首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 46 毫秒
1.
/ Environmental impact assessment (EIA) has been identified as an important instrument for facilitating sustainability. However, to do so requires the integration of sustainability into EIA theory and practice. The sustainability concept is a valid and important environmental management perspective. However, many issues and obstacles need to be addressed further if the concept is to be translated into practical strategies. Sustainability can potentially infuse EIA with a clearer sense of direction, an ethical foundation, a mechanism for establishing priorities and assessing choices, and a means of linking EIA to other environmental management instruments. Conceptually, EIA and sustainability can be integrated, but frameworks should be refined, adpated to context, and linked to related initiatives. Sustainability should be explicitly incorporated into EIA legislation, guidelines, and institutional arrangements. An experimental approach to testing, assessing, and sharing experiences is suggested.A framework is first presented that defines and characterizes the sustainability concept. A further framework is then described for integrating sustainability into EIA at the conceptual level. The integration of sustainability and EIA at the regulatory level is next addressed through an overview of sustainability initiatives in EIA requirements in Canada. The Canadian examples include many promising initiatives but these and other experiences will need to be monitored, shared, and integrated into comprehensive environmental management strategies. Finally, means of incorporating sustainability into each activity in the EIA planning process are identified.KEY WORDS: Sustainability; Environmental impact assessment  相似文献   

2.
Impact scoping is the process of identifying important issues of a proposal and focusing the environmental impact assessment (EIA) on the high-priority issues. Although impact scoping in one form or another has been inherent to EIA for some time, documentation of its development and discussion of refinements to impact scoping processes have not been forthcoming. This article traces the development of impact scoping through time and highlights the need for such processes in EIA. A focused environmental assessment (FEA) approach to impact scoping that is suitable for implementation in an EIA is presented here and advantages of its use are delineated. FEA is a three-staged process that encourages impact scoping through progressive steps including impact identification, assessment and management planning. FEA combines a suite of EIA methods including: issues matrices, impact hypotheses, valued ecosystem components, and stakeholder participation sessions to effectively integrate impact scoping with EIA.  相似文献   

3.
Experiences with environmental impact assessment (EIA) in a number of countries are discussed in the light of both explicit and implicit goals and objectives. Adequate environmental information is not always available to decision makers because of failure to apply EIA to all relevant decisions, the continuing inadequacies of prediction and evaluation techniques, the failure to consider alternatives adequately, and the bias of some EISs. EIA frequently results in changes to proposals and may result in stricter environmental management conditions in some cases, but some people regard it as a failure because it has not stopped development. Generally, EIA leads to better integration of environmental factors into project planning. Open procedures and freedom of information encourage responsiveness to EIA procedures, which can be weakened by discretionary powers and lack of access to the courts by public interest groups. However, legal standing may have side effects that offset its advantages. EIA can encourage cooperation and coordination between agencies but does not ensure them. Similarly, it can have a limited role in coordinating interstate and international policies. In the long term, the success of EIA depends on adequate monitoring, reassessment, and enforcement over the life of the project. EIA has generally opened up new opportunities for public participation, and may help to reduce conflict. EIA procedures need to be integrated with other environmental protection and development control programs, and various means exist for reducing its cost to developers and the public.  相似文献   

