to study tradeoffs between cost and risk. The results of the example problem show that it is possible to reduce the environmental risk significantly by a marginal increase in the available cost. The proposed model can serve as a powerful tool to address the environmental problems associated with exponentially growing quantities of computer waste which are presently being managed using rudimentary methods of reuse, recovery and disposal by various small-scale vendors.  相似文献   

4.
To tackle nonlinear economies-of-scale (EOS) effects in interval-parameter constraints for a representative waste management problem, an inexact piecewise-linearization-based fuzzy flexible programming (IPFP) model is developed. In IPFP, interval parameters for waste amounts and transportation/operation costs can be quantified; aspiration levels for net system costs, as well as tolerance intervals for both capacities of waste treatment facilities and waste generation rates can be reflected; and the nonlinear EOS effects transformed from objective function to constraints can be approximated. An interactive algorithm is proposed for solving the IPFP model, which in nature is an interval-parameter mixed-integer quadratically constrained programming model. To demonstrate the IPFP's advantages, two alternative models are developed to compare their performances. One is a conventional linear-regression-based inexact fuzzy programming model (IPFP2) and the other is an IPFP model with all right-hand-sides of fussy constraints being the corresponding interval numbers (IPFP3). The comparison results between IPFP and IPFP2 indicate that the optimized waste amounts would have the similar patterns in both models. However, when dealing with EOS effects in constraints, the IPFP2 may underestimate the net system costs while the IPFP can estimate the costs more accurately. The comparison results between IPFP and IPFP3 indicate that their solutions would be significantly different. The decreased system uncertainties in IPFP's solutions demonstrate its effectiveness for providing more satisfactory interval solutions than IPFP3. Following its first application to waste management, the IPFP can be potentially applied to other environmental problems under multiple complexities.  相似文献   

5.
Recent research focusing on environmental conflicts has revealed that interested parties may utilize different perspective and attempt to solve different problems. These findings suggest that in order to find mutually acceptable solutions, participants should understand the other parties' problem representations which are often subject to significant changes during the decision making and negotiation process. Based on recent findings in behavioral research, a model is suggested which describes the process of construction, application, and change of problem representations. The attempts to site a low- and intermediate-level radioactive waste disposal facility in Hungary is presented as an illustrative example. The case complies with the suggested process model confirming that (a) in public debates problem representations are actively constructed and changing over time, (b) interested parties are stimulated to stabilize their views and form cognitive panels, (c) external factors or internal demands can alter some elements of panels, and (d) in case of the lack of specific knowledge communication will play a major role in building problem representations.  相似文献   

6.
The collection, transport and disposal of solid waste, which is a highly visible and important municipal service, involves a large expenditure but receives, scant attention. This problem is even more crucial for large cities in developing countries due to the hot weather. A constructive heuristic which takes into account the environmental aspect as well as the cost is proposed to solve the routing aspect of garbage collection. This is based on a look-ahead strategy which is enhanced by two additional mechanisms. Interesting results were obtained when tested on instances with and without the presence of the effect of the environment.  相似文献   

7.
The main aim of this study is to criticize the process of selecting the most appropriate site for the disposal of municipal solid wastes which is one of the problematic issues of waste management operations. These kinds of problems are pathological symptoms of existing problematical human–nature relationship which is related to the syndrome called ecological crisis. In this regard, solving the site selection problem, which is just a small part of a larger entity, for the good of ecological rationality and social justice is only possible by founding a new and extensive type of human–nature relationship. In this study, as a problematic point regarding the discussions on ecological problems, the existing structure of the applications using multi-criteria decision analysis in the process of site selection with three main criteria is criticized. Based on this critique, fundamental problematic points (to which applications are insufficient to find solutions) will be defined. Later, some modifications will be suggested in order to provide solutions to these problematical points. Finally, the criticism addressed to the structure of the method with three main criteria and the feasibility of the new method with four main criteria is subjected to an evaluation process. As a result, it is emphasized that the new structure with four main criteria may be effective in solution of the fundamental problematic points.  相似文献   

8.
大豆种皮过氧化物酶在酚类废水处理中的应用   总被引:1,自引:0,他引:1  
江均平  王巧环 《化工环保》2006,26(5):382-385
介绍了大豆种皮过氧化物酶(SBP)的特性、除酚原理及用SBP处理酚类废水的研究进展,对SBP除酚的主要技术参数进行了详细阐述,并对现存问题和解决途径进行了探讨。SBP的性质优异、酶源丰富、价格低廉。直接用大豆种皮处理废水的经济指标已基本达到实用水平,但导致废水中可溶性固形物的含量增加,解决的途径是选育酶活性高、稳定性好的大豆品种。  相似文献   

