首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Flood control failure: San Lorenzo River,California
Authors:Gary B Griggs  Lance Paris
Institution:(1) Department of Earth Sciences, University of California at Santa Cruz, 95064 Santa Cruz, California
Abstract:The San Lorenzo River on the central California coast was the site of a major US Army Corps of Engineers flood control project in 1959. By excavating the channel below its natural grade and constructing levees, the capacity of the river was increased in order to contain approximately the 100 year flood. Production and transport of large volumes of sediment from the river's urbanizing watershed has filled the flood control project with sand and silt. The natural gradient has been re-established, and flood protection has been reduced to containment of perhaps the 30 year flood. In order for the City of Santa Cruz, which is situated on the flood plain, to be protected from future flooding,it must either initiate an expensive annual dredging program, or replan and rebuild the inadequately designed flood control channel. It has become clear, here and elsewhere, that the problem of flooding cannot simply be resolved by engineering. Large flood control projects provide a false sense of security and commonly produce unexpected channel changes.
Keywords:Flood control  Sediment transport  San Lorenzo River
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号