首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
社会与环境   1篇
  2013年   1篇
排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
A great amount of energy is wasted in industry by machines that remain idle due to underutilisation. A way to avoid wasting energy and thus reducing the carbon print of an industrial plant is to consider minimisation of energy consumption objective while making scheduling decisions. To minimise energy consumption, the decision maker has to decide the timing and length of turn off/turn on operation (a setup) and also provide a sequence of jobs that minimises the scheduling objective, assuming that all jobs are not available at the same time. In this paper, a framework to solve a multiobjective optimisation problem that minimises total energy consumption and total tardiness is proposed. Since total tardiness problem with release dates is an NP‐hard problem, a new greedy randomised multiobjective adaptive search metaheuristic is utilised to obtain an approximate pareto front (i.e. an approximate set of non‐dominated solutions). Analytical Hierarchy Process is utilised to determine the ‘best’ alternative among the solutions on the pareto front. The proposed framework is illustrated in a case study. It is shown that a wide variety of dispersed solutions can be obtained via the proposed framework, and as total tardiness decreases, total energy consumption increases.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号