9.
无费低费方案的实施是清洁生产成功的关键   总被引:5,自引:0,他引:5  
叙述了我国目前清洁生产审核试点阶段出现的问题,认为根源在于未能有效地执行清洁生产审核中提出的无费低费方案,并提出了解决这些问题的方法。  相似文献   

10.
It is of huge importance for sustainability to find a pragmatic solution for recycling of a variety of wastes emitted in small mass such as the case of wallpaper replacements. A combination of two-step sorting scheme and transportation of the wastes in collaboration with the wholesalers was proposed to enhance the efficiency of recycling. The two-step sorting consists of the first sorting at the wallpaper hanging sites to separate and group wastes in a way to avoid heavy additional burden on the hanging job. Secondary sorting is conducted at a Sorting Center to re-group wastes to send to an intermediate processing company for recycling. To minimize the costs for transportation, the grouped wastes emitted at the hanging sites are brought back by the hangers and kept temporally and then moved to the wholesaler(s) on the way to receive new materials. When the wastes at the wholesaler(s) become sufficiently large for economic transportation, a truck is arranged to collect the wastes to transport them to the Sorting Center. A feasibility study to test the practicality of the method confirmed that it could be operable and the cost would be comparable or lower than that currently incurred for disposal of the wastes.  相似文献   

11.
Organic waste and municipal solid waste usually contain considerable amounts of different nitrogen compounds, which may inhibit anaerobic degradation processes and cause problems in the downstream and peripheral devices. This refers particularly to the different process stages of anaerobic digestion, to wastewater treatment, and to exhaust air treatment. Neither the knowledge about nitrogen problems nor the technologies for elimination of nitrogen compounds from the wastewater or the exhaust air of anaerobic digestion can be regarded as state-of-the-art. Most of the technologies in question have already been applied in other areas, but are barely tested for application in anaerobic digestion plants. The few performance data and experiences at hand were mainly derived from pilot and demonstration facilities. In this paper, the problem of nitrogen will be discussed in detail according to the separate problem fields based on the authors' experience, as well as on the basis of a review of the relevant literature. Furthermore, possible solutions will be proposed and the need for further research and development will be formulated.  相似文献   

12.
Pneumatic waste collection systems are becoming increasingly popular in new urban residential areas, and an attractive alternative to conventional vehicle-operated municipal solid waste (MSW) collection also in ready-built urban areas. How well pneumatic systems perform in ready-built areas is, however, an unexplored topic. In this paper, we analyze how a hypothetical stationary pneumatic waste collection system compares economically to a traditional vehicle-operated door-to-door collection system in an existing, densely populated urban area. Both pneumatic and door-to-door collection systems face disadvantages in such areas. While buildings and fixed city infrastructure increase the installation costs of a pneumatic system in existing residential areas, the limited space for waste transportation vehicles and containers cause problems for vehicle-operated waste collection systems. The method used for analyzing the cost effects of the compared waste collection systems in our case study takes into account also monetized environmental effects of both waste collection systems. As a result, we find that the door-to-door collection system is economically almost six times more superior. The dominant cost factor in the analysis is the large investment cost of the pneumatic system. The economic value of land is an important variable, as it is able to reverse the results, if the value of land saved with a pneumatic system is sufficiently high.  相似文献   

13.
The previous inexact mixed-integer linear programming (IMILP) method can only tackle problems with coefficients of the objective function and constraints being crisp intervals, while the existing inexact mixed-integer semi-infinite programming (IMISIP) method can only deal with single-objective programming problems as it merely allows the number of constraints to be infinite. This study proposes, an inexact mixed-integer bi-infinite programming (IMIBIP) method by incorporating the concept of functional intervals into the programming framework. Different from the existing methods, the IMIBIP can tackle the inexact programming problems that contain both infinite objectives and constraints. The developed method is applied to capacity planning of waste management systems under a variety of uncertainties. Four scenarios are considered for comparing the solutions of IMIBIP with those of IMILP. The results indicate that reasonable solutions can be generated by the IMIBIP method. Compared with IMILP, the system cost from IMIBIP would be relatively high since the fluctuating market factors are considered; however, the IMILP solutions are associated with a raised system reliability level and a reduced constraint violation risk level.  相似文献   