4.
US government actions undertaken in Antarctica are subject to the requirements of both the Protocol and the US National Environmental Policy Act (NEPA). There are differences in the scope and intent of the Protocol and NEPA; however, both require environmental impact assessment (EIA) as part of the planning process for proposed actions that have the potential for environmental impacts. In this paper we describe the two instruments and highlight key similarities and differences with particular attention to EIA. Through this comparison of the EIA requirements of NEPA and the Protocol, we show how the requirements of each can be used in concert to provide enhanced environmental protection for the antarctic environment. NEPA applies only to actions of the US government; therefore, because NEPA includes certain desirable attributes that have been refined and clarified through numerous court cases, and because the Protocol is just entering implementation internationally, some recommendations are made for strengthening the procedural requirements of the Protocol for activities undertaken by all Parties in Antarctica. The Protocol gives clear and strong guidance for protection of specific, valued antarctic environmental resources including intrinsic wilderness and aesthetic values, and the value of Antarctica as an area for scientific research. That guidance requires a higher standard of environmental protection for Antarctica than is required in other parts of the world. This paper shows that taken together NEPA and the Protocol call for closer examination of proposed actions and a more rigorous consideration of environmental impacts than either would alone. Three areas are identified where the EIA provisions of the Protocol could be strengthened to improve its effectiveness. First, the thresholds defined by the Protocol need to be clarified. Specifically, the meanings of the terms “minor” and “transitory” are not clear in the context of the Protocol. The use of “or” in the phrase “minor or transitory” further confuses the meaning. Second, cumulative impact assessment is called for by the Protocol but is not defined. A clear definition could reduce the chance that cumulative impacts would be given inadequate consideration. Finally, the public has limited opportunities to comment on or influence the preparation of initial or comprehensive environmental evaluations. Experience has shown that public input to environmental documents has a considerable influence on agency decision making and the quality of EIA that agencies perform.  相似文献   

5.
Conditions in Guatemala's Rio Dulce National Park (RDNP) present an immediate decision-making challenge concerning the reversal of current destructive environmental trends, and in establishing policies for restoration, protection, and sustainable use. This article summarises results of environmental assessment activities undertaken at three levels: an environmental impact assessment (EIA) of a proposed industrial forestry activity, an environmental assessment of management options for the Rio Dulce National Park, and water management planning for the Rio Dulce/Lago Izabal watershed. A key result of the EIA was to prohibit construction of a barge terminal within the boundaries of the park because it could set a precedent for future development. Management options for the park focused on establishing land-use controls, dealing with river transport more effectively, and identifying funding mechanisms to implement solutions. At the watershed scale, a strategic approach was recommended to identify priority issues for initiating change toward sustainability in the region.  相似文献   

6.
Large-scale public infrastructure projects have featured in China’s modernization course since the early 1980s. During the early stages of China’s rapid economic development, public attention focused on the economic and social impact of high-profile construction projects. In recent years, however, we have seen a shift in public concern toward the environmental and ecological effects of such projects, and today governments are required to provide valid environmental impact assessments prior to allowing large-scale construction. The official requirement for the monitoring of environmental conditions has led to an increased number of debates in recent years regarding the effectiveness of Environmental Impact Assessments (EIAs) and Governmental Environmental Audits (GEAs) as environmental safeguards in instances of large-scale construction. Although EIA and GEA are conducted by different institutions and have different goals and enforcement potential, these two practices can be closely related in terms of methodology. This article cites the construction of the Qinghai–Tibet Railway as an instance in which EIA and GEA offer complementary approaches to environmental impact management. This study concludes that the GEA approach can serve as an effective follow-up to the EIA and establishes that the EIA lays a base for conducting future GEAs. The relationship that emerges through a study of the Railway’s construction calls for more deliberate institutional arrangements and cooperation if the two practices are to be used in concert to optimal effect.  相似文献   

7.
文章分析了石油化工建设项目环境影响评价文件批准后,项目发生部分变更的主要类型,探讨了项目变更环境影响评价重点工作内容。结合实例分析,提出了项目变更环境影响评价的管理要求,对此项工作有一定的指导作用。  相似文献   

8.
为顺利推进省以下环保机构监测监察执法垂直管理制度改革工作进程,本文围绕垂直管理制度改革的方向与主线,对涉及垂直管理改革的环保责任清单、环境监察、环境监测、环境执法、市(地)级派出县级环保分局和省级对市(地)级环保局的双重管理等六个方面的主要改革任务,从改革方案的基本考虑、基本方向和具体实施路径进行系统解读,为下一步试点省份实施垂直管理制度改革提供可操作性的政策指引。  相似文献   

