首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   60篇
  免费   2篇
安全科学   4篇
综合类   56篇
基础理论   1篇
灾害及防治   1篇
  2022年   2篇
  2021年   2篇
  2011年   5篇
  2010年   7篇
  2009年   3篇
  2008年   7篇
  2007年   3篇
  2006年   2篇
  2005年   6篇
  2004年   3篇
  2003年   6篇
  2002年   3篇
  2001年   2篇
  1999年   1篇
  1995年   3篇
  1994年   3篇
  1991年   2篇
  1990年   2篇
排序方式: 共有62条查询结果,搜索用时 328 毫秒
61.
To assess the role of fetal blood sampling and intrauterine transfusion in monochorionic (MC) multiple pregnancy complicated by single intrauterine death (IUD), we reviewed ten cases over a 4-year period in a tertiary referral centre which underwent fetal blood sampling within 24 h of death of its MC co-twin. Intrauterine rescue transfusion was performed in all seven anaemic fetuses (hematocrit; Hct<30%) to raise the fetal Hct to ≥40%. The rationale was to prevent death and/or brain injury. Two fetuses, which were severely acidaemic at blood sampling, died in utero within 24 h of the procedure. In two cases, the surviving twins manifested abnormal sonographic findings of the fetal brain 2–5 weeks later and underwent late termination. In two cases, the pregnancies continued uneventfully until delivery at 35 and 40 weeks' gestation with good neonatal outcome. In one case the co-twin delivered 1 week later at 29 weeks but died within 12 h. Fetuses without anaemia were not transfused and had normal clinical outcomes. We suggest that intrauterine rescue transfusion before the development of severe acidaemia in anaemic surviving MC co-twins may prevent fetal death, but does not necessarily prevent brain injury. Until its role becomes clearer, we recommend that its use be restricted to situations in which the parents and the local jurisdiction allow late termination as an option if brain injury subsequently manifests on ultrasound. Copyright © 2001 John Wiley & Sons, Ltd.  相似文献   
62.
为解决施工过程安全信息的虚实交互难题,降低施工过程安全风险,提出施工过程安全数字孪生模型。建立施工过程安全语义本体,分析施工过程安全关键知识要素;定义施工过程安全数字孪生五维模型,明确模型的构成和功能,基于物联网和有限状态机构建施工过程安全监控方法,并以塔吊顶升活动安全监控为例进行应用。研究结果表明:该模型能够实现塔吊顶升施工过程安全的数字化表达、参数化监测和自动化控制。  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号