Abstract: | ABSTRACT: Temporary transfers of water for dry year water supply are analyzed for cost and operational feasibility. The temporary transfer is implemented as part of a water rights option agreement (WROA) between a lesson and a lessee. First, engineering analysis determines the technical feasibility and operations plan under the Colorado doctrine of prior appropriation. The cost of the WROA to a water utility is estimated. Other considerations in the agreement are discussed. The WROA is compared to other dry-year supply alternatives using a water system simulation model to obtain expected cost and operational performance characteristics. |