9.
Intensified surface mining, power generation, and smelting operations in the Hunter River lowlands, NSW, Australia have posed numerous new environmental management problems. Legislative controls over water, soils, and land use management have been clearly insufficient and remain so. The complex range of environmental changes is challenging government agencies as well as coal developers. While water demands are increasing in the region the proportionally greatest competitors are power generation and irrigation. Comprehensive regional water quality assessment is inadequate and divided between a number of agencies with fragmentary interests. Coal development inquiries signal further controversy over appropriate management solutions and are an ongoing phenomenon in the region. The early 1980s resource boom has been followed by lower rates of economic growth, which have resulted in disparate agency responses to major ongoing environmental questions. While issue attention cycles are often remarkably short in environmental management, matters of water, land, and air quality require intensive and ongoing monitoring and policy development.  相似文献   

10.
This article reviews the application of environmental impact assessment (EIA) procedures and practices to three watershed modification projects situaled in western Canada. These ventures were justified for accelerating regional economic development, and cover the period during which public concerns for protecting the environment rapidly made their way into the national political agenda. An historical account and analysis of the situation, therefore, seems desirable in order to understand the development of EIA processes, practices, and methodologies since the start of construction of the first project in 1961. This study concludes that there has been good progress in predicting and evaluating environmental and related social impacts of watershed modification proposals. However, a number of obstacles need to be overcome before EIA can firmly establish itself as an effective planning tool. These difficulties include jurisdictional confusions and conflicts, division of authority and responsibility in designing and implementing appropriate mitigative and monitoring measures, lack of tested EIA methodologies, and limited availability of qualified human resources. A number of conclusions and suggestions are offered so that future watershed modification proposals may be planned and implemented in a more environmentally sustainable fashion. These include: (1) EIA processes must be completed before irrevocable decisions are made. (2) Any major intrusion into a watershed is likely to impact on some major components of the ecosystem(s). (3) Mitigation costs must form part of the benefit-cost analysis of any project proposal. (4) Interjurisdictional cooperation is imperative where watersheds cross political boundaries. (5) The EIA process is a public process, hence public concerns must be dealt with fairly. (6) The role of science in the EIA process must be at arms length from project proponents and regulators, and allowed to function in the interest of the protection of the environment and public health and safety. The views expressed here are the authors’ own and do not necessarily reflect those of FEARO and/or other government agencies and officials involved in the review of these projects.  相似文献   

11.
A large body of literature addresses the role of science in environmental impact assessment (EIA) but less attention has been given to the views of practitioners themselves. In this research a survey of 31 EIA practitioners in Western Australia was undertaken to determine their perceptions of the quality and importance of science in EIA. The survey results are compared with previous theoretical, empirical, and survey studies of the role of science in EIA. Interview questions addressed the role of science in impact prediction, monitoring activities, mitigation and management, and EIA decision-making. It was clear from the interviews that many practitioners are satisfied with the quality of science currently used in EIA, but do not believe that it is given sufficient importance in the process. The quality and importance of science in the predecision stages of EIA was rated higher than in the postdecision stages. While science was perceived to provide the basis for baseline data collection, impact prediction, and mitigation design, it was seen to be less important during decision-making and ongoing project management. Science was seen to be just one input to decision-makers along with other factors such as sociopolitical and economic considerations. While time and budget constraints were seen to limit the scientific integrity of EIA activities, pressure from the public and regulatory authorities increased it. Improving the scientific component of EIA will require consideration of all these factors, not just the technical issues.  相似文献   

12.
Since environmental impact assessment (EIA) is concerned primarily withsignificant environmental impacts, the concept of impact significance deserves to be defined and applied rigorously. In this article use of the term over the past 15 years in EIA documentation is reviewed. Some recent attempts at elucidating the concept are summarized. Four perspectives on impact significance that emerged from a series of workshops on the ecological basis for EIA are presented. These perspectives include (a) statistical (related to problems of isolating project-induced changes from natural variation), (b) ecological (related to the importance of project-induced changes from a purely ecological perspective), (c) social (related to the acceptability of project-induced changes in important environmental attributes), and (d) project (related to whether project-induced changes will indeed influence project decision making). The following synthesis is proposed: Any exercise in judging the significance of an environmental impact should thoroughly consider (a) the importance of the environmental attribute in question to project decision makers, (2) the distribution of change in time and space, (c) the magnitude of change, and (d) the reliability with which change has been predicted or measured. The implications of considering these factors are discussed.  相似文献   

