首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   185篇
  免费   0篇
安全科学   1篇
环保管理   162篇
综合类   22篇
  2009年   1篇
  1994年   1篇
  1984年   33篇
  1983年   18篇
  1982年   23篇
  1980年   2篇
  1972年   50篇
  1971年   56篇
  1967年   1篇
排序方式: 共有185条查询结果,搜索用时 15 毫秒
71.
ABSTRACT .Desalting plants can provide a means of firming up erratic natural supplies when properly operated in conjunction with existing water supply reservoir systems. Since the natural inflow is variable, the choice of when to run the desalting plant is difficult. If the plant is turned on too late, a shortage may result; or if the plant runs too long, costly water may be wasted. A computer program is described that can help water planners find an optimal operating rule, i.e., a policy that tells when to turn the plant on and off to meet a given demand. Criteria for defining the firm water yield of the system (with and without desalting) are first defined. The logic of the program is then described. The program, written in FORTRAN IV, successively simulates operation of the given size reservoir-desalting plant system under control of various operating rules and selects the optimal rule as the one which produces the required firm water yield at the least unit cost. The optimal plant size and the staging of construction can also be studied by making a series of computations. Applications of the Operating Rule Program to water systems in California, Utah and New York are described. The studies show that, compared with base load operation, substantial savings are possible if optimum intermittent conjunctive operation of the desalting plant is followed.  相似文献   
72.
ABSTRACT: A modified version of the U.S. Environmental Protection Agency's QUAL-II water quality simulation model is calibrated and applied to the Lower Winooski River, Vermont. The river flows through the metropolitan Burlington area and is impacted by several industrial and municipal point sources and by operation of hydropower facilities. Several structural modifications are made in the model to improve water quality simulations in rivers impacted by algal growth; these include the addition of organic nitrogen and organic phosphorus compartments and provision for algal uptake of ammonia and/or nitrate nitrogen. The model is interfaced with statistical programs which facilitate tabulation, display, and analysis of observed and predicted concentrations. The model is calibrated and tested against data from two intensive water quality surveys. Applications demonstrate the factors controlling water quality and sensitivities to point source waste management strategies and flow, as influenced by hydropower operations.  相似文献   
73.
The Antley-Bixler syndrome is characterized by multiple skeletal fusions including humero-radial synostosis, anterior bowing of the femora, cardiac and renal malformations and a high incidence of early postnatal lethality. In the pregnancy of a mother who had previously given birth to a child with the Antley-Bixler syndrome, prenatal ultrasound diagnosis was performed at 17 and 20 weeks. Fixed flexion of about 80° in both elbows was seen together with humero-radial synostosis and bowing of the ulnae. The fetus performed jerky cranio-caudal movements in its shoulders, but did not, during five hours of real-time observation, move at all in the elbows. Mild anterior bowing of the femora was also observed. The pregnancy was terminated at 21 weeks, and radiological examination of the female fetus confirmed the above mentioned findings including complete bilateral humero-radial synostosis. She also had cardiac and renal malformations. An ultrasound diagnosis of syndromes which have humero-radial synostosis as one feature is possible. Immobility and flexion in the elbows during a long period is probably the essential diagnostic finding.  相似文献   
74.
ABSTRACT: Urban stormwater runoff has been recognized as a potential major contributor of pollution to receiving waters. However the projected high costs of control have prompted an examination of the extent to which these impacts have been documented. A nationwide search was conducted for case studies demonstrating a cause-effect linkage between urban runoff and impairment of beneficial uses in receiving waters. The results indicate that numerous definitions of “impacts” are being used and that few substantive data exist to support many of these allegations. Results of a preliminary impact assessment are presented for the 248 urbanized areas of the United States. Then, the results of more recent efforts to assess these impacts in several case studies are described. This assessment demonstrates the critical need for additional short-term and long-term sampling programs.  相似文献   
75.
ABSTRACT: An attempt was made to review all available data on the extent and status of riparian ecosystems in the U.S.A. This report presents a synthesis of the findings, including some estimates of how much land was originally covered by woody riparian vegetation, and how much remains in that condition today. A synopsis of information is presented on the status of riparian ecosystems in each of 10 regions: California, Pacific Northwest, Rocky Mountain, Arid Southwest, Plains-Grasslands, Lake States, Corn Belt, Mississippi Delta, Northeast-Appalachian, and Southeast. Woody riparian plant communities once covered an estimated 75 to 100 million acres of land in the contiguous 48 states. Mankind has converted at least two-thirds of that nationwide acreage to other non-forest land uses and it is estimated that only 25 to 35 million acres of riparian plant communities remain in a near natural condition. Across the country, loss of riparian acreages is directly attributable to water resource development (especially channel modification and water impoundment), floodplain clearing for agriculture, and urbanization. In many states of the arid west, the midwest, and the lower Mississippi alluvial valley, riparian vegetation has been reduced in area by more than 80 percent. Riparian woodlands are one of this country's most heavily modified natural vegetation types.  相似文献   
76.
