首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   91篇
  免费   1篇
  国内免费   1篇
安全科学   4篇
废物处理   1篇
环保管理   12篇
综合类   10篇
基础理论   26篇
污染及防治   16篇
评价与监测   12篇
社会与环境   11篇
灾害及防治   1篇
  2022年   1篇
  2021年   1篇
  2020年   1篇
  2019年   2篇
  2018年   2篇
  2017年   4篇
  2016年   2篇
  2015年   1篇
  2014年   8篇
  2013年   10篇
  2012年   2篇
  2011年   11篇
  2010年   3篇
  2009年   8篇
  2008年   13篇
  2007年   4篇
  2006年   2篇
  2005年   5篇
  2004年   8篇
  2003年   1篇
  2001年   2篇
  1992年   2篇
排序方式: 共有93条查询结果,搜索用时 62 毫秒
1.
2.
Exposure to asphalt fumes has a threshold limit value (TLV of 0.5 mg m(-3) (benzene extractable inhalable particulate) as recommended by the American Conference of Governmental Industrial Hygienists (ACGIH). This reflects a recent change (2000) whereby two variables are different from the previous recommendation. First is a 10-fold reduction in quantity from 5 mg m(-3) to 0.5 mg m(-3). Secondly, the new TLV specifies the "inhalable" fraction as compared to what is presumed to be total particulate. To assess the impact of these changes, this study compares the differences between measurements of paving asphalt fume exposure in the field using an "inhalable" instrument versus the historically used 'total' sampler. Particle size is also examined to assist in the understanding of the aerodynamic collection differences as related to asphalt fumes and confounders. Results show that when exposures are limited to asphalt fumes, a 1:1 relationship exists between samplers, showing no statistically significant differences in benzene soluble matter (BSM). This means that for the asphalt fume ACGIH TLV, the 'total' 37-mm sampler is an equivalent method to the "inhalable" method, referred to as IOM (Institute of Occupational Medicine), and should be acceptable for use against the TLV. However, the study found that when confounders (dust or old asphalt millings) are present in the workplace, there can be significant differences between the two samplers' reported exposure. The ratio of IOM/Total was 1.37 for milling asphalt sites, 1.41 for asphalt paving over granular base, and 1.02 for asphalt over asphalt pavements.  相似文献   
3.
Partnerships and co-operative environmental management are increasing worldwide as is the call for scientific input in the public process of ecosystem management. In Hawaii, private landowners, non-governmental organizations, and state and federal agencies have formed watershed partnerships to conserve and better manage upland forested watersheds. In this paper, findings of an international workshop convened in Hawaii to explore the strengths of approaches used to assess stakeholder values of environmental resources and foster consensus in the public process of ecosystem management are presented. Authors draw upon field experience in projects throughout Hawaii, Southeast Asia, Africa and the US mainland to derive a set of lessons learned that can be applied to Hawaiian and other watershed partnerships in an effort to promote consensus and sustainable ecosystem management. Interdisciplinary science-based models can serve as effective tools to identify areas of potential consensus in the process of ecosystem management. Effective integration of scientific input in co-operative ecosystem management depends on the role of science, the stakeholders and decision-makers involved, and the common language utilized to compare tradeoffs. Trust is essential to consensus building and the integration of scientific input must be transparent and inclusive of public feedback. Consideration of all relevant stakeholders and the actual benefits and costs of management activities to each stakeholder is essential. Perceptions and intuitive responses of people can be as influential as analytical processes in decision-making and must be addressed. Deliberative, dynamic and iterative decision-making processes all influence the level of stakeholder achievement of consensus. In Hawaii, application of lessons learned can promote more informed and democratic decision processes, quality scientific analysis that is relevant, and legitimacy and public acceptance of ecosystem management.  相似文献   
4.
