Objective: The Multidimensional Driving Style Inventory (MDSI) has been widely used in assessing the associations between driving styles and traffic violations and accidents in different cultural contexts. Due to the lack of a valid instrument to assess driving style, studies concerning driving style and its influence factors are limited in China. Thus, this study aimed to adapt and validate a Chinese version of the MDSI.
Methods: Seven hundred and sixty drivers aged from 19 to 60 years old were asked to complete the MDSI and a personality scale (trait anger, sensation seeking, altruism, and normlessness). Exploratory factory analysis (EFA) and confirmatory factor analysis (CFA) were used to obtain the factorial structure of the MDSI. The external validity of the MDSI was then evaluated by examining the associations between driving styles and personality traits, demographic variables, and traffic violations and crashes.
Results: EFA revealed a 6-factor structure of the MDSI (i.e., risky, anxious, angry, distress reduction, careful, and dissociative driving styles). CFA confirmed that the model fit of the MDSI was acceptable. The MDSI factors were moderately or weakly correlated with trait anger, sensation seeking, altruism, and normlessness. Significant gender and age differences in driving styles were found. Moreover, drivers who had traffic violations or crashes in the past year scored higher on risky and angry driving styles and lower on careful driving style than those who had not have traffic violations or crashes.
Conclusions: The Chinese version of the MDSI proved to be a reliable, valid, and highly useful instrument. It could be used to assess Chinese drivers who are at risk due to their maladaptive driving styles. 相似文献
Facility Siting is an important phase of project development. A critical stage is plot plan optimisation, where significant potential hazards are eliminated due to equipment spacing. In addition to ensuring appropriate compliance with minimum spacing requirements, occupied building studies to achieve compliance with the requirements of API 752 and API 753 could also be undertaken to optimise safety outcomes. The studies are done in three stages, where the first stage is hazard identification, second stage is consequence assessment and the third stage is risk assessment. Third stage assessments are only carried, if the consequence based siting recommendations are not practical to implement.This paper presents the challenges in estimating risk due to process hazards with a focus on selecting right event likelihood data. A comparison is presented on the variation in predicted risk levels based on equipment failure rates and leak frequencies.Case study of a plot plan optimisation study is undertaken with DNVGL Phast Risk and the variation in risk levels up to two orders of magnitude are recorded. Challenges such as adaption of data for local conditions, consistent definitions of failure, sample size of data, applicability of data play a significant role in identifying and correctly quantifying the risk levels. Such challenges and its impact on risk quantification are presented in this paper as well as its impact on facility siting. 相似文献
Transport projects have numerous consequences for the environment, society and economy, and thus an EU Directive has stated a number of impacts that need to be assessed prior to any major intervention. This paper is set in a Danish context where the EU requirements have been adopted in the Environmental Impact Assessment (EIA) regulation along with national requirements. In recent years, however, the EIAs have been criticised for an inconsistent inclusion of impacts and unclear assessment process. A selection of EIAs is for this reason reviewed and compared to the EU Directive and corresponding works in Sweden and the UK to identify potential opportunities for improvements. From the literature study, an overview table with all potential relevant impacts for transport projects is set up to assist the EIA process. For the sake of simplicity and transparency, the impacts selected from this table should, however, be further reduced in number to ensure that only the most important impacts are included in the process. To further increase simplicity and transparency in the EIA process, a novel framework for assessing different types of impacts is proposed. In this framework, a comprehensive decision support tool involving stakeholders is in focus. The framework is supplemented with a procedure for generating objectives and presenting results in an appropriate way to the many stakeholders involved. The impacts overview table and the assessment techniques are applied to a case study to illustrate the process, and finally, conclusions and perspectives for future work within the field are set out. 相似文献
IntroductionWith the development of industries and increased diversity of their associated hazards, the importance of identifying these hazards and controlling the Occupational Health and Safety (OHS) risks has also dramatically augmented. Currently, there is a serious need for a risk management system to identify and prioritize risks with the aim of providing corrective/preventive measures to minimize the negative consequences of OHS risks. In fact, this system can help the protection of employees’ health and reduction of organizational costs. Method: The present study proposes a hybrid decision-making approach based on the Failure Mode and Effect Analysis (FMEA), Fuzzy Cognitive Map (FCM), and Multi-Objective Optimization on the basis of Ratio Analysis (MOORA) for assessing and prioritizing OHS risks. After identifying the risks and determining the values of the risk assessment criteria via the FMEA technique, the attempt is made to determine the weights of criteria based on their causal relationships through FCM and the hybrid learning algorithm. Then, the risk prioritization is carried out using the MOORA method based on the decision matrix (the output of the FMEA) and the weights of the criteria (the output of the FCM). Results: The results from the implementation of the proposed approach in a manufacturing company reveal that the score at issue can overcome some of the drawbacks of the traditional Risk Priority Number (RPN) in the conventional FMEA, including lack of assignment the different relative importance to the assessment criteria, inability to take into account other important management criteria, lack of consideration of causal relationships among criteria, and high dependence of the prioritization on the experts’ opinions, which finally provides a full and distinct risk prioritization. 相似文献