The aim of this study is to test the applicability of snow surveying in the collection and detailed characterization of vehicle-derived magnetic particles. Road dust extracted from snow, collected near a busy urban highway and a low traffic road in a rural environment (southern Finland), was studied using magnetic, geochemical and micro-morphological analyses. Significant differences in horizontal distribution of mass specific magnetic susceptibility (χ) were noticed for both roads. Multi-domain (MD) magnetite was identified as the primary magnetic mineral. Scanning electron microscope (SEM) analyses of road dust from both roads revealed: (1) angular-shaped particles (diameter ∼1-300 μm) mostly composed of Fe, Cr and Ni, derived from circulation of motor vehicles and (2) iron-rich spherules (d ∼ 2-70 μm). Tungsten-rich particles (d < 2 μm), derived from tyre stud abrasion were also identified. Additionally, a decreasing trend in χ and selected trace elements was observed with increasing distance from the road edge. 相似文献
Objective: In this work, a roundabout and a turbo roundabout model are compared and previous modeling with continuous Petri nets and safety are analyzed through indicators of complexity. Petri nets are a graphic and mathematical representation that allow a faithful modeling of urban systems.
Method: The methodology has been designed for the transformation of a real system to small subgraphs that represent the maneuvers in roundabouts, approximated as roads and lanes of incorporation. Places within the roundabout have been located and defined as continuous places from their influence and visibility toward adjacent conditions. The transitions have been modeled by time and inhibitory arcs, which represent priorities and areas where drivers must pay attention. The created networks represent a faithful model of vehicle flow trajectories in the roundabouts.
Results: The methodology is applied to the same real road intersection. The case study is a recent transformation from roundabout to turbo roundabout. The roundabout network complexity is corroborated by a greater number of entries and exits that lead to each roundabout place (reflected in the maneuvers that can be performed) and a greater number of inhibiting arcs. In most of the turbo roundabout places, the driver’s only option is reduced to occupying next place. The possibility of choosing between several places supposes a greater trajectory intersection and an increased time for decision making. The only situation where the complexity is the same between both systems is when a vehicle accesses the inner lane of the roundabout from the left lane on a single-lane road. The main maneuvers causing accidents have been modeled and their solution in a turbo roundabout is presented.
Conclusions: The reduced complexity of the turbo roundabout is due to the strict limitations in lane changes, turning turbo roundabouts into a safer model: A lower number of possible movements that can be performed by drivers and a smaller number of trajectories with collision risk. Petri nets have proven to be perfectly applicable to the representation of traffic circular systems (such as roundabouts and turbo roundabouts) and to measure the complexity and security of the system. 相似文献
We present a case of recurrent meconium peritonitis detected in the second trimester and treated by intrauterine intervention. Antenatal ultrasound findings included fetal ascites and intra-abdominal calcification. Aspiration of fetal ascites under ultrasound guidance and determination of the bilirubin concentration established the diagnosis of meconium peritonitis. Paracentesis was repeated to remove irritating intestinal contents and to decrease pressure on the fetal thorax. Although the exact cause of the meconium peritonitis remains unknown, the recurrence of the condition suggests a genetic basis. A possibility of cystic fibrosis was not considered because the clinical picture did not suggest it. Intrauterine intervention helped to establish the diagnosis of meconium peritonitis and may have contributed to the good outcome. 相似文献