Objective: Although a considerable amount of prior research has investigated the impacts of speed limits on traffic safety and operations, much of this research, and nearly all of the research related to differential speed limits, has been specific to limited access freeways. The unique safety and operational issues on highways without access control create difficulty relating the conclusions from prior freeway-related speed limit research to 2-lane highways, particularly research on differential limits due to passing limitations and subsequent queuing. Therefore, the objective of this study was to assess differences in driver speed selection with respect to the posted speed limit on rural 2-lane highways, with a particular emphasis on the differences between uniform and differential speed limits.
Methods: Data were collected from nearly 59,000 vehicles across 320 sites in Montana and 4 neighboring states. Differences in mean speeds, 85th percentile speeds, and the standard deviation in speeds for free-flowing vehicles were examined across these sites using ordinary least squares regression models.
Results: Ultimately, the results of the analysis show that the mean speed, 85th percentile speed, and variability in travel speeds for free-flowing vehicles on 2-lane highways are generally lower at locations with uniform 65 mph speed limits, compared to locations with differential limits of 70 mph for cars and 60 mph for trucks.
Conclusions: In addition to posted speed limits, several site characteristics were shown to influence speed selection including shoulder widths, frequency of horizontal curves, percentage of the segment that included no passing zones, and hourly volumes. Differences in vehicle speed characteristics were also observed between states, indicating that speed selection may also be influenced by local factors, such as driver population or enforcement. 相似文献
Dynamite or "blast" fishing is one of the most immediate and destructive threats to coral reefs worldwide. However, little is known about the long-term ecosystem effects of such blasts or the dynamics of recovery. Here, we examine coral reef recovery in the simplest case of acute single blasts of known age, as well as recovery from chronic blasting over greater spatial and temporal scales. Rubble resulting from single blasts slowly stabilized, and craters filled in with surrounding coral and new colonies. After five years, coral cover within craters no longer differed significantly from control plots. In contrast, extensively bombed areas showed no significant recovery over the six years of this study, despite adequate supply of coral larvae. After extensive blasting, the resulting coral rubble shifts in ocean currents, forming unstable "killing fields" for new recruits. While recently tested rehabilitation methods might be feasible on a small scale, human intervention is unlikely to be effective on large spatial scales, highlighting the need for effective management to prevent blast fishing in the first place. 相似文献
ABSTRACT: Considerable advancements have been made in the development of analytical solutions for predicting the effects of pumping wells on adjacent streams and rivers. However, these solutions have not been sufficiently evaluated against field data. The objective of this research is to evaluate the predictive performance of recently proposed analytical solutions for unsteady stream depletion using field data collected during a stream/aquifer analysis test at the Tamarack State Wildlife Area in eastern Colorado. Two primary stream/aquifer interactions exist at the Tamarack site: (1) between the South Platte River and the alluvial aquifer and (2) between a backwater stream and the alluvial aquifer. A pumping test is performed next to the backwater stream channel. Drawdown measured in observation wells is matched to predictions by recently proposed analytical solutions to derive estimates of aquifer and streambed parameters. These estimates are compared to documented aquifer properties and field measured streambed conductivity. The analytical solutions are capable of estimating reasonable values of both aquifer and streambed parameters with one solution capable of simultaneously estimating delayed aquifer yield and stream flow recharge. However, for long term water management, it is reasonable to use simplified analytical solutions not concerned with early‐time delayed yield effects. For this site, changes in the water level in the stream during the test and a varying water level profile at the beginning of the pumping test influence the application of the analytical solutions. 相似文献
This study was undertaken to determine the fate of As, Mo, and V (trace elements, TEs) in the sediments of a constructed wetland in use for the remediation of potentially toxic trace element-contaminated agricultural drainwater. After three years of wetland operation, sediment cores were collected to determine changes in TE concentrations as a function of depth and the effects of varying water column depth. All TE concentrations were highest in the top 2 to 4 cm and decreased with depth. Molybdenum accumulated in the wetland sediments, up to levels of 32.5 +/- 4.6, 30.2 +/- 8.9, and 59.3 +/- 26.1 mg kg(-1) in the top 1 cm of sediment at water depths of 15, 30, and 60 cm, respectively. In the top 2 cm of sediment, As accumulated (28.2 +/- 3.0 mg kg(-1)) only at the 60-cm water depth. Below 2 cm, as much as 10 mg kg(-1) of As was lost from the sediment at all water depths. In most cases, V concentrations decreased in the sediment. In this wetland system, the lowest redox potentials were found near the sediment surface and increased with depth. Thus, in general As, Mo, and V concentrations in the sediment were highest under more reducing conditions and lowest under more oxidizing conditions. Most of the accumulated Mo (73%) became water soluble on drying of samples. This has important implications for systems undergoing changes in redox status; for instance, if these wetland sediments are dried, potentially large amounts of Mo may be solubilized. 相似文献