13.
Cross-city analysis in environmental regulation within non-democratic political systems is a neglected area. Taking policy convergence and styles of regulation as the focus, this paper has taken an initial step to compare the environmental impact assessment (EIA) regulation in Hong Kong and Shanghai. In this comparative exercise, it is identified that policy convergence occurs more explicitly in policy ideology and policy consequences, whereas divergence takes place in policy content, regulatory process and public consultation. Convergence, however, is only superficial whereas divergence is substantial. Indeed EIA systems of these two jurisdictions have displayed contrasting styles of regulation. The formal EIA system in Shanghai is dominated by the environmental agency, which regulates informal politics in the EIA process within a legal format. The informal EIA system in Hong Kong is co-ordinated by the environmental agency, which seeks active co-operation with the clients in a consultative EIA process in an informal and discretionary manner. What makes the Hong Kong system superior to the Shanghai system is the existence of institutional channels for public consultation. Within a non-democratic political setting, the EIA process in Hong Kong is more transparent and the EIA system is more accountable to the public, whereas the EIA process in Shanghai is lacking in transparency and the EIA system is under tight bureaucratic control.  相似文献   

14.
环境影响评价制度和社会稳定风险评估制度作为预防和控制环境影响、创新社会风险管理的重要制度,实施以来发挥了重要作用,但也出现了工作边界和内容范围交叉的问题。尤其是近年来,环境污染焦虑引发社会风险事件的建设项目不断增多,导致两者的"天然联系"愈发紧密,工作存在模糊地带的问题愈发凸显,致使建设项目行政审批繁复、执行力差。在梳理环评、稳评的发展历程和存在问题的基础上,深入分析了环评和稳评的法律地位、适用范围、评价目标、评价内容、实施主体和程序上的异同,剖析了两者在制度设计和内容衔接方面的关系,并从理清工作边界职责、环境社会风险评估结果共享、强化稳评公众参与等方面提出了环评和稳评政策衔接的建议,为政府有效实施建设项目环境、社会监管提供决策参考。  相似文献   

15.
国家加大了对环境影响评价技术服务机构和专业技术人员的考核与监督以及环境评价审批力度,因而有关服务机构和技术人员在日常工作中必须进行关键技术储备和技术培训。文章阐述了当前环境影响评价的目的、主要内容以及进行环境影响评价必须的技术储备重点。  相似文献   

16.
In this paper the existing body of theory is reviewed to highlight the need for further attention to be paid to the EIA/management relationship. In particular it is shown that the majority of the literature to date has concentrated on the influence of EIA leading up to and including the decision to proceed or not with the proposed action. Less attention has been paid to the extension of the influence of EIA beyond this point to inform the process of ongoing environmental management. This relationship is then explored by reference to the Western Australian EIA system. One of the strengths of this system is its focus upon the implementation and management of proposed developments. The outcome of EIA is generally an approval to proceed with the development subject to meeting a suite of environmental design and management objectives.  相似文献   

17.
回顾性环境影响评价程序及内容研究   总被引:5,自引:0,他引:5  
回顾性环境影响评价是环境影响评价的一个分支,是继常规环境影响评价之后,为检验实际环境影响和减缓措施的有效性行为。其工作内容主要包括环境监测、检验与评估、环境管理及其他环境研究。它既是对原环境影响评价过程中所使用的预测模型和结果正确性的验证,又是对原工作内容进行重要的补充和修正,并提出更为合理和实用的环境保护措施及对策  相似文献   

