首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   3篇
  免费   0篇
污染及防治   1篇
社会与环境   2篇
  2021年   1篇
  2017年   1篇
  2014年   1篇
排序方式: 共有3条查询结果,搜索用时 93 毫秒
1
1.
In the first multipurpose river valley planning of India, the vast resources of Damodar River Basin (DRB) (eastern India) are not only to be envisioned in their entirety but also to be developed in a unified manner where the water, land, and people are simultaneously bounded in a seamless web. Four large dams (Konar, Tilaiya, Maithon, and Panchet), Durgapur barrage, and Tenughat reservoir are built to tamp the flood-prone Damodar River using water resource in an integrated method. The functionality of Damodar fluvial system is controlled by dams, barrage, weirs, sluices, embankments, and canals, maintaining a dynamic equilibrium between fluvial processes and anthropogenic processes. Carrying more than 50 years of legacy, the existing drainage and flood control system of Damodar Valley Corporation has aggravated a number of hydrogeomorphic problems especially in lower DRB, viz. siltation of river bed and reservoirs, uncontrolled monsoonal stream flow, declining carrying capacity of lower course, drainage congestion, low-magnitude annual floods, channel shifting, de-functioned canals, decay of paleochannels, decline of ground water level, and less replenishing of soils with fresh silts. The present paper is mainly tried to investigate the pre-dam and post-dam hydrogeomorphic variability in relation to flood risk and drawbacks of Damodar Valley Multipurpose Project. Specifically, the annual peak flow of Damodar shifts from August to September due to dam construction and reservoir storage. Applying the annual flood series of log Pearson type III distribution, we have estimated post-dam 5-year peak discharge of above 5,300 m3 s?1 and 100-year flood of above 11,000 m3 s?1. Due to siltation, the bankfull discharges of sample segments are gradually declined up to 4,011 m3 s?1, 2,366 m3 s?1, and 1,542 m3 s?1, respectively, having recurrence interval of 1.18–3.18 years only. With the regulation of monsoon flow, the standard sinuosity index is gradually increased downstream, having high dominance of hydraulic factors in respect of topographic factors. The upstream section of study area (Rhondia to Paikpara) now shows the dominance of aggradational landforms, braiding, avulsion, high width–depth ratio, breaching of right bank, and valley widening, but downstream of Barsul the phenomena of bank erosion, confined sinuosity, low width–depth ratio, and narrowness are more pronounced.  相似文献   
2.
Frequent erosion along the banks of the river Bhagirathi–Hooghly constitutes one of the most important hazards in West Bengal, India. This frequent nature of erosion is induced by hydraulic control by the construction of Farakka Barrage in 1975 and Indo-Bangladesh water sharing treaty of 1977 and 1996. Water sharing treaties result in fluctuating discharge on 10-day scale in the lean period (January–May). The stream discharge variability affects the bank erosion through its impacts on erodibility factors of banks. It has been observed that in the pre-Farakka period bank erosion was huge only during the monsoon months, and rest of the year, there was little or no bank erosion because in the pre-monsoon and post-monsoon periods, the river Bhagirathi received very little or no discharge from the river Ganga. But in the post-Farakka period, the river Bhagirathi received considerable amount of water in variable quantities from the river Ganga, especially in lean period which has steadied the river bank erosion in the year round. It is to mention that benefits of this planning are to survive the port-industrial economy of South Bengal and provision of fresh water for inhabitants of Kolkata. So beneficiaries of this controlled hydrology must have to pay affluent tax for the victims by this project. In this paper, the nature, mechanism and pattern of bank erosion and its impact on socio-economic vulnerability of the people in the selected erosion-prone areas have been depicted. At the end, a search for social justice for the victims has been articulated from the perspective of Pareto-optimal justice.  相似文献   
3.
Environmental Science and Pollution Research - Interactions of plastic particles with different organic/inorganic pollutants including heavy metals impact their ecotoxicological potential, and...  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号