ABSTRACT. The purpose of this paper is to present and discuss a procedure for finding an optimal staging plan for implementing a multi-basin water resource system-a system that must meet, with tolerable shortages, pre-specified but highly variable demands for water that increase over time-a system such as the proposed Texas Water System. The paper stresses that, in the past, planners have paid little attention to quantifying explicitly the impact that uncertainty has on the decision process, and in that context, presents a means for explicitly evaluating the impact that uncertainty has on finding and evaluating the performance of the optimal and several alternate staging plans. The procedure presented evaluates the impact that uncertainty, in both the hydrologic and the economic variables, has on the decisions that need to be made. The decisions requiring resolution are (1) which of an over-specified set of facilities should be constructed, (2) how large each of the facilities should be at various points in time, and (3) how should the system be operated so as to minimize the capital plus operational costs over the planning period.  相似文献   
77.
ABSTRACT. Most of Utah's rapid population and industrial expansion is taking place along the western base of the Wasatch Mountains, with consequent increases in water demand. As a part of Utah's “Developing a State Water Plan,” a foundation investigation of the Utah Lake drainage area, which is at the Southern end of the Wasatch Front, was completed which delineated the quantity and quality of the water resources, present water uses, and opportunities for further water conservation. To prepare water budgets, land use data was collected to delineate all areas using water in excess of normal precipitation, which includes agricultural croplands, phreatophytes, open water surfaces, industrial areas, and urban areas. The water budgets were prepared for the time base 1931-1960, but adjusted to physical conditions existing in 1960. The Initial Phase of the Bonneville Unit of the Central Utah Project is presently under construction, with costs expected to exceed 300 million dollars. The principal feature of this project is the exportation of waters from the Colorado River Basin into the Utah Lake drainage area (Great Basin). This importation provides a large number of alternatives for allocation, reallocation of present supplies, and exportation. The possible effects of the Central Utah Project for realizing some of the above alternatives is delineated. Fortunately, the features of this project allow a wide latitude for water management in Utah, thereby facilitating its corporation into a “State Water Plan.”  相似文献   
78.
ABSTRACT: West Bitter Creek floodwater retarding structure site 3 in South Central Oklahoma was instrumented and records obtained and analyzed to obtain information concerning an impoundment water budget that is useful to landowners and designers of these impoundments. On-site loss of water from the impoundment was only 17 percent of the inflow during three years when the annual precipitation averaged 26 inches and the annual inflow averaged 1.4 inches. Runoff from an eroded area with no farm ponds was about 70 percent greater per unit area than from a portion of the watershed where 71 percent of the drainage area was controlled by farm ponds. A previous study indicated, however, that the ponds were reducing runoff only 13 percent. Loss of top soil increases runoff considerably. Only 24 percent of the total runoff into the impoundment was base flow. The flow rate into the impoundment was less than 0.05 cfs 70 percent of the time, and the inflow rate exceeded 10 cfs only 1 percent of the time. SCS runoff curve numbers varied between 57 and 96 for the impoundment watershed with an inverse relation between precipitation amount and curve number apprently caused by partial area runoff from impervious and semi-impervious areas. A comparison of measured event runoff versus event runoff computed by the SCS curve numbers gave an r2 of only 0.44. However, the total computed surface runoff for eight years of record was less than 1 percent below the measured runoff which indicated the curve number method was a good tool for predicting long term runoff for the watershed.  相似文献   
79.
ABSTRACT This paper summarizes a study employing a systems approach for analyzing one class of modifications within a poultry processing plant. The modifications considered were changes in water-flow arrangements and process characteristics to reduce water intake of the plant and waste-treatment costs. The object of the study was to develop a technique or techniques by which a combination of proposed modifications could be chosen to minimize water flow through the plant. Existing and proposed flows were represented as a network, and linear programming was used to solve the minimum-flow problem for the network. Application of the technique was made to an existing, typical plant in Durham, N.C. Results of the application showed fresh water intake could be reduced by 45% to 51%, and furthermore that annual returns of 62% to 494% could be obtained on investment in the optimum modification sets, as fresh water costs varying from 10 cents to $1.00 per 1000 gal. Types of modifications of a poultry processing plant are classified by types, and the relative importance and effectiveness of each type are discussed.  相似文献   
80.
The Truckee River heads in the Sierra Nevada at Lake Tahoe, and terminates in Pyramid Lake. During the 1969 water year, flow about 9 miles upstream from the mouth (974,000 acre-ft) was almost four times the long-term average, due mainly to heavy winter rains and spring snowmelt. A short period of low-altitude rainfall produced the highest concentrations of suspended sediment, whereas a much longer subsequent period of snowmelt yielded a much greater total quantity of material. The upper 90 percent of the basin yielded about 260 acre-feet (630,000 tons) of sediment at the Nixon gage, whereas an estimated 2,800 acre-feet (6.8 million tons) was contributed by erosion of about 200 acres of river bank below the gage. Solute content at the gage ranged from 80 to 450 mg/l, dominated by calcium, sodium, and bicarbonate, plus silica in the most dilute snowmelt and chloride in the most concentrated low flows. Solute load totaled about 130,000 tons, of which the principal constituents in Pyramid Lake-sodium plus equivalent bicarbonate and chloride-amounted to almost 40,000 tons. The total solute load during a year of average flow may be 45,000-55,000 tons, including 18,000-22,000 tons of principal lake constituents.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号