18.
Environmental impact assessment (EIA) procedures have been in existence in the People's Republic of China over the last decade. The impetus for China's introduction of EIA was provided by the Environmental Protection Law of the People's Republic of China, which was adopted by the Fifth National People's Congress in 1979. The EIA process, which is administrative and not statutorily mandated, has been applied primarily to construction projects. Four stages are typically involved in an EIA investigation: design of the investigation, evaluation of background environmental quality, prediction of environmental impacts, and an assessment and analysis of the environmental impacts. A variety of approaches is used for predicting and analyzing environmental impacts, ranging from ad hoc methods to fairly sophisticated mathematical models. The results of the EIA investigation are compiled in an environmental impact statement, which is used as the basis for decision making by personnel in environmental protection departments. The EIA process does not include provisions for citizen notification or involvement. Views differ concerning the effectiveness of the EIA program in protecting China's natural, social, and cultural environments. Some hold that the EIA program has brought about improvement in environmental protection, while critics contend that the program has had little effect in the prevention of pollution. However, most, if not all, observers seem to feel that the program should be continued and improved. A major avenue for improvement is to place the evaluation of a particular project in a regional context. An earlier version of this paper was distributed at a workshop on Environmental Assessment Development Planning held in conjunction with the VII Annual Meeting of the International Association for Impact Assessment, Brisbane, Australia, July 5–8, 1988.  相似文献   

19.
/ The search for sustainable development provides the impetus forexamining the role of indigenous institutions and their ecological knowledgein environmental assessment and local sustainability. This paper attempts totrace the evolution of environmental assessment in Ghana. Focusing on theAshanti Region, the paper further discusses the nature and operations ofindigenous institutions, their ecological knowledge, beliefs, practices, andsocial norms that are relevant to environmental assessment process in thecountry. Some of the challenges that emerge from the discussions arehighlighted. There is a need to establish environmental assessment andcooperative management boards that would include representatives ofindigenous institutions. In addition, the introduction of technicaldictionaries and training manuals based on indigenous ecological knowledgeand their humane environmental practices will further improve theenvironmental assessment process in Ghana.KEY WORDS: Environmental assessment; Indigenous institutions; Indigenousecological knowledge; Sustainable development; Environmental assessmentboards  相似文献   

20.
This article critically reviews environmental assessment (EA) practices in Sri Lanka, with a particular focus on ecology. An overview is provided of the domestic and international influences which have shaped the administrative process which is currently a two-tiered scheme. An Initial Environmental Examination (IEE) provides a preliminary screening tool, prior to the requirement for a full Environmental Impact Assessment (EIA). A comprehensive survey of Sri Lankan national archives showed that 463 EAs were completed in the period 1981–2005, with the bulk of these in the more populated Western and North Western Provinces. Two-thirds were IEE surveys, while the remaining third advanced to full EIA. A representative sample of 130 EAs (both IEEs and full EIAs) spanning a broad range of project types, scales, and environmental settings was selected to evaluate the quality of the ecological investigations within the published environmental impact statements (EISs). These were assigned into five classes of “explanatory power”, on the basis of their scientific content in relation to survey, analysis, and reporting of ecological interests. Within most EISs, the ecological impact assessment (EcIA) was restricted to the lowest two categories of ecological assessment, i.e., tokenistic presentation of reconnaissance-level species lists without further analysis of the development implications for individual organisms or communities. None of the assessments reviewed provided statistically rigorous analysis, which would be required if ecological impact studies are to include quantitative and testable predictions of impact, which could then be followed up by appropriate post-impact monitoring programs. Attention to key local issues such as biodiversity or ecosystem services, which also have strong social dimensions in the developing world, was also notably underrepresented. It was thus concluded that despite the existence of a sound legislative framework in Sri Lanka, the analysis contained within EISs generally fails to convey meaningful information to the relevant stakeholders and decision makers involved in protecting ecological interests and promoting sustainable development. The introduction of strategic environmental assessment (SEA) is considered an important tool to strengthen the institutional capacity of Sri Lankan government to implement current regulations and, in particular, to combat the cumulative effects of incremental development.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号