排序方式: 共有103条查询结果,搜索用时 15 毫秒
1.
武器装备电磁兼容性预测试技术初探 总被引:1,自引:1,他引:0
阐述了电磁兼容性(EMC)和电磁兼容测量的基本概念,通过分析EMC认证测试与EMC预测试的特点,总结了EMC预测试的优点.EMC预测试分为指标性预测试和故障诊断预测试.以一些EMC测试项为例,详细描述了这两种预测试的测试方法,最后简述了对电磁兼容性设计的整改措施. 相似文献
2.
3.
吴关林 《安全.健康和环境》2014,14(9):18-20
研究了净化厂新型延长型接地排在内的仪表接地体系,分析了现场装置仪表接地存在的问题,提出了抗干扰屏蔽接地、现场浪涌保护器防雷接地、DCS接地规范安装和现场工程师站接地电阻检查测量等方面的整改措施。 相似文献
4.
Sargaonkar A 《Environmental monitoring and assessment》2006,117(1-3):491-503
Non-point source (NPS) pollution is the result of various land use practices such as agriculture, sites of construction and
waste disposal, urban development and so on. The control of NPS pollution is possible by regular monitoring and assessment
on watershed basis to educate people for implementing well-known structural and non-structural measures. Recent trend is to
use GIS based modelling tool for assessment of rainfall-runoff and non-point loading. The approach requires generation and
analysis of basin wide data on various features of land and estimates of Event Mean Concentrations (EMCs) of pollutants in
the runoff. In the present paper, basin wide data in different districts of Tapi basin has been analysed for land use distribution;
fertilizer application; low, medium and high-density habitation; and annual rainfall. Coefficients of runoff have been estimated
considering pervious and impervious area for different land use types, and compared with the reported values for Indian conditions.
The estimated mean annual runoff flow indicated that two districts Jalgaon and Dhule contribute maximum runoff to the Tapi
River. Estimates of EMCs for BOD and nutrients (N and P) in the runoff from various districts are useful in GIS-based modelling
study for NPS pollution assessment. 相似文献
5.
本文针对2009年1月1日即将实施的GB4706.2—2007熨斗国家标准,分析了某智能控制电熨斗电路原理,介绍第19章非正常测试,讨论判定条款,常规CE中的EMC与19.11.14条EMC项目的差异。 相似文献
6.
文章以数模混合电路设计实践为基础,介绍了一种基于预测法的电磁兼容设计方法。先以电磁兼容测试理论为基础介绍数模混合电路设计中的电磁兼容方法,在以此方法建立电磁兼容设计模型,并通数模混合电路实践来检验和改进设计模型。 相似文献
7.
8.
介绍了接地的目的和种类,针对大型测控设备对接地电阻值的要求,提出了区域面积受限的接地系统设计方案,并对接地电阻进行了详细分析、计算和比较,选出了合理的接地方案进行施工,竣工后对接地系统的接地电阻值进行检测,检测结果满足测控设备接地电阻的要求. 相似文献
9.
10.