首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   3篇
  免费   0篇
安全科学   1篇
综合类   1篇
污染及防治   1篇
  2023年   1篇
  2011年   1篇
  2001年   1篇
排序方式: 共有3条查询结果,搜索用时 0 毫秒
1
1.
Environmental Science and Pollution Research - Rivers are dynamic systems in complex interactions with their surrounding environments. Reliable and fast interpretation of water quality is therefore...  相似文献   
2.
A prenatal diagnosis of Pelizaeus-Merzbacher disease (PMD) resulting from proteolipid protein gene (PLP) duplication was performed by a quantitative fluorescent multiplex PCR method. PLP gene copy number was determined in the proband, the pregnant mother, the male fetus and two aunts. Small amounts of genomic DNA extracted from peripheral blood and from chorionic villi were used. The fetus, in common with the proband, was identified as PMD-affected being a carrier of the PLP gene duplication, inherited from the mother, while the two aunts were non-carriers. The data obtained were confirmed by segregation analysis of a PLP-associated dinucleotide-repeat polymorphism amplified by the same multiplex PCR. Copyright © 2001 John Wiley & Sons, Ltd.  相似文献   
3.
The European iNTeg-Risk project is a large-scale integrated project aimed at improving the management of emerging risks related to new technologies in European industry. The project aims to build a new management paradigm for emerging risks as a set of principles supported by a common language, agreed tools and methods, and key performance indicators, all integrated into a single framework. It is using a number of Emerging Risk Representative Applications (ERRAs), or case studies, to inform the development of the framework; one of which concerns the carbon capture and storage (CCS) process.This paper describes the iNTeg-Risk CCS ERRA. Relevant hazards and properties of carbon dioxide are described and the emerging risks from CCS are discussed. Three new tools have been developed or trialled within the ERRA. These are: the DyPASI methodology for taking account of atypical (not usually identified) events during hazard identification; a methodology for including the time dimension in a risk assessment; and life-cycle approaches for risk management and communication. For CCS, the risk assessment needs to include both short-term potential accidents from capture, transport or injection, as well as very long-term risks from storage. Knowledge gaps which are generic to emerging risks are also identified.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号