Now in Russian Federation and other countries large-scale oil terminals (volume of one tank exceeds 100 000 m3, total volume of tanks exceeds 300 000 m3) are designed and constructed. Therefore fire safety of such objects becomes a very important task, solution of which is hardly possible without detail fire risk assessment. This study is aimed to a solution of this problem. Potential, individual and social risks were calculated. The potential risk was defined as a frequency of occurrence of hazardous factors of fires and explosions in a given point of space (the so-called risk contours). The individual risk was defined as a frequency of injuring a given person by hazardous factors of fires and explosions. Time of presence of this person in hazardous zones (near the hazardous installation) is taken into account during calculations of the individual risk. Social risk was defined as a dependence of frequency of injuring a given number of people by hazardous factors of fires and explosions on this number. In practice the social risk is usually determined on injuring not less than 10 people.
The oil terminal under consideration includes the following main parts: crude oil storage consisting of three tanks of volume 100 000 m3 each, input crude oil pipeline of diameter 0.6 m, crude oil pumps, output crude oil pipeline of diameter 0.8 m, auxiliary buildings and facilities. The following main scenarios of tank fires have been considered: rim seal fire, pool fire on a surface of a floating roof, pool fire on a total cross-section surface of the tank, pool fire in a dyke, explosions in closed or semiclosed volumes. Fires and explosions in other parts of the terminal are also taken into account. Effects of escalation of accidents are considered.
Risk contours have been calculated both for the territory of the terminal and for the neighbouring space. The potential risk for the storage zone is near 10−4–10−5 year−1, and at a distance 500 m from the terminal the potential risk values do not exceed 10−6 year−1. The values of the individual risk for various categories of workers are in the range of 10−5–10−6 year−1. Because of low number of the workers on the terminal and large distances to towns and villages the social risk value is negligible. These risk values are consistent with practice of the best oil companies, and fire hazard level of the terminal can be accepted as tolerable. 相似文献
ABSTRACT: Bacterial populations in nontreated and herbicide-treated waters were subjected to three different herbicides. Diuron, dichlobenil, and diquat were added (100 mg/l) to water samples from two fresh water lakes and two herbicide-treated ponds. Total numbers of bacteria were monitored. Bacterial populations in fresh lake water decreased after herbicide additions; however, final populations were significantly greater than the controls. Similar observations were recorded for bacteria in dichlobenil- and diuron-treated waters. Selective enrichment is probably expressed in these experiments. 相似文献
ABSTRACT: Linear programming is the simplest of all the optimization techniques used in regional water quality management studies; but the technique can optimize only one goal. When there are multiple goals with the same or different priorities, goal programming is a useful decisionmaking tool. This paper illustrates the application of goal programming to a regional water quality management problem where the following two goals are considered: (1) minimize the total cost of waste treatment, and (2) maintain the water quality goals (dissolved oxygen) close to the minimum level stated in the stream standards. 相似文献
ABSTRACT: Storm water management is a concept being applied in many urban areas to deal with the increasing problems of storm runoff control and flood damage prevention. This paper introduces the concept and describes the recently completed storm water management program in Columbus, Georgia. Columbus has spent five years and over $200,000 in the development of their problem which includes several basic elements: soils inventory and analysis, hydrologic data collection, sediment and erosion control ordinance, storm water management handbook, urban flood simulation model, interdepartment coordination study, drainage problem categorization study, and a pilot basin study. The results of the pilot basin study are presented including example output from the urban simulation model. The computer output illustrates both the hydrologic-hydraulic and economic capabilities of the model. 相似文献
Because of the nature of watersheds, the hydrologic and erosional impacts of logging and related road-building activities may move offsite, affecting areas downslope and downstream from the operation. The degree to which this occurs depends on the interaction of many variables, including soils, bedrock geology, vegetation, the timing and size of storm events, logging technology, and operator performance. In parts of northwestern California, these variables combine to produce significant water quality degradation, with resulting damage to anadromous fish habitat.Examination of recent aerial photographs, combined with a review of public records, shows that many timber harvest operations were concentrated in a single 83 km2 watershed in the lower Klamath River Basin within the past decade. The resulting soil disturbance in this case seems likely to result in cumulative off-site water quality degradation in the lower portion of the Basin.In California, both state and federal laws require consideration of possible cumulative effects of multiple timber harvest operations. In spite of recent reforms that have given the state a larger role in regulating forest practices on private land, each timber harvest plan is still evaluated in isolation from other plans in the same watershed. A process of collaborative state-private watershed planning with increased input of geologic information offers the best long-term approach to the problem of assessing cumulative effects of multiple timber harvest operations. Such a reform could ultimately emerge from the ongoing water quality planning process under Section 208 of the amended Federal Water Pollution Control Act. 相似文献
This paper reports the findings of a case study of the relative costs of a uniform standards system and an effluent fee system of water quality control. A 30-mile stretch of the Black Warrior River in Alabama is considered. The analysis demonstrates that the dischargers could reduce total pollution abatement costs by 33 percent under the suggested effluent fee system. 相似文献
ABSTRACT: Lake and watershed management strategies and recent environmental legislation dictate that nonpoht nutrient sources associated with storm water runoff must be assessed. Accordingly, a nutrient flu assessment for phosphorus and nitrogen is conducted through an extensive literature review of nutrient export studies. These studies are reevaluated. The nutrient export coefficients are screened according to sampling design criteria and compiled according to land use. The ecological mechanisms within each land use influencing the magnitude of nutrient flux are also discussed 相似文献
ABSTRACT: A simple procedure for estimating pre- and post-development water quality loadings from residential communities is discussed. The procedure deals with: (a) gathering basic water quality loading numbers observed by others at several watersheds with various land uses; (b) obtaining the breakdown of proposed land uses at various phases of the community development; and (c) estimating pre- and post-development water quality loading numbers by taking the weighted average of the basic loading numbers in terms of areal coverages of different land uses at various phases of development. Results of this simplified procedure have been verified indirectly by comparing them with the estimates derived independently through a more fundamental but time-consuming approach. The procedure was used to evaluate the anticipated water quality impact of two future residential communities in South Florida by analyzing four water quality parameters: Suspended Soils (SS), Total Nitrogen (TN), Total Phosphorus (TP), and Biochemical Oxygen Demand (BOD5). Although computation of loading numbers with mixed land uses is not an exact science at the present time, the recommended approach appears to be the best available technique to analyze quantitatively the water quality-quantity-land use interactions. 相似文献