The socio-cultural assessment of ecosystem services has been proposed as a promising tool for eliciting people’s preferences towards ecosystem services. Despite an increasing integration of the socio-cultural perspective in ecosystem service research, little knowledge exists about linkages between landscape and the socio-cultural values people assign to ecosystem services. This paper combines a socio-cultural valuation approach with the use of landscape pictures to analyse and compare people’s perceived importance of the provisioning, regulating, and cultural ecosystem service categories across three landscape types (i.e. larch meadows, spruce forests, and hay meadow). A survey with 470 tourists visiting the region of South Tyrol (Italy) was conducted to link people’s perceived importance to their socio-demographic background and to the landscape types explored. The results show that regulating ecosystem services are preferred over provisioning and cultural services, whereby environmental awareness is found to be more influential than formal education levels regarding the perceived importance of regulating services. The results further demonstrate that cultural background is an important driver in determining people’s perceived importance of cultural services. The underlying landscape types, however, exert an even stronger influence on people’s socio-cultural valuation of ecosystem service categories. This finding suggests that the focus of most ecosystem services assessments on the study area as a whole risks mistakenly attributing differences in people’s socio-cultural values to socio-demographic characteristics only. A better knowledge of the spatial integration of socio-cultural values, however, could help with anticipating the consequences of changes in the landscape and provide better guidance for future landscape planning.  相似文献   
5.
6.
The Clean Water Act mandates that the chemical, physical, and biological integrity of our nation’s waters be maintained and restored. Physical integrity has often been defined as physical habitat integrity, and as such, data collected during biological monitoring programs focus primarily on habitat quality. However, we argue that channel stability is a more appropriate measure of physical integrity and that channel stability is a foundational element of physical habitat integrity in low-gradient alluvial streams. We highlight assessment tools that could supplement stream assessments and the Total Maximum Daily Load stressor identification process: field surveys of bankfull cross-sections; longitudinal thalweg profiles; particle size distribution; and regionally calibrated, visual, stream stability assessments. Benefits of measuring channel stability include a more informed selection of reference or best attainable stream condition for an Index of Biotic Integrity, establishment of a baseline for monitoring changes in present and future condition, and indication of channel stability for investigations of chemical and biological impairments associated with sediment discontinuity and loss of habitat quality.  相似文献   
7.
This paper discusses the current approaches to environmental protection from ionising radiation from an ecological perspective, highlighting the need to understand fully what we are trying to protect. Ecologically relevant endpoints for environmental protection are discussed along with the need to integrate protection from ionising radiation with the approaches adopted for non-radioactive contaminants. A possible integrated assessment approach is outlined.  相似文献   
8.
Using data obtained from 435 radiation sampling stations in the Red Forest, 1.5 km W if the Chernobyl Nuclear Complex, we reconstructed the deposition pathway of the first plume released by the accident, Chernobyl's Western Trace. The dimensions and deposition rates of the plume remain sharply defined 15 years after the accident. Assuming a uniform particle distribution within the original cloud, we derived estimates of plume dimensions by applying geometric transformations to the coordinates at each sample point. Our derived estimates for the radioactive cloud accounted for 87% of the variation of radioactivity in this region. Results show a highly integrated bell-shaped cross-section of the cloud of radiation, approximately 660 m wide and 290 m high, traveling at a bearing of 264 degrees from reactor IV. Particle sizes within Chernobyl's Western Trace were within the most dangerous range for inhaled aerosols (2-5 microm). Therefore, reconstruction of the dispersion of such particles is critical for understanding the aftermath of nuclear and biological aerosol releases.  相似文献   
9.
10.
Urban stream restoration continues to be used as an ecological management tool, despite uncertainty about the long‐term sustainability and resilience of restored systems. Evaluations of restoration success often focus on specific instream indicators, with limited attention to the wider basin or parallel hydrologic and geomorphic process. A comprehensive understanding of urban stream restoration progress is particularly important for comparisons with nonurban sites as urban streams can provide substantial secondary benefits to urban residents. Here, we utilize a wide range of indicators to retrospectively examine the restoration of Nine Mile Run, a multi‐million dollar stream restoration project in eastern Pittsburgh (Pennsylvania, USA). Examination of available continuous hydrological data illustrates the high cost of failures to incorporate the data into planning and adaptive management. For example, persistent extreme flows drive geomorphic degradation threatening to reverse hydrologic connections created by the restoration and impact the improved instream biotic communities. In addition, human activities associated with restoration efforts suggest a positive feedback as the stream restoration has focused effort on the basin beyond the reach. Ultimately, urban stream restoration remains a potentially useful management tool, but continued improvements in post‐project assessment should include examination of a wider range of indicators.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号