首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   11篇
  免费   0篇
安全科学   3篇
废物处理   3篇
环保管理   3篇
污染及防治   1篇
评价与监测   1篇
  2023年   1篇
  2022年   1篇
  2015年   1篇
  2012年   3篇
  2011年   1篇
  2010年   2篇
  2008年   1篇
  2007年   1篇
排序方式: 共有11条查询结果,搜索用时 15 毫秒
11.
Most of the proposed methods for coal pillar design determine pillar dimensions using pillar load estimation only through the tributary area theory. Designing pillar based on these methods is not appropriate in room and pillar mines with pillar recovery because retreat mining and gob creation generate abutment loads. Neglecting abutment loads in design stage may lead to pillar failure and destructive effects during retreat mining. Thus proper pillar design has a remarkable effect on mining safety. In this paper, a step-by-step method is presented to design pillars with square shape in room and pillar mines with regard to existing pillars in the active mining zone (AMZ) and estimating abutment loads according to experimental equations. A decrease in pillar failure risk during retreat mining is the most significant benefit of this method. This method has been applied to determine optimum pillar dimensions in the main panel of Tabas Central Mine (TCM), located in the mid-eastern part of Iran. Obtained results show the abutment loads account for 27% of the total loads applied on pillars in AMZ in this panel. Pillar width, based on this method, is also obtained 11.6 m.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号