14.
Economic potential of recycling business in Lahore, Pakistan   总被引:1,自引:0,他引:1  
The state of household waste recycling in Lahore city, Pakistan with a population of 7.2 million was analyzed. Data on solid waste recycling were gathered from residents of low-, middle- and high-income groups, as well as from scavengers and junkshops. The recycling activities in Lahore exert a significant impact on resource conservation, creation of jobs, provision of economic opportunity and reduction in the magnitude of waste disposal problems. A cost analysis is presented to show the income that can be generated through a well-planned recycling program. It is shown that 21.2% of all recyclable waste in Lahore is recycled, and it generates an amount of Rs. 271 million (US dollars 4.5 million) per year through the informal sector. However, if the recycling practice is owned by the formal sector, it can save an amount of Rs. 65 million by reducing the collection cost. If recycling is adopted as an industry, it can generate revenues of Rs. 530 million (US dollars 8.8 million) per year and can also save enormous amount of energy, as well as the natural resources.  相似文献   

15.
In this study a multi-objective mathematical programming model is developed for taking into account GHG emissions for Municipal Solid Waste (MSW) management. Mathematical programming models are often used for structure, design and operational optimization of various systems (energy, supply chain, processes, etc.). The last twenty years they are used all the more often in Municipal Solid Waste (MSW) management in order to provide optimal solutions with the cost objective being the usual driver of the optimization. In our work we consider the GHG emissions as an additional criterion, aiming at a multi-objective approach. The Pareto front (Cost vs. GHG emissions) of the system is generated using an appropriate multi-objective method. This information is essential to the decision maker because he can explore the trade-offs in the Pareto curve and select his most preferred among the Pareto optimal solutions. In the present work a detailed multi-objective, multi-period mathematical programming model is developed in order to describe the waste management problem. Apart from the bi-objective approach, the major innovations of the model are (1) the detailed modeling considering 34 materials and 42 technologies, (2) the detailed calculation of the energy content of the various streams based on the detailed material balances, and (3) the incorporation of the IPCC guidelines for the CH4 generated in the landfills (first order decay model). The equations of the model are described in full detail. Finally, the whole approach is illustrated with a case study referring to the application of the model in a Greek region.  相似文献   

16.
浅谈FCL氨法脱硫技术在小型燃煤锅炉烟气脱硫中的应用   总被引:4,自引:3,他引:1  
以FCL氨法脱硫技术在太仓保利协鑫热电有限公司小型燃煤锅炉烟气脱硫中的应用为例,阐述了氨法脱硫的工艺原理、流程、工程实践中出现的问题及解决方案,并对其进行了技术经济性分析。  相似文献   

17.
A stochastic linear fractional programming (SLFP) approach is developed for supporting sustainable municipal solid waste management under uncertainty. The SLFP method can solve ratio optimization problems associated with random information, where chance-constrained programming is integrated into a linear fractional programming framework. It has advantages in: (1) comparing objectives of two aspects, (2) reflecting system efficiency, (3) dealing with uncertainty expressed as probability distributions, and (4) providing optimal-ratio solutions under different system-reliability conditions. The method is applied to a case study of waste flow allocation within a municipal solid waste (MSW) management system. The obtained solutions are useful for identifying sustainable MSW management schemes with maximized system efficiency under various constraint-violation risks. The results indicate that SLFP can support in-depth analysis of the interrelationships among system efficiency, system cost and system-failure risk.  相似文献   

18.
在线监测装置是运行人员的"眼睛",能否正常运行,对整套脱硫系统的可靠、经济、甚至安全运行均有十分重要的影响。脱硫系统所属的关键在线监测装置包括压降测量装置、吸收塔浆液密度和液位测量装置、吸收塔浆液pH值测量装置,堵塞是三者所存在的共性问题,后两者还存在其他方面的常见问题,分析了某厂湿法脱硫吸收塔在线监测系统产生上述常见问题的原因,提出了相应的解决办法。  相似文献   

19.
20.
A stochastic robust interval linear programming model (IPRO) was developed for supporting municipal solid waste management under uncertainty. The model improves upon the existing stochastic robust optimization (SRO) and interval linear programming (ILP) methods by allowing evaluations of trade-offs among expected costs, cost variability, and risk of violating relax constraints simultaneously, as well as reflections of complex uncertainties through both interval and stochastic theories. A long-term waste management problem was used to demonstrate the applicability of IPRO model. The results indicated that IPRO normally led to interval solutions, where waste-management alternatives could be generated by adjusting the decision-variable values within their intervals. The model could also help waste managers to identify desired policies that under various environmental, economic, system-feasibility and system-reliability constraints.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号